IDOT contract 76U31 bid tabulation
Section 52RS-3. Let by Illinois DOT on April 25, 2025, St.Clair, District 08. 2 bids received; low bid $9,334,223 by The Kilian Corporation.
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 40
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | The Kilian Corporation | $9,334,223 | Low |
| 2 | Christ Bros. Asphalt, Inc. | $9,464,076 | +1.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. The Kilian Corporation | 2. Christ Bros. Asphalt, Inc. |
|---|---|---|---|---|---|
| 1 | HMA surf rem var DP (X4401198) | SY | 108,717 | $9.50 | $8.42 |
| 2 | Centerln rum strip 8 (X6420112) | LF | 1,690 | $1.30 | $0.75 |
| 3 | Trainees (Z0076600) | HR | 1,500 | $0.80 | $0.80 |
| 4 | Trainees TPG (Z0076604) | HR | 1,500 | $15.00 | $15.00 |
| 5 | Exc & GR EX shoulder (20200600) | UNIT | 722 | $615.00 | $393.50 |
| 6 | Sub gran mat C 5 (31102200) | SY | 32,032 | $13.00 | $19.00 |
| 7 | Bit matls PR CT (40600275) | LB | 12,815 | $1.00 | $2.34 |
| 8 | Bit matls tack CT (40600290) | LB | 126,675 | $0.75 | $2.73 |
| 9 | Long joint sealant (40600370) | LF | 76,845 | $2.50 | $2.57 |
| 10 | Matl transfer device (40600405) | TON | 22,835 | $6.00 | $5.01 |
| 11 | HMA BC IL-19.0 N70 (40603085) | TON | 13,700 | $132.00 | $129.78 |
| 12 | HMA SC IL-9.5 D N70 (40604062) | TON | 9,135 | $130.00 | $134.29 |
| 13 | Protective coat (42001300) | SY | 430 | $5.00 | $1.00 |
| 14 | Gutter rem (44000400) | LF | 2,088 | $17.50 | $25.00 |
| 15 | CL D patch T2 13 (44201803) | SY | 141.80 | $437.00 | $267.34 |
| 16 | CL D patch T3 13 (44201807) | SY | 15.30 | $372.00 | $267.34 |
| 17 | CL D patch T4 13 (44201809) | SY | 42.80 | $346.00 | $267.34 |
| 18 | Agg wedge SHLD type B (48102100) | TON | 3,230 | $41.00 | $77.78 |
| 19 | HMA shoulders 8 (48203029) | SY | 32,032 | $78.00 | $69.98 |
| 20 | Concrete gutter TY B (60602800) | LF | 2,088 | $51.00 | $55.40 |
| 21 | Shoulder rum strip 8 (64200108) | LF | 74,444 | $0.34 | $0.75 |
| 22 | Engr field office A (67000400) | CAL MO | 8 | $3,000.00 | $2,500.00 |
| 23 | Mobilization (67100100) | LS | 1 | $735,650 | $692,818 |
| 24 | Traf cont-prot 701201 (70100450) | LS | 1 | $26,250 | $0.01 |
| 25 | Traf cont-prot 701306 (70100460) | LS | 1 | $138,000 | $297,624 |
| 26 | Traf cont-prot 701336 (70100600) | LS | 1 | $0.01 | $0.01 |
| 27 | Changeable message SN (70107025) | CAL DAY | 430 | $45.00 | $36.75 |
| 28 | Short term pavt mking (70300100) | LF | 9,826 | $4.50 | $2.85 |
| 29 | SHRT TRM pavt MK rem (70300150) | SF | 1,638 | $5.00 | $0.01 |
| 30 | Temp PVT MK LTR & sym paint (70300211) | SF | 62 | $0.01 | $0.01 |
| 31 | Temp PVT MK line 6 - paint (70300241) | LF | 94,944 | $0.01 | $0.01 |
| 32 | Temp PVT MK line 12 - paint (70300261) | LF | 550 | $0.01 | $0.01 |
| 33 | THPL PVT MK LTR & sym (78000100) | SF | 62 | $21.00 | $16.12 |
| 34 | THPL PVT MK line 6 (78000400) | LF | 94,944 | $0.78 | $0.79 |
| 35 | THPL PVT MK line 12 (78000600) | LF | 550 | $7.30 | $7.31 |
| 36 | Paint PVT MK line 6 (78001130) | LF | 3,380 | $0.67 | $3.71 |
| 37 | Raised refl pavt MKR (78100100) | EACH | 521 | $37.25 | $36.25 |
| 38 | Barr wall ref type B (78200010) | EACH | 10 | $15.00 | $100.00 |
| 39 | Raised ref PVT MK rem (78300200) | EACH | 521 | $0.01 | $0.01 |
| 40 | PVT MKG rem WTR blast (78300202) | SF | 48,030 | $0.01 | $0.01 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.