IDOT contract 78833 bid tabulation

Section 105B-3. Let by Illinois DOT on April 25, 2025, White, District 09. 2 bids received; low bid $1,609,107 by E. T. Simonds Construction Company.

Owner
Illinois DOT
Letting
25 APR 2025
Pay items
90
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1E. T. Simonds Construction Company$1,609,107Low
2Samron Midwest Contracting, Inc.$1,640,810+2.0%
IDOT contract 78833: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. E. T. Simonds Construction Company2. Samron Midwest Contracting, Inc.
1Box culvert removal (X1200050)LF20$225.38$15.00
2Prec box culv end sec (X5040140)EACH2$8,344.87$6,500.00
3Bar terminators (X5080530)EACH566$35.36$27.00
4Construction layout (Z0013798)LS1$37,870$15,000
5Trainees (Z0076600)HR1,000$0.80$0.80
6Trainees TPG (Z0076604)HR1,000$15.00$15.00
7Earth excavation (20200100)CY475$40.24$46.00
8Channel excavation (20300100)CY140$106.97$31.00
9Porous gran embank (20700220)CY50$89.80$62.00
10Seeding CL 2 (25000200)ACRE0.50$8,250.00$12,000
11Seeding CL 7 (25000350)ACRE0.50$220.00$2,000.00
12Nitrogen fert nutr (25000400)LB45$3.30$2.00
13Phosphorus fert nutr (25000500)LB45$3.30$2.00
14Potassium fert nutr (25000600)LB45$3.30$2.00
15Agr ground limestone (25000700)TON1$220.00$380.00
16Mulch method 2 (25100115)ACRE1$385.00$3,200.00
17Erosion contr blanket (25100630)SY2,148$3.12$2.00
18Temp eros contr seed (28000250)LB100$6.76$2.00
19Temp ditch checks (28000305)LF63$26.76$18.00
20Perimeter eros bar (28000400)LF605$6.50$6.00
21Inlet & pipe protect (28000500)EACH1$255.63$170.00
22Stone riprap CL A5 (28100109)SY592$78.92$95.00
23Filter fabric (28200200)SY592$3.76$4.50
24Agg base cse B 8 (35102000)SY45$33.65$15.00
25Agg base cse B 10 (35102200)SY205$32.12$27.00
26Bit matls tack CT (40600290)LB785$0.01$2.00
27HMA surf rem butt JT (40600982)SY370$25.78$32.00
28Temporary ramp (40600990)SY58$84.91$32.00
29HMA SC IL-9.5 C N70 (40604052)TON45$295.85$467.00
30Incidental HMA surf (40800050)TON5$790.31$300.00
31Welded wire reinf (42000060)SY110$19.13$10.00
32PVT con PCC BR app SL (42000080)SY110$307.62$260.00
33Protective coat (42001300)SY437$1.53$0.01
34Pavement rem (44000100)SY335$40.89$20.00
35Paved SHLD removal (44004250)SY30$60.80$15.00
36Tie bars 3/4 (44213204)EACH8$27.22$112.00
37HMA shoulders (48203100)TON68$204.55$340.00
38PCC shoulders 10 (48300500)SY327$147.92$118.00
39Rem exist struct (50100100)EACH1$60,340$60,000
40Structure excavation (50200100)CY250$37.75$30.00
41Conc struct (50300225)CY65$1,172.94$805.00
42Conc sup-STR (50300255)CY120.80$1,427.17$1,640.00
43BR deck grooving (50300260)SY540$15.37$20.00
44Protective coat (50300300)SY570$1.30$2.00
45Conc supstr app slab (50301350)CY95$586.82$650.00
46F & E struct steel (50500105)LS1$211,157$230,000
47Stud shear connectors (50500505)EACH1,314$5.12$9.00
48Reinf bars, epoxy CTD (50800205)LB69,080$1.60$1.60
49Bar splicers (50800515)EACH534$53.12$41.00
50Fur STL pile HP12X63 (51201610)LF555$123.06$100.00
51Driving piles (51202305)LF555$0.01$0.01
52Test pile ST HP12X63 (51203610)EACH2$8,238.91$10,000
53Pile shoes (51204650)EACH12$137.50$160.00
54Name plates (51500100)EACH1$841.98$500.00
55Anchor bolts 1 (52100520)EACH24$119.75$160.00
56Temp soil reten systm (52200020)SF338$154.11$350.00
57PCBC 3X3 (54010303)LF36$604.76$600.00
58Granular backfill STR (58600101)CY115$107.10$96.00
59Geocomposite wall DR (59100100)SY62$35.61$13.00
60Conc HDWL for P drain (60100060)EACH4$204.81$250.00
61P undr for struct 4 (60146304)LF154$19.64$31.00
62SPBGR TY A 6FT posts (63000001)LF225$38.50$55.00
63Traf bar term T6 (63100085)EACH4$5,500.00$5,500.00
64TR bar TRM T1 SPL tan (63100167)EACH4$4,510.00$4,500.00
65Guardrail remov (63200310)LF456$8.54$8.00
66Fur erect row markers (66600105)EACH8$209.00$400.00
67Engr field office A (67000400)CAL MO8$2,000.00$2,000.00
68Mobilization (67100100)LS1$105,234$100,000
69Traf cont-prot 701321 (70100405)EACH1$21,111$18,150
70Traf cont-prot 701201 (70100450)LS1$12,840$10,000
71Traf cont-prot 701326 (70100500)LS1$8,024.93$1,500.00
72TR cont surveillance (70103815)CAL DAY6$0.01$0.01
73Temp BR traf signals (70106500)EACH1$37,730$35,000
74Temp rumble strips (70106700)EACH6$1,039.50$1,200.00
75Changeable message SN (70107025)CAL DAY28$66.35$103.00
76Short term pavt mking (70300100)LF92$2.31$1.00
77SHRT TRM pavt MK rem (70300150)SF32$4.44$0.01
78Temp PVT MK line 4 - paint (70300221)LF920$0.01$0.01
79Temp conc barrier (70400100)LF387.50$29.65$38.00
80Pin temp conc barrier (70400125)EACH59$37.70$33.00
81Rel temp conc barrier (70400200)LF387.50$4.61$5.00
82Imp attn temp FRN TL3 (70600260)EACH2$9,142.83$11,000
83Imp attn rel FRN TL3 (70600332)EACH2$3,976.11$1,300.00
84Terminal marker - DA (72501000)EACH4$55.00$50.00
85Mod ureth PM line 4 (78009004)LF920$17.93$20.00
86Grdrail ref type A (78200005)EACH10$11.00$13.00
87Barr wall ref type B (78200010)EACH8$12.63$13.00
88Raised ref PVT MK rem (78300200)EACH2$16.14$100.00
89PVT MKG rem grinding (78300201)SF532$11.07$17.00
90Uninter power sup ext (86200300)EACH1$3,080.00$3,000.00
IDOT contract 78833: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy