IDOT contract 62X39 bid tabulation

Section (125X-HB(1&2)R-1). Let by Illinois DOT on April 25, 2025, Lake, District 01. 2 bids received; low bid $198,854 by Schroeder Asphalt Services, Inc..

Owner
Illinois DOT
Letting
25 APR 2025
Pay items
21
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Schroeder Asphalt Services, Inc.$198,854Low
2Peter Baker & Son Co.$248,123+25%
IDOT contract 62X39: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Schroeder Asphalt Services, Inc.2. Peter Baker & Son Co.
1PCC surf rem var DP (X4400100)SY665$18.00$27.00
2Engrs FLD ofc TY A D1 (X6700407)CAL MO6$3,000.00$1,000.00
3Temp info signing (X7200061)SF50$23.00$18.00
4Construction layout (Z0013798)LS1$2,000.00$5,955.00
5Bit matls tack CT (40600290)LB262$0.01$20.00
6Long joint sealant (40600370)LF373$27.00$31.00
7P HMA SC SMA 9.5 F N80 (40605026)TON84$400.00$326.00
8R&R PR elas JT SE PVT (44900105)LF92$590.00$220.50
9JT CR RT PCC pav/SHLD (45200100)LF52$40.00$50.00
10JT or crack filling (45200300)LB20$190.00$50.00
11R&R rail elem EX GDRL (63300575)LF200$25.00$20.00
12Shoulder rum strip 16 (64200116)LF109$45.00$51.00
13Mobilization (67100100)LS1$15,000$33,407
14Traf cont-prot 701421 (70100310)LS1$10,000$95,370
15Traf cont-prot 701411 (70100420)EACH1$10,000$100.00
16Short term pavt mking (70300100)LF144$10.00$1.00
17SHRT TRM pavt MK rem (70300150)SF48$20.00$20.00
18Remov sin pan assy TB (72400200)EACH3$380.00$315.00
19THPL PVT MK line 4 (78000200)LF282$27.50$15.40
20Raised refl pavt MKR (78100100)EACH2$2,800.00$2,006.00
21Raised ref PVT MK rem (78300200)EACH2$50.00$200.00
IDOT contract 62X39: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy