IDOT contract 46940 bid tabulation
Section GLP. Let by Illinois DOT on April 25, 2025, Grundy, District 03. 3 bids received; low bid $1,889,874 by D. Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 95
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | D. Construction, Inc. | $1,889,874 | Low |
| 2 | Austin Tyler Construction, Inc. | $1,987,187 | +5.0% |
| 3 | P. T. Ferro Construction Co. | $2,258,305 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. D. Construction, Inc. | 2. Austin Tyler Construction, Inc. | 3. P. T. Ferro Construction Co. |
|---|---|---|---|---|---|---|
| 1 | Remov EX gate (X0300249) | EACH | 5 | $914.10 | $900.00 | $1,000.00 |
| 2 | Rem EX parking blocks (X0301339) | EACH | 93 | $50.00 | $110.00 | $45.00 |
| 3 | Prec conc park block (X0301430) | EACH | 109 | $125.00 | $120.00 | $120.00 |
| 4 | Tubular steel gate (X0323013) | EACH | 7 | $18,965 | $17,250 | $19,000 |
| 5 | Rem & rel flagpole (X0323256) | EACH | 1 | $2,500.00 | $3,000.00 | $5,000.00 |
| 6 | Traffic counter (X0323388) | EACH | 1 | $0.01 | $33,100 | $40,000 |
| 7 | Rem EX wood bollard (X0324056) | EACH | 7 | $100.00 | $200.00 | $150.00 |
| 8 | Park lot seal CT (X0325800) | SY | 11,259 | $2.75 | $1.75 | $2.00 |
| 9 | Clearing & grubbing (X2010512) | SY | 113 | $42.90 | $39.00 | $50.00 |
| 10 | Furn & plce sand fill (X2090213) | CY | 15 | $100.00 | $140.00 | $130.00 |
| 11 | Explor trench SPL (X2130010) | LF | 188 | $0.01 | $0.01 | $45.00 |
| 12 | Seeding CL 4A mod (X2502014) | ACRE | 1.75 | $4,400.00 | $1,500.00 | $4,000.00 |
| 13 | Rem & salv sign panel (X2600007) | EACH | 4 | $500.00 | $800.00 | $100.00 |
| 14 | HMA surf rem var DP (X4401198) | SY | 357 | $10.00 | $10.00 | $15.00 |
| 15 | Rem conc end sec (X5010523) | EACH | 4 | $350.00 | $500.00 | $500.00 |
| 16 | Traf cont & prot SPL (X7010216) | LS | 1 | $101,800 | $10,000 | $55,555 |
| 17 | Rem RE-erect EX sign (X7240600) | EACH | 2 | $500.00 | $1,400.00 | $1,000.00 |
| 18 | LT P 25FMH 4FTARM SPL (X8302393) | EACH | 8 | $3,575.00 | $5,150.00 | $5,150.00 |
| 19 | LT P A 25MH 4FT TW SPL (X8302395) | EACH | 1 | $3,925.00 | $5,250.00 | $5,250.00 |
| 20 | Construction layout (Z0013798) | LS | 1 | $20,000 | $52,000 | $65,000 |
| 21 | Earth excavation (20200100) | CY | 6,375 | $20.00 | $18.00 | $40.00 |
| 22 | Trench backfill (20800150) | CY | 60 | $60.00 | $70.00 | $100.00 |
| 23 | Geotech fab F/GR stab (21001000) | SY | 7,242 | $3.00 | $2.25 | $2.20 |
| 24 | Topsoil F & P 8 (21101630) | SY | 20,584 | $5.50 | $7.00 | $8.00 |
| 25 | Grading & shap ditch (21400100) | LF | 3,888 | $12.00 | $9.00 | $8.00 |
| 26 | Seeding CL 1 (25000100) | ACRE | 1.50 | $2,200.00 | $2,000.00 | $2,000.00 |
| 27 | Seeding CL 1B (25000115) | ACRE | 1.25 | $2,200.00 | $2,000.00 | $2,000.00 |
| 28 | Nitrogen fert nutr (25000400) | LB | 410 | $2.20 | $4.00 | $2.00 |
| 29 | Phosphorus fert nutr (25000500) | LB | 410 | $2.20 | $4.00 | $2.00 |
| 30 | Potassium fert nutr (25000600) | LB | 410 | $2.20 | $4.00 | $2.00 |
| 31 | Mulch method 2 (25100115) | ACRE | 3 | $2,035.00 | $3,000.00 | $1,850.00 |
| 32 | Erosion contr blanket (25100630) | SY | 4,926 | $1.49 | $2.00 | $1.35 |
| 33 | HD eros contr blanket (25100635) | SY | 1,748 | $1.93 | $3.00 | $1.75 |
| 34 | Temp ditch checks (28000305) | LF | 382 | $11.00 | $20.00 | $10.00 |
| 35 | Perimeter eros bar (28000400) | LF | 2,107 | $3.30 | $4.00 | $3.00 |
| 36 | Inlet & pipe protect (28000500) | EACH | 17 | $220.00 | $0.01 | $200.00 |
| 37 | Agg base cse B (35101500) | CY | 2,181 | $50.00 | $65.00 | $60.00 |
| 38 | Agg base cse B 4 (35101600) | SY | 723 | $8.00 | $20.00 | $12.00 |
| 39 | Preparation of base (35800100) | SY | 12,855 | $2.00 | $2.00 | $1.50 |
| 40 | Agg base repair (35800200) | TON | 122 | $30.00 | $60.00 | $25.00 |
| 41 | Agg surf cse B (40200900) | CY | 15 | $65.00 | $80.00 | $95.00 |
| 42 | Bit matls PR CT (40600275) | LB | 58,202 | $0.01 | $0.01 | $0.01 |
| 43 | Bit matls tack CT (40600290) | LB | 3,336 | $0.01 | $0.01 | $0.01 |
| 44 | HMA surf rem butt JT (40600982) | SY | 595 | $0.01 | $0.01 | $0.01 |
| 45 | HMA BC IL-19.0 N50 (40603080) | TON | 1,218 | $75.00 | $95.00 | $90.00 |
| 46 | HMA SC IL-9.5 C N50 (40604050) | TON | 2,228 | $78.00 | $100.00 | $95.00 |
| 47 | HMA pavt FD 6 (40701801) | SY | 3,977 | $26.00 | $34.00 | $35.00 |
| 48 | PC conc sidewalk 4 (42400100) | SF | 6,506 | $8.50 | $6.50 | $10.00 |
| 49 | Detectable warnings (42400800) | SF | 131 | $35.00 | $20.00 | $26.00 |
| 50 | Pavement rem (44000100) | SY | 14,081 | $7.00 | $4.25 | $6.00 |
| 51 | HMA surf rem 2 (44000157) | SY | 12,232 | $2.50 | $2.50 | $4.00 |
| 52 | HMA surf rem 2 1/2 (44000159) | SY | 5,805 | $3.50 | $3.00 | $5.00 |
| 53 | Comb curb gutter rem (44000500) | LF | 1,582 | $10.00 | $6.00 | $15.00 |
| 54 | Sidewalk rem (44000600) | SF | 1,581 | $3.50 | $2.50 | $4.00 |
| 55 | Crack filling (45100200) | LB | 3,403 | $1.93 | $2.15 | $2.15 |
| 56 | Agg wedge SHLD type B (48102100) | TON | 93 | $50.00 | $70.00 | $65.00 |
| 57 | Conc rem (50102400) | CY | 15 | $500.00 | $90.00 | $125.00 |
| 58 | Conc headwall removal (50104400) | EACH | 6 | $350.00 | $250.00 | $500.00 |
| 59 | Pipe culvert remov (50105220) | LF | 455 | $20.00 | $25.00 | $20.00 |
| 60 | P cul CL A 1 12 (542A0217) | LF | 145 | $75.00 | $75.00 | $75.00 |
| 61 | P cul CL A 1 15 (542A0220) | LF | 129 | $85.00 | $79.00 | $90.00 |
| 62 | P cul CL A 1 eqrs 24 (542A5479) | LF | 249 | $145.00 | $140.00 | $110.00 |
| 63 | PRC flar end sec 12 (54213657) | EACH | 6 | $1,000.00 | $1,700.00 | $1,200.00 |
| 64 | PRC flar end sec 15 (54213660) | EACH | 4 | $1,200.00 | $1,800.00 | $1,400.00 |
| 65 | PRC flar end sec 24 (54213669) | EACH | 2 | $1,650.00 | $2,400.00 | $1,800.00 |
| 66 | PRC FL end S EQ RS 24 (54214509) | EACH | 8 | $1,550.00 | $2,700.00 | $2,000.00 |
| 67 | Remov inlets (60500060) | EACH | 6 | $500.00 | $500.00 | $500.00 |
| 68 | Class SI conc outlet (60600095) | CY | 5 | $550.00 | $800.00 | $1,500.00 |
| 69 | Comb CC&G TB6.12 (60603800) | LF | 65 | $50.00 | $45.00 | $60.00 |
| 70 | Comb CC&G TM4.12 (60608562) | LF | 1,898 | $27.50 | $26.00 | $35.00 |
| 71 | Pipe culv cleaned 18 (60920018) | LF | 22 | $25.00 | $33.00 | $30.00 |
| 72 | Pipe culv cleaned 24 (60920024) | LF | 47 | $27.50 | $34.00 | $50.00 |
| 73 | Pipe culv cleaned ers 24 (60921024) | LF | 48 | $30.00 | $35.00 | $60.00 |
| 74 | Engr field office A (67000400) | CAL MO | 6 | $4,500.00 | $2,000.00 | $1.00 |
| 75 | Mobilization (67100100) | LS | 1 | $105,000 | $115,000 | $100,000 |
| 76 | Sign panel T1 (72000100) | SF | 31 | $27.50 | $35.00 | $25.00 |
| 77 | Sign panel T2 (72000200) | SF | 12 | $22.00 | $70.00 | $20.00 |
| 78 | Remov sin pan assy TA (72400100) | EACH | 4 | $82.50 | $125.00 | $75.00 |
| 79 | Rem & rel sign panel T1 (72400735) | SF | 8 | $16.50 | $75.00 | $15.00 |
| 80 | Teles STL sin support (72800100) | LF | 72 | $16.50 | $18.00 | $15.00 |
| 81 | Wood sin support (73000100) | LF | 84 | $27.50 | $33.00 | $25.00 |
| 82 | Base tel STL sin supp (73100100) | EACH | 6 | $247.50 | $250.00 | $225.00 |
| 83 | Mod ureth PM LTR-sym (78009000) | SF | 526 | $12.76 | $7.45 | $11.60 |
| 84 | Mod ureth PM line 4 (78009004) | LF | 41,272 | $1.49 | $1.25 | $1.35 |
| 85 | Mod ureth PM line 6 (78009006) | LF | 104 | $4.62 | $1.87 | $4.20 |
| 86 | Mod ureth PM line 12 (78009012) | LF | 96 | $10.34 | $3.73 | $9.40 |
| 87 | Mod ureth PM line 24 (78009024) | LF | 84 | $17.60 | $7.45 | $16.00 |
| 88 | PVT MKG rem WTR blast (78300202) | SF | 25 | $110.00 | $100.00 | $100.00 |
| 89 | Undrgrd C CNC 2 (81028750) | LF | 200 | $18.00 | $20.00 | $20.00 |
| 90 | UD 2#8 #8G xlpuse 3/4 (81603000) | LF | 950 | $10.30 | $25.00 | $25.00 |
| 91 | Lum LED rdwy F (82110006) | EACH | 10 | $6.65 | $950.00 | $950.00 |
| 92 | Light pole FDN 24D (83600200) | LF | 45 | $320.00 | $350.00 | $350.00 |
| 93 | Rem LT U no salv (84200600) | EACH | 7 | $300.00 | $1,000.00 | $1,000.00 |
| 94 | Rem pole FDN (84200804) | EACH | 7 | $600.00 | $750.00 | $750.00 |
| 95 | Reloc EX TS equip (89501250) | EACH | 1 | $100.00 | $5,280.00 | $5,280.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.