IDOT contract 66A85 bid tabulation
Section (109,110)RS-3. Let by Illinois DOT on April 25, 2025, Kankakee, District 03. 3 bids received; low bid $3,511,811 by Kankakee Valley Construction Company, Inc..
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 67
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Kankakee Valley Construction Company, Inc. | $3,511,811 | Low |
| 2 | Gallagher Asphalt Corporation | $4,026,778 | +15% |
| 3 | P. T. Ferro Construction Co. | $4,243,617 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kankakee Valley Construction Company, Inc. | 2. Gallagher Asphalt Corporation | 3. P. T. Ferro Construction Co. |
|---|---|---|---|---|---|---|
| 1 | Furnished excav SPL (X2040805) | CY | 2.90 | $1,220.00 | $210.00 | $500.00 |
| 2 | HMA surf rem var DP (X4401198) | SY | 3,065 | $17.00 | $25.00 | $10.00 |
| 3 | Remov EX flar end sec (X5427602) | EACH | 4 | $402.00 | $1,150.00 | $500.00 |
| 4 | Fill exist culverts (X6050208) | CY | 8 | $785.00 | $575.00 | $675.00 |
| 5 | Linear delin panels 4 (X6350204) | EACH | 52 | $65.00 | $73.00 | $65.00 |
| 6 | Linear delin panels 6 (X6350206) | EACH | 6 | $75.00 | $84.00 | $75.00 |
| 7 | Temp info signing (X7200061) | SF | 42 | $30.00 | $34.00 | $30.00 |
| 8 | Trainees (Z0076600) | HR | 1,000 | $0.80 | $0.80 | $0.80 |
| 9 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 | $15.00 |
| 10 | Temporary fence (20101000) | LF | 30 | $7.50 | $28.00 | $60.00 |
| 11 | Earth excavation (20200100) | CY | 347 | $20.00 | $105.00 | $75.00 |
| 12 | Trench backfill (20800150) | CY | 43 | $41.00 | $85.00 | $115.00 |
| 13 | Grading & shap ditch (21400100) | LF | 2,250 | $8.40 | $27.00 | $25.00 |
| 14 | Seeding CL 2A (25000210) | ACRE | 0.30 | $5,330.00 | $10,500 | $10,000 |
| 15 | Nitrogen fert nutr (25000400) | LB | 28 | $6.40 | $6.75 | $5.00 |
| 16 | Phosphorus fert nutr (25000500) | LB | 28 | $6.40 | $6.75 | $5.00 |
| 17 | Potassium fert nutr (25000600) | LB | 28 | $6.40 | $6.75 | $5.00 |
| 18 | Erosion contr blanket (25100630) | SY | 1,500 | $2.70 | $2.40 | $3.00 |
| 19 | Stone dump rip CL A4 (28100707) | SY | 21 | $324.00 | $450.00 | $250.00 |
| 20 | Filter fabric (28200200) | SY | 21 | $3.75 | $110.00 | $20.00 |
| 21 | Sub gran mat A (31100100) | TON | 17 | $69.00 | $190.00 | $75.00 |
| 22 | Agg surf course TY B (40200800) | TON | 68 | $69.00 | $89.00 | $75.00 |
| 23 | Bit matls tack CT (40600290) | LB | 78,720 | $0.01 | $0.01 | $0.01 |
| 24 | Long joint sealant (40600370) | LF | 32,416 | $2.70 | $3.50 | $3.10 |
| 25 | Mix CR JTS flangewys (40600400) | TON | 35 | $393.00 | $725.00 | $500.00 |
| 26 | Matl transfer device (40600405) | TON | 24,061 | $6.00 | $10.25 | $15.00 |
| 27 | Temporary ramp (40600990) | SY | 1,137 | $0.01 | $36.00 | $0.01 |
| 28 | HMA BC IL-19.0 N50 (40603080) | TON | 14,437 | $84.00 | $79.00 | $85.00 |
| 29 | HMA SC IL-9.5 C N50 (40604050) | TON | 9,625 | $90.00 | $90.00 | $90.00 |
| 30 | Incidental HMA surf (40800050) | TON | 455 | $200.00 | $290.00 | $150.00 |
| 31 | HMA surf rem 3 3/4 (44000164) | SY | 114,577 | $3.45 | $3.65 | $6.00 |
| 32 | CL D patch T2 18 (44201863) | SY | 46 | $151.00 | $450.00 | $300.00 |
| 33 | CL D patch T3 18 (44201867) | SY | 30 | $151.00 | $420.00 | $300.00 |
| 34 | Agg wedge SHLD type B (48102100) | TON | 2,461 | $37.00 | $37.50 | $37.00 |
| 35 | Pipe culvert remov (50105220) | LF | 169 | $25.00 | $72.00 | $50.00 |
| 36 | P cul CL A 1 eqrs 18 (542A5473) | LF | 52 | $200.00 | $281.00 | $175.00 |
| 37 | P cul CL A 1 eqrs 24 (542A5479) | LF | 37 | $241.00 | $348.00 | $200.00 |
| 38 | P cul CL A 1 eqrs 30 (542A5485) | LF | 38 | $248.00 | $449.00 | $225.00 |
| 39 | P cul CL D 1 18 (542D0223) | LF | 4 | $210.00 | $281.00 | $250.00 |
| 40 | PRCF end S EL eqrs 18 (54214713) | EACH | 2 | $1,480.00 | $10,100 | $1,500.00 |
| 41 | Concrete collar (54248510) | CY | 0.30 | $8,210.00 | $3,935.00 | $10,000 |
| 42 | TRVRS pipe GRT con ES (54260315) | LF | 35.20 | $102.00 | $180.00 | $185.00 |
| 43 | Metal FL end sec 18" (54262718) | EACH | 1 | $740.00 | $2,020.00 | $1,500.00 |
| 44 | Conc ES 542011 24 1:3 (54263324) | EACH | 2 | $5,410.00 | $13,495 | $10,000 |
| 45 | Conc ES 542011 30 1:3 (54263330) | EACH | 2 | $5,660.00 | $20,245 | $10,000 |
| 46 | Pipe culv cleaned 18 (60920018) | LF | 90 | $40.00 | $60.00 | $50.00 |
| 47 | Delineators (63500105) | EACH | 38 | $120.00 | $169.00 | $75.00 |
| 48 | Shoulder rum strip 8 (64200108) | LF | 29,350 | $0.50 | $0.55 | $0.70 |
| 49 | Non SPL waste disposl (66900200) | CY | 80 | $131.00 | $150.00 | $150.00 |
| 50 | Soil disposal analy (66900530) | EACH | 3 | $1,450.00 | $2,024.00 | $1,475.00 |
| 51 | Reg sub P-const plan (66901001) | LS | 1 | $2,200.00 | $2,475.00 | $2,250.00 |
| 52 | Reg sub F con report (66901003) | LS | 1 | $2,200.00 | $2,475.00 | $2,300.00 |
| 53 | Reg sub mon (66901006) | CAL DAY | 3 | $1,400.00 | $1,687.00 | $1,540.00 |
| 54 | Engr field office A (67000400) | CAL MO | 5 | $3,700.00 | $5,000.00 | $3,000.00 |
| 55 | Mobilization (67100100) | LS | 1 | $193,000 | $235,492 | $200,000 |
| 56 | Traf cont-prot 701201 (70100450) | LS | 1 | $6,895.00 | $7,000.00 | $75,000 |
| 57 | Traf cont-prot 701306 (70100460) | LS | 1 | $100.00 | $100.00 | $100.00 |
| 58 | Short term pavt mking (70300100) | LF | 9,990 | $0.01 | $0.01 | $1.50 |
| 59 | SHRT TRM pavt MK rem (70300150) | SF | 1,109 | $0.01 | $0.01 | $2.50 |
| 60 | Pref PL PM TD STD LTR/sym (78004600) | SF | 50 | $56.48 | $22.00 | $19.60 |
| 61 | Pref PL PM TD STD L24 (78004720) | LF | 122 | $28.24 | $33.00 | $30.00 |
| 62 | Mod ureth PM line 4 (78009004) | LF | 182,986 | $0.51 | $0.85 | $0.75 |
| 63 | Mod ureth PM line 6 (78009006) | LF | 16,285 | $0.96 | $0.90 | $0.80 |
| 64 | GRV RCSD PM LTR & sym (78011000) | SF | 50 | $45.42 | $6.45 | $5.75 |
| 65 | GRV RCSD PVT MRKG 25 (78011125) | LF | 122 | $22.71 | $11.25 | $10.00 |
| 66 | Raised refl pavt MKR (78100100) | EACH | 408 | $38.14 | $57.00 | $62.00 |
| 67 | Raised ref PVT MK rem (78300200) | EACH | 408 | $0.01 | $0.01 | $0.01 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.