IDOT contract 76U26 bid tabulation
Section (103,104)RS-2,119RS-1. Let by Illinois DOT on April 25, 2025, Madison, District 08. 2 bids received; low bid $25,874,598 by Charles E. Mahoney Co..
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 56
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Charles E. Mahoney Co. | $25,874,598 | Low |
| 2 | Christ Bros. Asphalt, Inc. | $26,578,558 | +3.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Charles E. Mahoney Co. | 2. Christ Bros. Asphalt, Inc. |
|---|---|---|---|---|---|
| 1 | CL A patch T1 9 SPL (X4420543) | SY | 8 | $297.85 | $320.00 |
| 2 | CL A patch T2 9 SPL (X4420545) | SY | 198 | $297.85 | $320.00 |
| 3 | CL A patch T3 9 SPL (X4420547) | SY | 106 | $297.85 | $320.00 |
| 4 | CL A patch T4 9 SPL (X4420549) | SY | 25,400 | $217.15 | $320.00 |
| 5 | Traf bar term T6B SPL (X6311217) | EACH | 6 | $3,995.50 | $4,725.00 |
| 6 | Det loop repl (X8860105) | LF | 8,467 | $25.00 | $25.00 |
| 7 | Paint curb (Z0036200) | LF | 1,239 | $4.00 | $6.76 |
| 8 | Trainees TPG (Z0076604) | HR | 4,000 | $15.00 | $15.00 |
| 9 | Bit matls tack CT (40600290) | LB | 141,909 | $3.75 | $2.75 |
| 10 | Long joint sealant (40600370) | LF | 92,287 | $3.63 | $3.77 |
| 11 | Matl transfer device (40600405) | TON | 44,151 | $9.08 | $6.89 |
| 12 | HMA surf rem butt JT (40600982) | SY | 4,820 | $8.00 | $6.89 |
| 13 | PCC surf rem butt JT (40600985) | SY | 1,683 | $18.00 | $6.89 |
| 14 | Temporary ramp (40600990) | SY | 2,191 | $16.74 | $0.01 |
| 15 | P HMA BC IL19.0 N90 (40603240) | TON | 26,491 | $161.73 | $140.21 |
| 16 | P HMA SC IL-9.5 E N90 (40604174) | TON | 17,660 | $190.29 | $140.21 |
| 17 | HMA surf rem 2 1/2 (44000159) | SY | 301,595 | $6.97 | $6.89 |
| 18 | Patch reinforcement (44213000) | SY | 25,712 | $56.40 | $75.00 |
| 19 | Saw cuts (44213200) | LF | 61,330 | $8.93 | $10.00 |
| 20 | Tie bars 3/4 (44213204) | EACH | 6,075 | $30.00 | $5.00 |
| 21 | Aggregate SHLDS B (48101200) | TON | 1,030 | $76.25 | $63.39 |
| 22 | Agg wedge SHLD type B (48102100) | TON | 3,977 | $76.25 | $63.39 |
| 23 | HMA shoulders (48203100) | TON | 19,030 | $152.77 | $140.21 |
| 24 | Inlets adjust (60260100) | EACH | 21 | $4,469.86 | $1,232.00 |
| 25 | Comb CC&G TB6.06 (60603500) | LF | 62 | $257.25 | $80.00 |
| 26 | Comb CC&G TY B-6.24 (60605000) | LF | 99 | $183.75 | $80.00 |
| 27 | Conc median surf 4 (60618300) | SF | 882 | $28.30 | $25.00 |
| 28 | SPBGR TY A 6FT posts (63000001) | LF | 7,850 | $30.40 | $31.00 |
| 29 | Traf bar term T2 (63100045) | EACH | 7 | $1,460.00 | $2,250.00 |
| 30 | Traf bar term T6 (63100085) | EACH | 3 | $3,595.00 | $5,200.00 |
| 31 | TR bar TRM T1 SPL tan (63100167) | EACH | 8 | $3,385.00 | $3,425.00 |
| 32 | Guardrail remov (63200310) | LF | 8,647 | $7.60 | $7.00 |
| 33 | Delineators (63500105) | EACH | 16 | $109.15 | $42.25 |
| 34 | Engr field office A (67000400) | CAL MO | 7 | $3,304.21 | $2,500.00 |
| 35 | Mobilization (67100100) | LS | 1 | $1,950,468 | $1,892,676 |
| 36 | Traf cont-prot 701422 (70100320) | LS | 1 | $341,966 | $437,625 |
| 37 | TR cont & prot 701601 (70102630) | LS | 1 | $166,595 | $20,000 |
| 38 | Changeable message SN (70107025) | CAL DAY | 2,100 | $31.00 | $65.00 |
| 39 | Short term pavt mking (70300100) | LF | 4,996 | $3.50 | $2.35 |
| 40 | SHRT TRM pavt MK rem (70300150) | SF | 1,691 | $7.05 | $0.01 |
| 41 | Temp PVT MK LTR & sym paint (70300211) | SF | 878 | $2.46 | $0.01 |
| 42 | Temp PVT MK line 6 - paint (70300241) | LF | 149,780 | $0.13 | $0.01 |
| 43 | Temp PVT MK line 8 - paint (70300251) | LF | 2,744 | $0.15 | $0.01 |
| 44 | Temp PVT MK line 12 - paint (70300261) | LF | 2,009 | $2.46 | $0.01 |
| 45 | Temp PVT MK line 24 - paint (70300281) | LF | 667 | $4.92 | $0.01 |
| 46 | Terminal marker - DA (72501000) | EACH | 8 | $25.00 | $42.00 |
| 47 | THPL PVT MK LTR & sym (78000100) | SF | 878 | $10.00 | $7.77 |
| 48 | THPL PVT MK line 6 (78000400) | LF | 149,780 | $0.85 | $0.78 |
| 49 | THPL PVT MK line 8 (78000500) | LF | 2,744 | $2.00 | $2.51 |
| 50 | THPL PVT MK line 12 (78000600) | LF | 2,009 | $8.00 | $3.86 |
| 51 | THPL PVT MK line 24 (78000650) | LF | 667 | $15.00 | $7.77 |
| 52 | Raised refl pavt MKR (78100100) | EACH | 1,158 | $41.30 | $32.83 |
| 53 | Grdrail ref type A (78200005) | EACH | 218 | $9.00 | $12.00 |
| 54 | Curb reflectors (78200020) | EACH | 22 | $15.00 | $93.64 |
| 55 | Raised ref PVT MK rem (78300200) | EACH | 1,158 | $7.68 | $0.01 |
| 56 | PVT MKG rem WTR blast (78300202) | SF | 80,941 | $0.43 | $0.01 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.