IDOT contract 70G71 bid tabulation
Section (121)BR-1,(114)BR-1. Let by Illinois DOT on April 25, 2025, Vermilion, District 05. 3 bids received; low bid $1,634,866 by Sangamo Construction Company.
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 50
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Sangamo Construction Company | $1,634,866 | Low |
| 2 | Stark Excavating, Inc. | $1,769,875 | +8.0% |
| 3 | William Charles Construction Company, LLC | $2,231,876 | +37% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Sangamo Construction Company | 2. Stark Excavating, Inc. | 3. William Charles Construction Company, LLC |
|---|---|---|---|---|---|---|
| 1 | Acrylic coating (X0325748) | SY | 15 | $270.09 | $23.00 | $80.00 |
| 2 | Fiber wrap (X0325749) | SF | 132 | $169.47 | $115.00 | $118.00 |
| 3 | BR deck grooving long (X5030250) | SY | 1,909 | $10.32 | $12.00 | $15.00 |
| 4 | Inlet box adj SPL (X6020050) | EACH | 4 | $3,883.95 | $4,275.00 | $3,000.00 |
| 5 | Width restrict sign (X7200201) | LS | 1 | $2,410.64 | $2,500.00 | $1,980.00 |
| 6 | Jack & rem EX bearing (Z0001899) | EACH | 10 | $1,219.27 | $2,000.00 | $4,000.00 |
| 7 | BRD flyash/slag 2 1/2 (Z0012111) | SY | 1,921 | $145.96 | $155.00 | $220.00 |
| 8 | BRD flyash/slag 4 (Z0012117) | SY | 272 | $179.09 | $180.00 | $250.00 |
| 9 | BR deck scar 3/4 (Z0012130) | SY | 2,193 | $79.90 | $85.00 | $80.00 |
| 10 | STR rep con DP = < 5 (Z0012754) | SF | 96.50 | $311.80 | $245.00 | $260.00 |
| 11 | Construction layout (Z0013798) | LS | 1 | $27,802 | $15,000 | $24,000 |
| 12 | Deck slab rep (FD-T1) (Z0016001) | SY | 11.20 | $2,076.68 | $3,400.00 | $3,200.00 |
| 13 | Deck slab rep (FD-T2) (Z0016002) | SY | 152.30 | $1,067.54 | $1,650.00 | $2,500.00 |
| 14 | Diamond grind BR sec (Z0029090) | SY | 2,060 | $16.08 | $18.00 | $21.00 |
| 15 | P P conc I-BM repair (Z0043800) | SF | 20 | $688.46 | $230.00 | $300.00 |
| 16 | Trainees (Z0076600) | HR | 1,000 | $0.80 | $0.80 | $0.80 |
| 17 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 | $15.00 |
| 18 | Earth excavation (20200100) | CY | 138 | $204.42 | $230.00 | $200.00 |
| 19 | Bit matls tack CT (40600290) | LB | 532 | $5.30 | $5.25 | $5.00 |
| 20 | HMA surf rem butt JT (40600982) | SY | 531 | $39.19 | $38.00 | $37.00 |
| 21 | HMA SC IL-9.5 C N50 (40604050) | TON | 49 | $953.26 | $950.00 | $900.00 |
| 22 | HMA surf rem 1 1/2 (44000155) | SY | 272 | $38.13 | $15.75 | $50.00 |
| 23 | HMA surf rem 2 (44000157) | SY | 215 | $58.25 | $58.00 | $55.00 |
| 24 | HMA shoulders 2 (48203005) | SY | 215 | $47.66 | $54.00 | $45.00 |
| 25 | HMA shoulders 8 (48203029) | SY | 471 | $158.88 | $160.00 | $190.00 |
| 26 | Conc rem (50102400) | CY | 9.50 | $3,390.12 | $4,750.00 | $7,000.00 |
| 27 | Conc sup-STR (50300255) | CY | 10.60 | $3,859.89 | $4,685.00 | $8,000.00 |
| 28 | Protective coat (50300300) | SY | 2,218 | $3.68 | $5.50 | $5.00 |
| 29 | Reinf bars, epoxy CTD (50800205) | LB | 1,040 | $8.02 | $9.00 | $15.00 |
| 30 | Bar splicers (50800515) | EACH | 24 | $92.70 | $60.00 | $100.00 |
| 31 | Pref JT strip seal (52000110) | LF | 68 | $282.67 | $290.00 | $525.00 |
| 32 | Elast bearing assy T2 (52100020) | EACH | 10 | $1,200.00 | $2,400.00 | $4,000.00 |
| 33 | Anchor bolts 1 (52100520) | EACH | 20 | $186.29 | $195.00 | $200.00 |
| 34 | SPBGR TY A 6FT posts (63000001) | LF | 300 | $37.74 | $29.00 | $35.00 |
| 35 | Traf bar term T6 (63100085) | EACH | 4 | $4,880.23 | $3,400.00 | $4,400.00 |
| 36 | TR bar TRM T1 SPL tan (63100167) | EACH | 4 | $3,774.27 | $2,900.00 | $3,800.00 |
| 37 | Guardrail remov (63200310) | LF | 710 | $9.17 | $8.50 | $6.00 |
| 38 | Engr field office B (67000500) | CAL MO | 6 | $2,998.83 | $2,800.00 | $4,000.00 |
| 39 | Mobilization (67100100) | LS | 1 | $96,457 | $105,750 | $133,800 |
| 40 | Traf cont-prot 701316 (70100100) | EACH | 2 | $1.00 | $500.00 | $500.00 |
| 41 | Traf cont-prot 701321 (70100405) | EACH | 2 | $32,173 | $25,000 | $25,000 |
| 42 | Traf cont-prot 701201 (70100450) | LS | 1 | $30,983 | $15,000 | $1,200.00 |
| 43 | Temp BR traf signals (70106500) | EACH | 2 | $15,888 | $25,000 | $25,000 |
| 44 | Changeable message SN (70107025) | CAL DAY | 56 | $158.88 | $155.00 | $150.00 |
| 45 | Temp conc barrier (70400100) | LF | 1,412.50 | $55.73 | $55.00 | $75.00 |
| 46 | Rel temp conc barrier (70400200) | LF | 1,412.50 | $9.56 | $9.75 | $12.00 |
| 47 | Imp attn temp NRD TL3 (70600250) | EACH | 4 | $4,183.74 | $5,000.00 | $3,950.00 |
| 48 | Imp attn rel NRD TL3 (70600350) | EACH | 4 | $529.59 | $950.00 | $500.00 |
| 49 | Terminal marker - DA (72501000) | EACH | 4 | $53.92 | $40.00 | $50.00 |
| 50 | Grdrail ref type A (78200005) | EACH | 10 | $33.70 | $25.00 | $15.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.