IDOT contract 66M48 bid tabulation
Section 122V-BR1. Let by Illinois DOT on April 25, 2025, Bureau, District 03. 3 bids received; low bid $1,939,442 by D. Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 85
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | D. Construction, Inc. | $1,939,442 | Low |
| 2 | Civil Constructors, Inc. d/b/a/ Helm Civil | $2,725,904 | +41% |
| 3 | Brandt Construction Co. | $2,800,000 | +44% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. D. Construction, Inc. | 2. Civil Constructors, Inc. d/b/a/ Helm Civil | 3. Brandt Construction Co. |
|---|---|---|---|---|---|---|
| 1 | Conc wearing surf 5 (X5030305) | SY | 227 | $138.00 | $510.00 | $110.00 |
| 2 | Prec bridge app slab (X5040100) | SF | 1,930 | $78.00 | $110.00 | $90.50 |
| 3 | Bar terminators (X5080530) | EACH | 116 | $40.00 | $31.70 | $45.00 |
| 4 | Slope wall repair (X5110310) | SY | 39 | $200.00 | $663.00 | $415.00 |
| 5 | Drainage scuppr DS-11 (X5230174) | EACH | 4 | $2,500.00 | $3,070.00 | $2,665.00 |
| 6 | Linear delin panels 4 (X6350204) | EACH | 16 | $25.83 | $119.75 | $118.00 |
| 7 | Linear delin panels 6 (X6350206) | EACH | 8 | $60.06 | $200.00 | $330.00 |
| 8 | Traf cont & prot SPL (X7010216) | LS | 1 | $0.01 | $7,500.00 | $8,500.00 |
| 9 | Temp info signing (X7200061) | SF | 84 | $25.00 | $25.00 | $28.00 |
| 10 | Detour signing (X7200203) | LS | 1 | $42,500 | $32,800 | $37,100 |
| 11 | Jack & rem EX bearing (Z0001899) | EACH | 10 | $8,000.00 | $2,510.00 | $2,150.00 |
| 12 | STR rep con DP = < 5 (Z0012754) | SF | 57 | $160.00 | $376.00 | $410.00 |
| 13 | Construction layout (Z0013798) | LS | 1 | $10,000 | $37,300 | $10,500 |
| 14 | RR prot liability ins (Z0048665) | LS | 1 | $12,802 | $15,000 | $40,000 |
| 15 | Tree remov 6-15 (20100110) | UNIT | 17 | $440.00 | $67.00 | $100.00 |
| 16 | Tree trunk protection (20101100) | EACH | 9 | $220.00 | $600.00 | $375.00 |
| 17 | Earth excavation (20200100) | CY | 15 | $100.00 | $150.00 | $180.00 |
| 18 | Furnished excavation (20400800) | CY | 1,095 | $35.00 | $43.50 | $45.00 |
| 19 | Topsoil exc & plac (21101505) | CY | 152 | $25.00 | $46.00 | $30.00 |
| 20 | Seeding CL 2A (25000210) | ACRE | 0.50 | $9,900.00 | $9,000.00 | $10,100 |
| 21 | Nitrogen fert nutr (25000400) | LB | 44 | $3.30 | $3.00 | $8.00 |
| 22 | Phosphorus fert nutr (25000500) | LB | 44 | $3.30 | $3.00 | $8.00 |
| 23 | Potassium fert nutr (25000600) | LB | 44 | $3.30 | $3.00 | $8.00 |
| 24 | Erosion contr blanket (25100630) | SY | 2,163 | $2.20 | $2.00 | $2.00 |
| 25 | Perimeter eros bar (28000400) | LF | 1,579 | $3.30 | $3.00 | $4.50 |
| 26 | Inlet & pipe protect (28000500) | EACH | 9 | $220.00 | $200.00 | $350.00 |
| 27 | Stone dump rip CL A3 (28100705) | SY | 52 | $90.00 | $45.00 | $70.00 |
| 28 | Filter fabric (28200200) | SY | 52 | $10.00 | $6.00 | $25.00 |
| 29 | Agg base cse B 8 (35102000) | SY | 407 | $20.00 | $20.00 | $23.00 |
| 30 | Bit matls tack CT (40600290) | LB | 815 | $0.01 | $2.00 | $3.50 |
| 31 | Long joint sealant (40600370) | LF | 381 | $27.38 | $26.00 | $28.00 |
| 32 | HMA BC IL-19.0 N50 (40603080) | TON | 57 | $140.00 | $175.00 | $180.00 |
| 33 | HMA SC IL-9.5 C N50 (40604050) | TON | 309 | $140.00 | $175.00 | $180.00 |
| 34 | Welded wire reinf (42000060) | SY | 225 | $30.00 | $22.60 | $30.00 |
| 35 | PVT con PCC BR app SL (42000080) | SY | 221 | $250.00 | $270.00 | $300.00 |
| 36 | HMA surf rem 1 1/2 (44000155) | SY | 1,403 | $8.00 | $15.00 | $5.50 |
| 37 | Drive pavement rem (44000200) | SY | 118 | $12.00 | $15.00 | $25.00 |
| 38 | Conc rem (50102400) | CY | 39.20 | $2,250.00 | $1,850.00 | $2,138.70 |
| 39 | Slope wall remov (50104650) | SY | 4 | $500.00 | $408.00 | $1,100.00 |
| 40 | Rem EX conc deck N1 (50104701) | EACH | 1 | $140,000 | $350,000 | $325,000 |
| 41 | Pipe culvert remov (50105220) | LF | 32 | $20.00 | $25.00 | $45.00 |
| 42 | Protective shield (50157300) | SY | 336 | $80.00 | $128.00 | $328.24 |
| 43 | Structure excavation (50200100) | CY | 227 | $40.00 | $62.90 | $75.00 |
| 44 | Conc struct (50300225) | CY | 46.90 | $1,100.00 | $1,400.00 | $2,400.00 |
| 45 | Conc sup-STR (50300255) | CY | 329.40 | $1,400.00 | $1,590.00 | $2,580.00 |
| 46 | BR deck grooving (50300260) | SY | 980 | $7.95 | $11.20 | $10.00 |
| 47 | Protective coat (50300300) | SY | 1,301 | $1.00 | $3.22 | $5.50 |
| 48 | Stud shear connectors (50500505) | EACH | 555 | $6.00 | $15.80 | $7.00 |
| 49 | Reinf bars, epoxy CTD (50800205) | LB | 97,200 | $2.25 | $2.85 | $1.90 |
| 50 | Name plates (51500100) | EACH | 1 | $1,000.00 | $1,060.00 | $1,000.00 |
| 51 | Pref JT strip seal (52000110) | LF | 92.50 | $225.00 | $470.00 | $385.00 |
| 52 | Elast bearing assy T1 (52100010) | EACH | 10 | $2,500.00 | $3,500.00 | $2,400.00 |
| 53 | Anchor bolts 1 (52100520) | EACH | 40 | $100.00 | $160.00 | $65.00 |
| 54 | P cul CL D 2 15 (542D1060) | LF | 89 | $100.00 | $49.00 | $90.00 |
| 55 | Metal FL end sec 15" (54262715) | EACH | 2 | $500.00 | $350.00 | $625.00 |
| 56 | Granular backfill STR (58600101) | CY | 179 | $60.00 | $150.00 | $130.00 |
| 57 | Geocomposite wall DR (59100100) | SY | 93 | $35.00 | $66.00 | $32.00 |
| 58 | Conc HDWL for P drain (60100060) | EACH | 4 | $500.00 | $560.00 | $435.00 |
| 59 | P undr for struct 4 (60146304) | LF | 193 | $25.00 | $47.00 | $32.00 |
| 60 | Remov inlets (60500060) | EACH | 2 | $400.00 | $375.00 | $800.00 |
| 61 | Paved flume (60617800) | LF | 10 | $100.00 | $300.00 | $385.00 |
| 62 | SPBGR TY A 6FT posts (63000001) | LF | 362.50 | $31.53 | $40.80 | $34.00 |
| 63 | Traf bar term T6 (63100085) | EACH | 4 | $3,643.20 | $5,595.00 | $3,150.00 |
| 64 | TR bar TRM T1 SPL tan (63100167) | EACH | 3 | $3,131.70 | $4,375.00 | $3,050.00 |
| 65 | Guardrail remov (63200310) | LF | 537.50 | $7.57 | $13.05 | $11.00 |
| 66 | Perm surv MKRS T1 (66700205) | EACH | 3 | $1,000.00 | $310.00 | $685.00 |
| 67 | Non SPL waste disposl (66900200) | CY | 326 | $90.00 | $105.00 | $142.00 |
| 68 | Soil disposal analy (66900530) | EACH | 3 | $1,925.00 | $1,750.00 | $1,975.00 |
| 69 | Reg sub P-const plan (66901001) | LS | 1 | $2,475.00 | $2,700.00 | $3,050.00 |
| 70 | Reg sub F con report (66901003) | LS | 1 | $2,475.00 | $2,500.00 | $2,800.00 |
| 71 | Reg sub mon (66901006) | CAL DAY | 4 | $1,045.00 | $2,000.00 | $2,250.00 |
| 72 | Engr field office A (67000400) | CAL MO | 10 | $4,000.00 | $3,700.00 | $4,038.89 |
| 73 | Mobilization (67100100) | LS | 1 | $116,300 | $262,106 | $162,114 |
| 74 | Sign panel T1 (72000100) | SF | 28 | $27.50 | $62.00 | $31.61 |
| 75 | Sign panel T2 (72000200) | SF | 10 | $36.30 | $80.00 | $56.44 |
| 76 | Remov sin pan assy TA (72400100) | EACH | 4 | $82.50 | $1,000.00 | $197.54 |
| 77 | Remov sin pan assy TB (72400200) | EACH | 1 | $110.00 | $1,000.00 | $225.76 |
| 78 | Terminal marker - DA (72501000) | EACH | 3 | $38.50 | $50.00 | $56.44 |
| 79 | Metal post TY A (72900100) | LF | 11 | $16.50 | $50.00 | $45.15 |
| 80 | Wood sin support (73000100) | LF | 56 | $33.00 | $100.00 | $73.37 |
| 81 | Mod ureth PM line 4 (78009004) | LF | 5,920 | $1.93 | $2.07 | $2.31 |
| 82 | Raised refl pavt MKR (78100100) | EACH | 6 | $825.00 | $1,656.90 | $852.26 |
| 83 | Grdrail ref type A (78200005) | EACH | 16 | $13.20 | $10.00 | $11.29 |
| 84 | Barr wall ref type B (78200010) | EACH | 8 | $25.00 | $13.62 | $62.19 |
| 85 | Raised ref PVT MK rem (78300200) | EACH | 6 | $20.00 | $30.30 | $67.94 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.