IDOT contract 68A65 bid tabulation

Section 118RS-8,W-2. Let by Illinois DOT on April 25, 2025, Tazewell, District 04. 1 bid received; low bid $11,849,961 by R. A. Cullinan and Son, a div of UCM, Inc..

Owner
Illinois DOT
Letting
25 APR 2025
Pay items
235
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1R. A. Cullinan and Son, a div of UCM, Inc.$11,849,961Low
IDOT contract 68A65: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. R. A. Cullinan and Son, a div of UCM, Inc.
1T-cercis canad CG 5G (A2C025G5)EACH10$85.80
2T-syring ret CG 5G (B20018G5)EACH7$632.50
3T-malus roy RRC 2 1/2 (B2004712)EACH3$723.80
4S-hydra quercif BR 3G (C2003605)EACH15$96.80
5S-rhus aroma GL 5G (C20058G5)EACH50$103.40
6S-junip virg BM 5G (C20154G5)EACH11$101.20
7P PL ornament T 5G P (K0012995)UNIT0.17$10,010
8Perenn PLNT PT 2GAL (K0013022)UNIT0.10$8,580.00
9River rock 6" (K1001980)SY356$25.03
10Constr sta layout (XZ013798)LS1$0.01
11Weed barrier fabric (X0321501)SY356$6.33
12Video insp of SS (X0323160)LF925$2.75
13R R FL beacon A comp (X1400326)EACH8$26,950
14PLNTG soil mix F&P 12 (X2111212)SY356$30.53
15Rem & rel sign panel (X2600011)EACH1$4,084.50
16PC conc sidewalk 4 SP (X4240420)SF775$23.39
17PC conc sidewalk 6 SP (X4240440)SF3,671$30.88
18Detectable warn SPL (X4240800)SF192$203.90
19HMA surf rem var DP (X4401198)SY1,350$11.58
20STR refl CR CTRL TRTMT (X4430200)LF4,454$1.93
21Temp shoulders (X4810100)SY3,199$88.23
22Box culvert removal (X5400005)LF71$220.00
23Cur-in-PL pipe LNR 24 (X5430224)LF413$133.10
24SS cleaned 12 (X5537800)LF312$2.20
25SS cleaned 18 (X5538000)LF200$3.85
26Water valves adj SPL (X5619210)EACH5$2,197.75
27Memb WTRPRF sys B STR (X5810103)SY143$148.79
28Inlets TG-1 (X6020082)EACH7$5,703.46
29Inlets TG-1 SPL (X6021065)EACH7$6,033.46
30Inl-MN G-1 4D SPL (X6021824)EACH8$10,268
31Inl-MN G-1 5D SPL (X6021825)EACH5$13,403
32Inl-MN G-1 8D SPL (X6021828)EACH1$32,653
33Man adjust SPL (X6025600)EACH7$4,899.10
34Man adj new T1F CL SP (X6025800)EACH3$5,378.17
35San MH rec new T1F CL (X6026057)EACH4$5,780.59
36Inlets adjust SPL (X6026200)EACH4$1,853.45
37Man reconst SPL (X6028000)EACH1$5,780.59
38Fill exist storm sewr (X6050206)LF165$30.80
39Fill exist culverts (X6050208)CY6.40$792.00
40Fill EX drain struct (X6050212)EACH1$4,290.00
41Conc gutter TA SPL (X6062700)LF90$99.71
42Linear delin panels 4 (X6350204)EACH4$132.00
43Ornamental fence (X6640618)LF80$337.26
44Remove row markers (X6660410)EACH3$511.87
45Traf cont & prot SPL (X7010216)LS1$26,378
46Traf cont-prot BLR 21 (X7011800)LS1$4,290.00
47GDRL agg eros cont (Z0001002)TON32$101.46
48BLDG remov no 1 (Z0007601)LS1$18,732
49Construction layout (Z0013798)LS1$47,154
50R&D friabl asb BLD 1 (Z0049801)LS1$9,542.50
51R&D non-FR asb BLD 1 (Z0049901)LS1$12,430
52Rock fill (Z0054500)TON151$88.00
53SS 1 wat MN 15 (Z0056650)LF59$220.00
54SS 1 wat MN 18 (Z0056652)LF179$225.50
55SS 2 wat MN 15 (Z0056669)LF185$242.00
56SS 2 wat MN 18 (Z0056670)LF123$297.00
57SS 2 wat MN 24 (Z0056672)LF719$346.50
58Temp pavement (Z0062456)SY1,914$103.15
59Temp support system (Z0073400)EACH1$17,600
60Trainees (Z0076600)HR2,000$0.80
61Trainees TPG (Z0076604)HR2,000$15.00
62Tree remov 6-15 (20100110)UNIT38$38.50
63Tree remov over 15 (20100210)UNIT257$33.00
64Tree remov acres (20100500)ACRE0.50$44,000
65Nitrogen fert nutr (20101400)LB600$8.25
66Phosphorus fert nutr (20101500)LB600$8.25
67Potassium fert nutr (20101600)LB600$8.25
68Earth excavation (20200100)CY8,040$51.59
69Furnished excavation (20400800)CY1,730$33.77
70Porous gran embank (20700220)CY148$159.50
71Trench backfill (20800150)CY645$57.20
72Geotech fab F/GR stab (21001000)SY143$4.40
73Topsoil F & P 4 (21101615)SY14,475$13.15
74Seeding CL 1 (25000100)ACRE5.25$3,135.00
75Seeding CL 3 (25000300)ACRE1$4,235.00
76Mowing (25000750)ACRE3.75$781.59
77Mulch method 2 (25100115)ACRE5.25$2,750.00
78HD eros contr blanket (25100635)SY5,057$5.23
79Sodding salt tolerant (25200110)SY3,367$20.63
80Supple watering (25200200)UNIT14.70$192.50
81Temp eros contr seed (28000250)LB10$17.60
82Temp ditch checks (28000305)LF570$23.06
83Agg ditch checks (28000315)TON24$240.35
84Perimeter eros bar (28000400)LF3,477$9.82
85Inlet & pipe protect (28000500)EACH61$410.89
86Temp eros contr blank (28001100)SY220$7.78
87Stone riprap CL A5 (28100209)TON261$105.26
88Stone riprap CL B3 (28100225)TON90$387.67
89Agg subgrade improve (30300001)CY847$149.05
90Agg subgrade impr 12 (30300112)SY11,061$42.41
91Sub gran mat A 4 (31100300)SY667$34.28
92Sub gran mat A 6 (31100500)SY237$46.08
93Sub gran mat B 4 (31101200)SY4,068$25.71
94HMA base cse 8 1/4 (35501317)SY3,613$78.16
95HMA base cse 9 3/4 (35501323)SY4,686$78.74
96HMA base cse 11 (35501328)SY6,032$88.85
97HMA BC wid 8 1/4 (35600709)SY27$150.90
98HMA BC wid 11 (35600720)SY122$136.95
99Agg surf cse A 6 (40200500)SY72$153.02
100Agg surf cse A 8 (40200700)SY345$69.69
101Aggregate-temp access (40201000)TON752$140.82
102P bit matls tack CT (40600295)LB41,714$2.27
103Matl transfer device (40600405)TON7,953$8.83
104HMA surf rem butt JT (40600982)SY7,132$13.27
105Temporary ramp (40600990)SY404$25.37
106HMA BC IL-9.5 N50 (40602978)TON60$248.60
107HMA BC IL-19.0 N50 (40603080)TON1,341$178.46
108P HMA BC IL-4.75 N50 (40603200)TON1,227$187.97
109P HMA SC IL-9.5 E N50 (40604170)TON3,384$183.16
110Incidental HMA surf (40800050)TON274$373.61
111PCC PVT 7 jointed (42000201)SY581$111.03
112PCC driveway pavt 6 (42300200)SY147$164.61
113PCC driveway pavt 7 (42300300)SY2,140$124.74
114PC conc sidewalk 4 (42400100)SF17,098$13.73
115PC conc sidewalk 6 (42400300)SF480$16.43
116Pavement rem (44000100)SY6,963$23.07
117HMA surf rem 1 1/4 (44000154)SY8,638$6.46
118HMA surf rem 2 (44000157)SY5,062$8.90
119Drive pavement rem (44000200)SY3,960$18.24
120Curb rem (44000300)LF464$11.03
121Gutter rem (44000400)LF90$26.45
122Comb curb gutter rem (44000500)LF3,904$11.04
123Sidewalk rem (44000600)SF5,951$4.01
124Paved SHLD removal (44004250)SY1,108$41.98
125CL D patch T2 12 (44201789)SY11$290.60
126CL D patch T4 12 (44201796)SY101$284.13
127CL D patch T1 15 (44201823)SY6$375.78
128CL D patch T2 15 (44201827)SY297$309.97
129CL D patch T3 15 (44201831)SY172$310.38
130CL D patch T4 15 (44201833)SY1,711$309.68
131Aggregate SHLDS B (48101200)TON553$66.11
132HMA shoulders 8 (48203029)SY4,255$72.84
133Rem exist struct (50100100)EACH1$23,980
134Conc rem (50102400)CY1.70$3,300.00
135Conc headwall removal (50104400)EACH1$429.00
136Pipe culvert remov (50105220)LF1,251$49.50
137Structure excavation (50200100)CY670$63.80
138Rem/disp uns matl-STR (50200450)CY98$60.50
139Conc struct (50300225)CY281$1,210.00
140Reinforcement bars (50800105)LB24$28.60
141Reinf bars, epoxy CTD (50800205)LB37,397$2.75
142Bar splicers (50800515)EACH46$55.00
143Pipe handrail (50901760)LF711$229.63
144Name plates (51500100)EACH1$1,045.00
145Temp soil reten systm (52200020)SF50$660.00
146Expan bolts 3/4 (54002020)EACH8$132.00
147Conc box cul (54003000)CY103.20$2,200.00
148PCBC 5X4 (54010504)LF17$2,266.00
149P cul CL A 1 eqrs 18 (542A5473)LF55$187.00
150P cul CL A 1 eqrs 27 (542A5482)LF110$352.00
151P cul CL D 1 18 (542D0223)LF92$159.50
152P cul CL D 1 eqrs 18 (542D5473)LF560$165.00
153PRC FL end S EQ RS 18 (54214503)EACH2$2,970.00
154PRCF end S EL eqrs 27 (54214722)EACH4$5,610.00
155Concrete collar (54248510)CY3$5,280.00
156Metal FL end sec 18" (54262718)EACH4$1,760.00
157Metal FL end sec 24" (54262724)EACH2$2,090.00
158Metal FL ES EQ RS 18" (54262818)EACH18$1,980.00
159Storm sew CL A 1 15 (550A0070)LF97$132.00
160Storm sew CL A 1 18 (550A0090)LF246$137.50
161Storm sew CL A 2 15 (550A0360)LF179$159.50
162Storm sew CL A 2 18 (550A0380)LF831$170.50
163Storm sew CL A 2 24 (550A0410)LF206$176.00
164Storm sewer rem 12 (55100500)LF141$110.00
165Storm sewer rem 15 (55100700)LF99$121.00
166Geocomposite wall DR (59100100)SY143$37.40
167Man TA 5 dia T1F OL (60221000)EACH3$10,560
168Man TA 5 dia T1F CL (60221100)EACH1$10,560
169Inlets TA T1F CL (60235300)EACH3$2,970.00
170Inlets TA T8G (60236200)EACH5$2,860.00
171Man adjust (60255500)EACH5$1,650.00
172Man reconst (60257900)EACH8$2,200.00
173Remov manholes (60500040)EACH7$3,080.00
174Remov inlets (60500060)EACH7$2,310.00
175Class SI conc outlet (60600095)CY7.50$1,910.88
176Comb CC&G TY B-6.24 (60605000)LF6,067$70.97
177Comb CC&G TB6.24 VWGF (60605500)LF587$175.23
178Pipe culv cleaned 6 (60920006)LF64$18.70
179Pipe culv cleaned 12 (60920012)LF36$33.00
180Fur erect row markers (66600105)EACH16$369.69
181Non SPL waste disposl (66900200)CY285$137.03
182Soil disposal analy (66900530)EACH3$1,485.00
183Reg sub P-const plan (66901001)LS1$2,420.00
184Reg sub F con report (66901003)LS1$2,420.00
185Reg sub mon (66901006)CAL DAY17$1,188.00
186Engr field office A (67000400)CAL MO19$3,345.91
187Mobilization (67100100)LS1$310,495
188Traf cont-prot 701321 (70100405)EACH2$16,478
189Traf cont-prot 701201 (70100450)LS1$10,175
190Traf cont-prot 701206 (70100455)LS1$0.01
191Traf cont-prot 701306 (70100460)LS1$0.01
192Traf cont-prot 701326 (70100500)LS1$4,290.00
193Traf cont-prot 701336 (70100600)LS1$0.01
194TR cont & prot 701501 (70102620)LS1$11,000
195TR cont & prot 701502 (70102622)LS1$3,960.00
196TR cont & prot 701701 (70102635)LS1$3,190.00
197TR cont & prot 701801 (70102640)LS1$357.50
198TR cont surveillance (70103815)CAL DAY5$1,551.00
199Temp BR traf signals (70106500)EACH2$35,200
200Temp rumble strips (70106700)EACH9$1,485.00
201Pavt MK blkout tape 6 (70107006)LF684$3.14
202Changeable message SN (70107025)CAL DAY14$137.50
203Short term pavt mking (70300100)LF3,478$2.36
204SHRT TRM pavt MK rem (70300150)SF1,898$3.45
205Temp PVT MK line 4 - paint (70300221)LF68,858$0.01
206Temp PVT MK line 6 - paint (70300241)LF13,820$0.01
207Temp PVT MK line 8 - paint (70300251)LF109$0.01
208Temp PVT MK line 12 - paint (70300261)LF307$0.01
209Temp PVT MK line 24 - paint (70300281)LF627$0.01
210Temp PVT MK L4 T4 tape (70307120)LF2,217$1.65
211Temp conc barrier (70400100)LF775$55.00
212Pin temp conc barrier (70400125)EACH60$33.00
213Rel temp conc barrier (70400200)LF650$16.50
214Temp SPBGR TY A (70500100)LF150$70.18
215Temp TR bar term T1 (70500615)EACH2$7,716.50
216Imp attn temp NRD TL3 (70600250)EACH4$4,345.00
217Imp attn rel NRD TL3 (70600350)EACH4$495.00
218Sign panel T1 (72000100)SF59$39.60
219Terminal marker - DA (72501000)EACH2$55.00
220Teles STL sin support (72800100)LF203.50$30.80
221Mod ureth PM LTR-sym (78009000)SF997$4.95
222Mod ureth PM line 4 (78009004)LF17,595$0.83
223Mod ureth PM line 6 (78009006)LF13,820$1.10
224Mod ureth PM line 8 (78009008)LF109$1.65
225Mod ureth PM line 12 (78009012)LF307$2.48
226Mod ureth PM line 24 (78009024)LF627$2.75
227GRV RCSD PM LTR & sym (78011000)SF910$1.76
228GRV RCSD PVT MRKG 5 (78011025)LF17,595$0.61
229GRV RCSD PVT MRKG 7 (78011035)LF13,820$0.72
230GRV RCSD PVT MRKG 9 (78011045)LF109$1.10
231GRV RCSD PVT MRKG 13 (78011065)LF307$2.20
232GRV RCSD PVT MRKG 25 (78011125)LF627$3.30
233Raised refl pavt MKR (78100100)EACH329$119.93
234Raised ref PVT MK rem (78300200)EACH177$16.81
235PVT MKG rem grinding (78300201)SF2,748$4.40
IDOT contract 68A65: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy