IDOT contract 78373 bid tabulation
Section (1-4)R-5,RS-2,B-1,B-2,B-3,B-4. Let by Illinois DOT on April 25, 2025, Williamson, District 09. 2 bids received; low bid $40,895,392 by Samron Midwest Contracting, Inc..
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 247
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Samron Midwest Contracting, Inc. | $40,895,392 | Low |
| 2 | E. T. Simonds Construction Company | $42,612,327 | +4.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Samron Midwest Contracting, Inc. | 2. E. T. Simonds Construction Company |
|---|---|---|---|---|---|
| 1 | Grund rod 8' copper (XP000179) | EACH | 5 | $158.00 | $151.13 |
| 2 | Turbidity curtain (X1200247) | SY | 8,412 | $32.00 | $26.47 |
| 3 | STMP CLD PCC MD 4 SPL (X1700006) | SF | 8,891 | $13.00 | $20.63 |
| 4 | Mowing (X2503100) | UNIT | 228 | $26.00 | $71.18 |
| 5 | Mile marker post (X2600030) | EACH | 5 | $665.00 | $1,149.32 |
| 6 | Sign panel T1 SPL DS (X2600031) | SF | 6 | $55.00 | $186.56 |
| 7 | Coarse agr backfil SPL (X3110103) | TON | 114,056 | $35.00 | $35.11 |
| 8 | Conc median remov (X4403300) | SF | 13,833 | $1.00 | $3.29 |
| 9 | Rem conc end sec (X5010523) | EACH | 15 | $852.00 | $424.37 |
| 10 | BR deck grooving long (X5030250) | SY | 3,496 | $11.00 | $11.13 |
| 11 | Bar terminators (X5080530) | EACH | 4,028 | $38.00 | $22.28 |
| 12 | Decorative STL rail (X5091300) | LF | 381 | $497.00 | $471.70 |
| 13 | Remov EX flar end sec (X5427602) | EACH | 5 | $750.00 | $424.37 |
| 14 | Fill exist culverts (X6050208) | CY | 85 | $250.00 | $518.83 |
| 15 | Remove inlet box (X6050700) | EACH | 6 | $725.00 | $841.83 |
| 16 | Rel mod glar SCRN sys (X6380200) | LF | 7,300 | $3.50 | $11.13 |
| 17 | Traf cont & prot SPL (X7010216) | LS | 1 | $874,000 | $697,062 |
| 18 | Temp TRBT T1 SPL tan (X7050167) | EACH | 4 | $4,700.00 | $4,452.00 |
| 19 | Sign panel T1 SPL (X7200105) | SF | 22 | $56.00 | $108.12 |
| 20 | Rem RE-erect EX sign (X7240600) | EACH | 1 | $2,700.00 | $609.50 |
| 21 | Conc foundation GR MT (X7340100) | CY | 0.50 | $2,900.00 | $2,791.42 |
| 22 | Fib opt CBL 12F SM (X8710036) | LF | 79 | $46.00 | $44.65 |
| 23 | FO PTCH panel, 144P R (X8710082) | EACH | 1 | $3,900.00 | $3,717.10 |
| 24 | Ethernet MNG switch (X8710101) | EACH | 1 | $3,600.00 | $3,442.50 |
| 25 | Foc splice - lateral (X8710304) | EACH | 1 | $3,500.00 | $5,291.80 |
| 26 | Fib opt utilit marker (X8710318) | EACH | 1 | $650.00 | $619.24 |
| 27 | Vid & rad hyb det sys (X8891301) | EACH | 1 | $49,000 | $48,713 |
| 28 | Construction layout (Z0013798) | LS | 1 | $250,000 | $296,333 |
| 29 | Tubular marker (Z0024475) | EACH | 99 | $88.00 | $119.42 |
| 30 | Diamond grind BR sec (Z0029090) | SY | 4,961 | $12.00 | $11.27 |
| 31 | Settlement platforms (Z0065100) | EACH | 16 | $5,100.00 | $1,654.28 |
| 32 | Trainees (Z0076600) | HR | 2,000 | $0.80 | $0.80 |
| 33 | Trainees TPG (Z0076604) | HR | 2,000 | $15.00 | $15.00 |
| 34 | Tree remov 6-15 (20100110) | UNIT | 74 | $30.00 | $72.21 |
| 35 | Tree remov over 15 (20100210) | UNIT | 166 | $30.00 | $76.63 |
| 36 | Tree remov acres (20100500) | ACRE | 2 | $16,000 | $27,661 |
| 37 | Earth excavation (20200100) | CY | 53,084 | $20.00 | $18.30 |
| 38 | Exc & GR EX shoulder (20200600) | UNIT | 2 | $4,250.00 | $4,496.34 |
| 39 | Rem & disp uns matl (20201200) | CY | 15,916 | $43.00 | $36.79 |
| 40 | Furnished excavation (20400800) | CY | 3,276 | $35.00 | $22.22 |
| 41 | Trench backfill (20800150) | CY | 538 | $58.00 | $50.02 |
| 42 | Seeding CL 2 (25000200) | ACRE | 14.50 | $2,000.00 | $1,272.00 |
| 43 | Seeding CL 7 (25000350) | ACRE | 14.50 | $550.00 | $1,166.00 |
| 44 | Nitrogen fert nutr (25000400) | LB | 1,305 | $1.95 | $1.54 |
| 45 | Phosphorus fert nutr (25000500) | LB | 1,305 | $1.95 | $1.54 |
| 46 | Potassium fert nutr (25000600) | LB | 1,305 | $1.95 | $1.54 |
| 47 | Agr ground limestone (25000700) | TON | 29 | $151.00 | $212.00 |
| 48 | Mulch method 2 (25100115) | ACRE | 14.50 | $1,400.00 | $1,272.00 |
| 49 | Temp eros contr seed (28000250) | LB | 75,400 | $0.01 | $2.00 |
| 50 | Temp ditch checks (28000305) | LF | 619 | $21.00 | $12.16 |
| 51 | Perimeter eros bar (28000400) | LF | 5,075 | $3.00 | $5.11 |
| 52 | Inlet & pipe protect (28000500) | EACH | 15 | $206.00 | $184.75 |
| 53 | Stone riprap CL A1 (28100201) | TON | 17,918 | $35.00 | $27.79 |
| 54 | Stone riprap CL A5 (28100209) | TON | 25,134 | $44.00 | $35.16 |
| 55 | Filter fabric (28200200) | SY | 36,462 | $1.50 | $1.95 |
| 56 | Sub gran mat A 12 (31100910) | SY | 74,663 | $23.00 | $21.40 |
| 57 | Agg base cse A (35100100) | TON | 154 | $39.00 | $50.00 |
| 58 | Agg base cse A 6 (35100500) | SY | 4,317 | $11.00 | $13.81 |
| 59 | Agg base cse A 8 (35100700) | SY | 21,688 | $15.00 | $16.30 |
| 60 | Bit matls PR CT (40600275) | LB | 152,472 | $0.01 | $0.01 |
| 61 | Bit matls tack CT (40600290) | LB | 37,724 | $0.01 | $0.01 |
| 62 | P bit matls tack CT (40600295) | LB | 78,876 | $0.01 | $0.01 |
| 63 | Long joint sealant (40600370) | LF | 70,313 | $3.50 | $3.34 |
| 64 | Matl transfer device (40600405) | TON | 35,296 | $2.00 | $4.41 |
| 65 | Temporary ramp (40600990) | SY | 542 | $13.00 | $26.51 |
| 66 | P HMA BC IL-9.5FG N90 (40603219) | TON | 3,022 | $133.00 | $121.52 |
| 67 | HMA SC IL-9.5L C N30 (40604090) | TON | 76 | $265.00 | $234.47 |
| 68 | P SC SMA 9.5 E N80 (40605024) | TON | 10,522 | $145.00 | $168.14 |
| 69 | HMA pavt FD 13 (40701941) | SY | 28,441 | $69.00 | $84.26 |
| 70 | PVT con PCC BR app SL (42000080) | SY | 864 | $142.00 | $270.43 |
| 71 | PCC PVT 10 jointed (42000501) | SY | 5,381 | $80.00 | $85.73 |
| 72 | PCC PVT 12 jointed (42000541) | SY | 3,193 | $87.00 | $95.71 |
| 73 | Pavt reinforcement (42100615) | SY | 262 | $62.00 | $14.30 |
| 74 | PC conc sidewalk 5 (42400200) | SF | 71,592 | $7.00 | $6.54 |
| 75 | Detectable warnings (42400800) | SF | 80 | $19.00 | $20.89 |
| 76 | Pavement rem (44000100) | SY | 10,257 | $16.00 | $14.05 |
| 77 | HMA surf rem 1 1/2 (44000155) | SY | 133,329 | $2.50 | $2.27 |
| 78 | HMA surf rem 2 3/4 (44000160) | SY | 43,165 | $3.50 | $5.02 |
| 79 | Paved ditch removal (44004000) | LF | 184 | $17.00 | $9.22 |
| 80 | Paved SHLD removal (44004250) | SY | 26,035 | $10.00 | $14.49 |
| 81 | CL A patch T2 13 (44200610) | SY | 208 | $350.00 | $274.00 |
| 82 | CL A patch T4 13 (44200614) | SY | 54 | $350.00 | $263.00 |
| 83 | CL C patch T2 13 (44201389) | SY | 1,008 | $185.00 | $186.27 |
| 84 | CL D patch T2 13 (44201803) | SY | 80 | $500.00 | $405.23 |
| 85 | Saw cuts (44213200) | LF | 1,528 | $8.30 | $18.37 |
| 86 | Tie bars 3/4 (44213204) | EACH | 90 | $62.50 | $15.90 |
| 87 | HMA shoulders 6 (48203021) | SY | 1,058 | $53.00 | $63.88 |
| 88 | HMA shoulders 13 (48203049) | SY | 35,984 | $60.00 | $76.75 |
| 89 | HMA shoulders (48203100) | TON | 4,305 | $110.00 | $86.87 |
| 90 | PCC shoulders 12 (48300700) | SY | 1,121 | $76.00 | $93.89 |
| 91 | Rem exist struct N1 (50100300) | EACH | 1 | $150,000 | $173,014 |
| 92 | Rem exist struct N2 (50100400) | EACH | 1 | $150,000 | $173,014 |
| 93 | Rem exist struct N3 (50100500) | EACH | 1 | $150,000 | $173,014 |
| 94 | Rem exist struct N4 (50100600) | EACH | 1 | $150,000 | $173,014 |
| 95 | Conc headwall removal (50104400) | EACH | 2 | $2,000.00 | $715.45 |
| 96 | Pipe culvert remov (50105220) | LF | 453 | $17.00 | $11.46 |
| 97 | Structure excavation (50200100) | CY | 1,546 | $17.00 | $31.50 |
| 98 | Cofferdam excavation (50200300) | CY | 2,446 | $62.00 | $78.34 |
| 99 | Cofferdam typ 2 loc 1 (50201121) | EACH | 1 | $300,000 | $248,826 |
| 100 | Cofferdam typ 2 loc 2 (50201122) | EACH | 1 | $300,000 | $248,826 |
| 101 | Cofferdam typ 2 loc 3 (50201123) | EACH | 1 | $300,000 | $246,731 |
| 102 | Cofferdam typ 2 loc 4 (50201124) | EACH | 1 | $300,000 | $246,731 |
| 103 | Cofferdam typ 2 loc 5 (50201125) | EACH | 1 | $300,000 | $264,804 |
| 104 | Cofferdam typ 2 loc 6 (50201126) | EACH | 1 | $300,000 | $264,804 |
| 105 | Cofferdam typ 2 loc 7 (50201127) | EACH | 1 | $300,000 | $254,226 |
| 106 | Cofferdam typ 2 loc 8 (50201128) | EACH | 1 | $300,000 | $254,226 |
| 107 | Floor drains (50300100) | EACH | 70 | $600.00 | $703.35 |
| 108 | Conc struct (50300225) | CY | 1,442.10 | $1,200.00 | $1,287.62 |
| 109 | Conc sup-STR (50300255) | CY | 1,092.90 | $1,500.00 | $1,685.67 |
| 110 | Seal coat conc (50300265) | CY | 990 | $237.00 | $349.03 |
| 111 | Protective coat (50300300) | SY | 6,348 | $1.25 | $2.46 |
| 112 | Conc supstr app slab (50301350) | CY | 749.80 | $450.00 | $539.96 |
| 113 | F & E struct steel (50500105) | LS | 1 | $2,800,000 | $2,944,863 |
| 114 | Stud shear connectors (50500505) | EACH | 29,541 | $4.00 | $4.39 |
| 115 | Reinf bars, epoxy CTD (50800205) | LB | 753,720 | $1.50 | $1.90 |
| 116 | Parapet railing (50901750) | LF | 381 | $195.00 | $185.50 |
| 117 | Fur STL pile HP14X89 (51201900) | LF | 10,369 | $98.00 | $140.52 |
| 118 | Driving piles (51202305) | LF | 10,369 | $0.01 | $0.01 |
| 119 | Test pile ST HP14X89 (51203900) | EACH | 16 | $4,500.00 | $11,137 |
| 120 | Pile shoes (51204650) | EACH | 180 | $139.00 | $137.50 |
| 121 | Name plates (51500100) | EACH | 4 | $500.00 | $721.00 |
| 122 | Anchor bolts 1 (52100520) | EACH | 360 | $67.00 | $246.74 |
| 123 | P cul CL A 1 18 (542A0223) | LF | 68 | $100.00 | $105.05 |
| 124 | P cul CL A 1 24 (542A0229) | LF | 234 | $92.00 | $114.47 |
| 125 | P cul CL A 1 48 (542A0253) | LF | 14 | $315.00 | $259.47 |
| 126 | P cul CL A 42 JKD (542JA042) | LF | 173 | $333.00 | $2,786.74 |
| 127 | P cul CL A 1 18 temp (5421A018) | LF | 320 | $63.00 | $74.60 |
| 128 | PRC flar end sec 18 (54213663) | EACH | 4 | $1,500.00 | $1,748.67 |
| 129 | PRC flar end sec 24 (54213669) | EACH | 10 | $1,800.00 | $2,085.12 |
| 130 | PRC flar end sec 42 (54213687) | EACH | 2 | $2,800.00 | $3,500.59 |
| 131 | Cip RC end sec 18 (54215418) | EACH | 1 | $5,400.00 | $7,165.63 |
| 132 | Cip RC end sec 48 (54215448) | EACH | 1 | $6,200.00 | $11,927 |
| 133 | FL inlt BX med 542546 (54244405) | EACH | 6 | $4,300.00 | $5,424.93 |
| 134 | Inlet box 542531 (54246405) | EACH | 5 | $16,150 | $35,105 |
| 135 | Concrete collar (54248510) | CY | 2.60 | $660.00 | $1,270.06 |
| 136 | Storm sew CL A 1 12 (550A0050) | LF | 516 | $76.00 | $82.63 |
| 137 | Storm sew CL A 1 15 (550A0070) | LF | 167 | $69.00 | $87.58 |
| 138 | Storm sew CL A 1 18 (550A0090) | LF | 134 | $78.00 | $93.92 |
| 139 | Storm sew CL A 1 24 (550A0120) | LF | 1,003 | $112.00 | $107.75 |
| 140 | Storm sewer rem 12 (55100500) | LF | 135 | $26.00 | $12.48 |
| 141 | Storm sewer rem 15 (55100700) | LF | 10 | $25.00 | $16.15 |
| 142 | Storm sewer rem 18 (55100900) | LF | 126 | $28.00 | $16.48 |
| 143 | Granular backfill STR (58600101) | CY | 933 | $55.00 | $81.70 |
| 144 | Geocomposite wall DR (59100100) | SY | 418 | $29.00 | $18.75 |
| 145 | P undr for struct 4 (60146304) | LF | 930 | $21.00 | $18.92 |
| 146 | Man TA 4 dia T1F CL (60218400) | EACH | 1 | $3,500.00 | $3,759.09 |
| 147 | Man TA 4 dia T3F&G (60218500) | EACH | 2 | $3,400.00 | $4,000.25 |
| 148 | Man TA 5 dia T3F&G (60221200) | EACH | 2 | $5,100.00 | $4,617.85 |
| 149 | Man TA 8 dia T1F CL (60224459) | EACH | 1 | $11,600 | $13,507 |
| 150 | Inlets TA T3F&G (60235700) | EACH | 9 | $1,900.00 | $2,411.56 |
| 151 | Inlets TB T3F&G (60240220) | EACH | 5 | $2,600.00 | $3,094.15 |
| 152 | Inlets reconst (60262700) | EACH | 1 | $1,600.00 | $6,526.81 |
| 153 | Comb CC&G TM4.12 (60608562) | LF | 152 | $71.00 | $112.16 |
| 154 | Comb CC&G TM6.06 (60608600) | LF | 1,169 | $49.00 | $66.13 |
| 155 | Comb CC&G TM6.24 (60610400) | LF | 1,332 | $49.00 | $80.86 |
| 156 | SPBGR TY A 6FT posts (63000001) | LF | 9,125 | $47.00 | $46.39 |
| 157 | Traf bar term T2 (63100045) | EACH | 5 | $2,200.00 | $2,120.00 |
| 158 | Traf bar term T6 (63100085) | EACH | 12 | $7,000.00 | $6,572.00 |
| 159 | TR bar TRM T1 SPL tan (63100167) | EACH | 9 | $6,000.00 | $5,300.00 |
| 160 | Guardrail remov (63200310) | LF | 9,565 | $6.00 | $5.72 |
| 161 | Mod glar SCR sys temp (63800920) | LF | 7,375 | $16.00 | $6.20 |
| 162 | Sight SCRN (CLF) 6 (64000110) | LF | 539 | $42.00 | $119.30 |
| 163 | Non SPL waste disposl (66900200) | CY | 493 | $92.00 | $84.95 |
| 164 | Soil disposal analy (66900530) | EACH | 1 | $1,875.00 | $1,590.00 |
| 165 | Reg sub P-const plan (66901001) | LS | 1 | $2,600.00 | $2,332.00 |
| 166 | Reg sub F con report (66901003) | LS | 1 | $2,600.00 | $2,332.00 |
| 167 | Reg sub mon (66901006) | CAL DAY | 25 | $1,300.00 | $1,060.00 |
| 168 | Engr field office A (67000400) | CAL MO | 56 | $1,800.00 | $2,200.00 |
| 169 | Mobilization (67100100) | LS | 1 | $2,450,000 | $2,234,323 |
| 170 | Traf cont-prot 701421 (70100310) | LS | 1 | $91,000 | $0.01 |
| 171 | Traf cont-prot 701206 (70100455) | LS | 1 | $7,000.00 | $0.01 |
| 172 | Traf cont-prot 701406 (70100700) | LS | 1 | $12,000 | $0.01 |
| 173 | TR cont surveillance (70103815) | CAL DAY | 730 | $0.01 | $0.01 |
| 174 | Changeable message SN (70107025) | CAL DAY | 210 | $125.00 | $46.72 |
| 175 | Night work zone light (70200100) | LS | 1 | $36,000 | $45,000 |
| 176 | Short term pavt mking (70300100) | LF | 6,520 | $3.00 | $3.91 |
| 177 | SHRT TRM pavt MK rem (70300150) | SF | 54,727 | $1.75 | $0.01 |
| 178 | Temp PVT MK line 4 - paint (70300221) | LF | 151,470 | $0.50 | $0.42 |
| 179 | Temp PVT MK L4 T4 tape (70307120) | LF | 157,580 | $2.40 | $0.01 |
| 180 | Temp conc barrier (70400100) | LF | 11,631 | $46.00 | $21.19 |
| 181 | Pin temp conc barrier (70400125) | EACH | 11 | $57.00 | $59.78 |
| 182 | Rel temp conc barrier (70400200) | LF | 10,337 | $6.00 | $8.58 |
| 183 | Temp SPBGR TY A (70500100) | LF | 350 | $43.00 | $40.28 |
| 184 | Temp TR bar term T6 (70500665) | EACH | 4 | $5,200.00 | $4,982.00 |
| 185 | Imp attn temp NRN TL3 (70600251) | EACH | 1 | $8,400.00 | $5,553.00 |
| 186 | Imp attn temp FRN TL3 (70600260) | EACH | 7 | $23,000 | $15,775 |
| 187 | Imp attn rel FRN TL3 (70600332) | EACH | 6 | $2,000.00 | $5,388.00 |
| 188 | Sign panel T1 (72000100) | SF | 106 | $28.00 | $34.98 |
| 189 | Sign panel T2 (72000200) | SF | 10 | $27.00 | $110.00 |
| 190 | Terminal marker - DA (72501000) | EACH | 13 | $18.00 | $63.60 |
| 191 | Teles STL sin support (72800100) | LF | 36 | $16.00 | $29.68 |
| 192 | Wood sin support (73000100) | LF | 99 | $32.00 | $29.68 |
| 193 | Base tel STL sin supp (73100100) | EACH | 4 | $392.00 | $148.40 |
| 194 | Pref PL PM TB STD L4 (78003111) | LF | 4,997 | $7.00 | $6.21 |
| 195 | Mod ureth PM LTR-sym (78009000) | SF | 815 | $23.00 | $21.20 |
| 196 | Mod ureth PM line 4 (78009004) | LF | 96,910 | $0.90 | $0.80 |
| 197 | Mod ureth PM line 12 (78009012) | LF | 3,404 | $11.00 | $10.60 |
| 198 | Mod ureth PM line 24 (78009024) | LF | 69 | $22.00 | $21.20 |
| 199 | GRV RCSD PM LTR & sym (78011000) | SF | 815 | $5.00 | $4.77 |
| 200 | GRV RCSD PVT MRKG 5 (78011025) | LF | 96,910 | $0.60 | $0.53 |
| 201 | GRV RCSD PVT MRKG 13 (78011065) | LF | 3,404 | $4.50 | $4.24 |
| 202 | GRV RCSD PVT MRKG 25 (78011125) | LF | 69 | $5.00 | $4.77 |
| 203 | Raised refl pavt MKR (78100100) | EACH | 734 | $50.00 | $40.81 |
| 204 | Grdrail ref type A (78200005) | EACH | 74 | $11.00 | $10.60 |
| 205 | Grdrail ref type B (78200006) | EACH | 16 | $11.00 | $10.60 |
| 206 | Barr wall ref type C (78200011) | EACH | 113 | $50.00 | $11.23 |
| 207 | Raised ref PVT MK rem (78300200) | EACH | 802 | $26.00 | $8.23 |
| 208 | PVT MKG rem WTR blast (78300202) | SF | 48,228 | $0.80 | $0.69 |
| 209 | Locate undergr cable (80300100) | LF | 9,100 | $0.50 | $0.49 |
| 210 | Elect serv install (80400100) | EACH | 1 | $4,100.00 | $3,947.66 |
| 211 | Serv install GRND MT (80500010) | EACH | 1 | $15,000 | $14,498 |
| 212 | Undrgrd C PVC 2 (81028350) | LF | 110 | $24.00 | $23.40 |
| 213 | Undrgrd C PVC 3 (81028370) | LF | 43 | $34.00 | $32.35 |
| 214 | Undrgrd C PVC 4 (81028390) | LF | 331 | $41.00 | $38.85 |
| 215 | Undrgrd C CNC 3 (81028770) | LF | 679 | $45.00 | $42.76 |
| 216 | Handhole (81400100) | EACH | 4 | $2,900.00 | $2,751.41 |
| 217 | DBL handhole (81400300) | EACH | 1 | $4,300.00 | $4,128.33 |
| 218 | UD 2#10#10GXLPUSE 3/4 (81603010) | LF | 4,298 | $18.00 | $16.86 |
| 219 | EC C XLP use 3-1C 10 (81702450) | LF | 776 | $6.00 | $5.23 |
| 220 | Lum LED rdwy H (82110008) | EACH | 27 | $1,040.00 | $995.00 |
| 221 | LT cont pedm 240V100 (82500335) | EACH | 1 | $11,700 | $11,218 |
| 222 | LT P A 40MH 8DA-TW (83002350) | EACH | 2 | $7,500.00 | $7,172.84 |
| 223 | LT P A 40MH 15DA (83002600) | EACH | 12 | $7,200.00 | $6,869.33 |
| 224 | LT P A 45MH 15DA (83003600) | EACH | 8 | $7,700.00 | $7,386.75 |
| 225 | LT P GS 45MH 15MA (83060450) | EACH | 1 | $8,000.00 | $7,678.70 |
| 226 | Light pole FDN 30D (83600300) | LF | 138.50 | $465.00 | $454.27 |
| 227 | Rem LT U no salv (84200600) | EACH | 10 | $870.00 | $829.98 |
| 228 | Rem pole FDN (84200804) | EACH | 10 | $870.00 | $829.98 |
| 229 | Remov lighting contr (84500110) | EACH | 1 | $578.00 | $553.32 |
| 230 | Remov LTG contr FDN (84500130) | EACH | 1 | $578.00 | $553.32 |
| 231 | Fac T5 cab (85700300) | EACH | 1 | $33,500 | $32,072 |
| 232 | Uninter power sup ext (86200300) | EACH | 1 | $7,200.00 | $6,828.63 |
| 233 | Elcbl C signal 14 5C (87301245) | LF | 1,107 | $4.50 | $4.37 |
| 234 | Elcbl C signal 14 7C (87301255) | LF | 632 | $5.55 | $5.31 |
| 235 | Elcbl C serv 6 3C (87301815) | LF | 57 | $8.00 | $7.84 |
| 236 | Elcbl C egrdc 6 1C (87301900) | LF | 468 | $5.00 | $4.55 |
| 237 | TS post galvs 14 (87502480) | EACH | 1 | $3,200.00 | $3,082.62 |
| 238 | STL comb maa&P 18 (87702820) | EACH | 1 | $27,000 | $26,039 |
| 239 | STL comb maa&P 48 (87702970) | EACH | 1 | $41,000 | $39,409 |
| 240 | Conc FDN TY A (87800100) | LF | 3 | $461.00 | $441.15 |
| 241 | Conc FDN TY C (87800150) | LF | 3.50 | $918.00 | $879.51 |
| 242 | Conc FDN TY E 30D (87800400) | LF | 10 | $455.00 | $435.96 |
| 243 | Conc FDN TY E 36D (87800415) | LF | 13 | $374.00 | $357.61 |
| 244 | SH LED 1F 3S mam (88030020) | EACH | 4 | $1,300.00 | $1,231.17 |
| 245 | SH LED 1F 3S BM (88030050) | EACH | 3 | $1,200.00 | $1,187.81 |
| 246 | SH LED 1F 5S BM (88030100) | EACH | 2 | $1,500.00 | $1,447.97 |
| 247 | TS backplate ret-refl (88200510) | EACH | 9 | $404.00 | $386.82 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.