IDOT contract 61L33 bid tabulation
Glenview, section 24-00214-00-RS. Let by Illinois DOT on April 25, 2025, Cook, District 01. 3 bids received; low bid $2,603,039 by Peter Baker & Son Co..
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 101
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Peter Baker & Son Co. | $2,603,039 | Low |
| 2 | Schroeder Asphalt Services, Inc. | $2,898,941 | +11% |
| 3 | Builders Paving, LLC | $2,994,765 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Peter Baker & Son Co. | 2. Schroeder Asphalt Services, Inc. | 3. Builders Paving, LLC |
|---|---|---|---|---|---|---|
| 1 | Decor base comb maa&P (XX006596) | EACH | 8 | $6,600.00 | $7,000.00 | $9,000.00 |
| 2 | HMA drive rem & rep (XX006947) | SY | 69 | $80.00 | $75.00 | $93.00 |
| 3 | Mortar EX structure (XX008348) | EACH | 6 | $215.00 | $550.00 | $525.00 |
| 4 | Pavement marking SPL (XX008910) | SF | 561 | $15.00 | $20.00 | $17.00 |
| 5 | Dec base TS post (XX009599) | EACH | 13 | $6,600.00 | $7,000.00 | $8,600.00 |
| 6 | LED in IL stname sign (X0327698) | EACH | 8 | $4,839.00 | $5,000.00 | $5,000.00 |
| 7 | R R FL beacon A comp (X1400326) | EACH | 2 | $16,987 | $18,000 | $17,000 |
| 8 | Ped signal post 5 FT (X1400378) | EACH | 5 | $1,690.00 | $1,800.00 | $1,700.00 |
| 9 | Ecc SNM SN 14 3C soow (X1400424) | LF | 1,243 | $4.60 | $5.00 | $4.60 |
| 10 | Rebld EX HD handhole (X1400450) | EACH | 1 | $7,385.00 | $8,000.00 | $7,400.00 |
| 11 | Temp access- priv ent (X4021000) | EACH | 80 | $50.00 | $60.00 | $50.00 |
| 12 | Temp access- com ent (X4022000) | EACH | 15 | $60.00 | $70.00 | $60.00 |
| 13 | PCC driveway PVT 6 SP (X4230710) | SY | 433 | $120.00 | $140.00 | $130.00 |
| 14 | PCC driveway PVT 8 SP (X4230800) | SY | 98 | $125.00 | $150.00 | $140.00 |
| 15 | Detectable warn SPL (X4240800) | SF | 128 | $60.00 | $52.00 | $50.00 |
| 16 | FR & lids adjust SPL (X6030310) | EACH | 88 | $1,285.00 | $1,350.00 | $1,250.00 |
| 17 | Temp info signing (X7200061) | SF | 310 | $17.00 | $20.00 | $18.00 |
| 18 | Methyl meth PVMT color GRN (X7800010) | SY | 908 | $75.00 | $80.00 | $60.00 |
| 19 | RCSD refl PVT MKR HMA (X7810301) | EACH | 346 | $2.15 | $55.00 | $70.00 |
| 20 | Rebld EX DBL handhole (X8140238) | EACH | 1 | $7,615.00 | $8,100.00 | $7,615.00 |
| 21 | Paint new ped P-B PST (X8510204) | EACH | 5 | $256.00 | $275.00 | $256.00 |
| 22 | Accessible ped signal (X8760200) | EACH | 8 | $2,458.00 | $2,600.00 | $2,500.00 |
| 23 | Conc FDN TY A 12D (X8780012) | LF | 24 | $494.00 | $525.00 | $494.00 |
| 24 | Det loop repl (X8860105) | LF | 242 | $41.20 | $44.00 | $42.00 |
| 25 | Construction layout (Z0013798) | LS | 1 | $4,900.00 | $7,000.00 | $18,000 |
| 26 | Drain util STR adj (Z0017400) | EACH | 79 | $690.00 | $500.00 | $465.00 |
| 27 | Drain util STR recon (Z0017700) | EACH | 2 | $2,250.00 | $2,000.00 | $1,850.00 |
| 28 | RE-optimize TR sig sys 1 (Z0033044) | EACH | 4 | $1,653.00 | $1,750.00 | $1,653.00 |
| 29 | Tree trunk protection (20101100) | EACH | 30 | $100.00 | $200.00 | $350.00 |
| 30 | Tree root pruning (20101200) | EACH | 30 | $75.00 | $150.00 | $350.00 |
| 31 | Earth excavation (20200100) | CY | 40 | $55.00 | $50.00 | $50.00 |
| 32 | Rem & disp uns matl (20201200) | CY | 117 | $50.00 | $60.00 | $120.00 |
| 33 | Geotech fab F/GR stab (21001000) | SY | 1,175 | $1.10 | $3.00 | $2.00 |
| 34 | Topsoil F & P 4 (21101615) | SY | 1,970 | $6.00 | $7.50 | $15.00 |
| 35 | Sodding salt tolerant (25200110) | SY | 1,970 | $18.00 | $19.25 | $25.00 |
| 36 | Supple watering (25200200) | UNIT | 107 | $0.01 | $2.00 | $1.00 |
| 37 | Inlet filters (28000510) | EACH | 116 | $205.00 | $200.00 | $200.00 |
| 38 | Agg subgrade improve (30300001) | CY | 39 | $50.00 | $60.00 | $50.00 |
| 39 | Agg subgrade impr 12 (30300112) | SY | 235 | $20.00 | $70.00 | $50.00 |
| 40 | Agg base cse B 4 (35101600) | SY | 1,803 | $6.75 | $9.00 | $8.00 |
| 41 | Agg base cse B 6 (35101800) | SY | 266 | $10.00 | $11.00 | $8.00 |
| 42 | Agg base cse B 8 (35102000) | SY | 35 | $13.50 | $15.00 | $10.00 |
| 43 | Bit matls tack CT (40600290) | LB | 26,110 | $0.01 | $0.01 | $0.01 |
| 44 | Long joint sealant (40600370) | LF | 11,915 | $3.95 | $3.25 | $4.50 |
| 45 | Mix CR JTS flangewys (40600400) | TON | 34 | $75.00 | $300.00 | $750.00 |
| 46 | HMA surf rem butt JT (40600982) | SY | 801 | $1.00 | $7.00 | $5.00 |
| 47 | P HMA BC IL-4.75 N50 (40603200) | TON | 2,128 | $110.50 | $125.00 | $115.00 |
| 48 | HMA SC IL-9.5 D N70 (40604062) | TON | 4,334 | $82.75 | $89.00 | $95.00 |
| 49 | Protective coat (42001300) | SY | 1,803 | $0.01 | $2.00 | $1.00 |
| 50 | PC conc sidewalk 5 (42400200) | SF | 6,497 | $12.00 | $13.00 | $12.00 |
| 51 | PC conc sidewalk 6 (42400300) | SF | 652 | $13.00 | $13.00 | $12.00 |
| 52 | HMA surf rem 3 (44000161) | SY | 38,681 | $4.95 | $4.75 | $6.75 |
| 53 | Comb curb gutter rem (44000500) | LF | 5,612 | $11.25 | $13.00 | $12.00 |
| 54 | Sidewalk rem (44000600) | SF | 6,498 | $3.25 | $10.25 | $10.00 |
| 55 | CL D patch T1 8 (44201737) | SY | 100 | $90.00 | $86.00 | $110.00 |
| 56 | CL D patch T2 8 (44201741) | SY | 200 | $80.00 | $84.00 | $80.00 |
| 57 | CL D patch T3 8 (44201745) | SY | 350 | $70.00 | $82.00 | $70.00 |
| 58 | CL D patch T4 8 (44201747) | SY | 525 | $60.00 | $80.00 | $60.00 |
| 59 | FR & grates T24 (60404950) | EACH | 8 | $400.00 | $625.00 | $585.00 |
| 60 | FR & lids T1 CL (60406100) | EACH | 8 | $400.00 | $475.00 | $450.00 |
| 61 | Comb CC&G TB6.12 (60603800) | LF | 732 | $54.00 | $48.00 | $45.00 |
| 62 | Comb CC&G TY B-6.24 (60605000) | LF | 4,880 | $54.00 | $58.00 | $55.00 |
| 63 | Non SPL waste disposl (66900200) | CY | 150 | $95.00 | $150.00 | $150.00 |
| 64 | Soil disposal analy (66900530) | EACH | 4 | $1,000.00 | $1,100.00 | $1,000.00 |
| 65 | Reg sub P-const plan (66901001) | LS | 1 | $5,300.00 | $5,700.00 | $5,300.00 |
| 66 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $1,000.00 | $500.00 |
| 67 | Reg sub mon (66901006) | CAL DAY | 11 | $700.00 | $750.00 | $1,200.00 |
| 68 | Mobilization (67100100) | LS | 1 | $143,290 | $50,000 | $110,000 |
| 69 | TR cont & prot 701501 (70102620) | LS | 1 | $1.00 | $2.00 | $70,000 |
| 70 | TR cont & prot 701502 (70102622) | LS | 1 | $1.00 | $2.00 | $1.00 |
| 71 | TR cont & prot 701602 (70102632) | LS | 1 | $35,600 | $25,000 | $1.00 |
| 72 | TR cont & prot 701701 (70102635) | LS | 1 | $1.00 | $2.00 | $1.00 |
| 73 | TR cont & prot 701801 (70102640) | LS | 1 | $10,000 | $25,000 | $10,000 |
| 74 | Short term pavt mking (70300100) | LF | 11,725 | $0.70 | $2.00 | $2.00 |
| 75 | SHRT TRM pavt MK rem (70300150) | SF | 9,773 | $0.01 | $3.00 | $0.01 |
| 76 | Temp PVT MK LTR & sym paint (70300211) | SF | 671 | $0.01 | $2.00 | $0.01 |
| 77 | Temp PVT MK line 4 - paint (70300221) | LF | 97,758 | $0.01 | $0.50 | $0.01 |
| 78 | Temp PVT MK line 6 - paint (70300241) | LF | 19,734 | $0.01 | $0.50 | $0.01 |
| 79 | Temp PVT MK line 12 - paint (70300261) | LF | 4,686 | $0.01 | $1.00 | $0.01 |
| 80 | Temp PVT MK line 24 - paint (70300281) | LF | 1,152 | $0.01 | $2.00 | $0.01 |
| 81 | Sign panel T1 (72000100) | SF | 17 | $50.00 | $60.00 | $32.00 |
| 82 | Remov sin pan assy TA (72400100) | EACH | 30 | $100.00 | $110.00 | $75.00 |
| 83 | Remov sin pan assy TB (72400200) | EACH | 30 | $100.00 | $110.00 | $100.00 |
| 84 | THPL PVT MK LTR & sym (78000100) | SF | 671 | $5.05 | $5.40 | $8.00 |
| 85 | THPL PVT MK line 4 (78000200) | LF | 32,586 | $0.67 | $0.70 | $0.90 |
| 86 | THPL PVT MK line 6 (78000400) | LF | 6,578 | $1.25 | $1.40 | $1.50 |
| 87 | THPL PVT MK line 12 (78000600) | LF | 1,562 | $2.50 | $2.75 | $4.00 |
| 88 | THPL PVT MK line 24 (78000650) | LF | 384 | $5.05 | $5.40 | $7.50 |
| 89 | Raised ref PVT MK rem (78300200) | EACH | 346 | $15.00 | $53.00 | $21.00 |
| 90 | PVT MKG rem WTR blast (78300202) | SF | 16,373 | $0.75 | $1.00 | $0.01 |
| 91 | Undrgrd C galvs 2 (81028200) | LF | 58 | $83.90 | $89.00 | $83.90 |
| 92 | Main EX TR sig instal (85000200) | EACH | 2 | $6,800.00 | $7,250.00 | $6,800.00 |
| 93 | Paint EX TR sig equip (85100100) | EACH | 2 | $36,875 | $40,000 | $47,000 |
| 94 | Elcbl C signal 14 2C (87301215) | LF | 180 | $6.60 | $7.00 | $6.60 |
| 95 | Elcbl C egrdc 6 1C (87301900) | LF | 180 | $7.30 | $8.00 | $7.30 |
| 96 | Drill EX handhole (87900200) | EACH | 5 | $1,037.00 | $1,100.00 | $1,037.00 |
| 97 | Det loop T1 (88600100) | LF | 1,509 | $31.00 | $33.00 | $31.00 |
| 98 | Reloc EX ped push-but (89500400) | EACH | 5 | $862.00 | $920.00 | $862.00 |
| 99 | Rem elcbl FR con (89502300) | LF | 200 | $0.70 | $0.75 | $0.70 |
| 100 | Remov EX TS equip (89502375) | EACH | 2 | $2,720.00 | $3,000.00 | $2,720.00 |
| 101 | Rebuild EX handhole (89502376) | EACH | 4 | $3,755.00 | $4,000.00 | $3,775.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.