IDOT contract 62V89 bid tabulation

Section FAP. Let by Illinois DOT on April 25, 2025, Cook, District 01. 4 bids received; low bid $2,516,963 by Plote Construction, Inc..

Owner
Illinois DOT
Letting
25 APR 2025
Pay items
86
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Plote Construction, Inc.$2,516,963Low
2K-Five Construction Corporation$2,681,503+7.0%
3Builders Paving, LLC$2,718,818+8.0%
4R. W. Dunteman Company$2,843,406+13%
IDOT contract 62V89: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Plote Construction, Inc.2. K-Five Construction Corporation3. Builders Paving, LLC4. R. W. Dunteman Company
1Constructn layout SPL (X0320050)LS1$9,500.00$6,900.00$15,000$8,000.00
2Ped signal post 10 FT (X1400367)EACH5$1,332.78$1,399.81$1,350.00$1,366.49
3Ped signal post 5 FT (X1400378)EACH16$1,060.49$960.34$1,100.00$1,087.31
4Selective clearing (X2010516)UNIT7$450.00$470.00$470.00$450.00
5CC&G RMVL repl < = 10 (X4400501)LF85$55.00$54.00$102.00$71.37
6CC&G RMVL repl > 10FT (X4400503)LF945$55.00$54.00$82.00$70.73
7SS cleaned 12 (X5537800)LF860$1.00$1.00$1.00$3.00
8FR & lids adjust SPL (X6030310)EACH8$1,250.00$1,250.00$1,250.00$1,250.00
9Engrs FLD ofc TY A D1 (X6700407)CAL MO12$3,500.00$3,300.00$3,500.00$4,500.00
10Accessible ped signal (X8760200)EACH34$1,752.92$1,808.59$1,750.00$1,797.25
11Conc FDN TY A 12D (X8780012)LF84$268.59$481.47$275.00$275.38
12Drainage STR cleaned (Z0018500)EACH86$320.00$315.00$315.00$350.00
13Temp info signing (Z0030850)SF102.80$15.00$15.00$15.00$15.00
14RE-optimize TR sig sys 1 (Z0033044)EACH3$575.00$525.00$575.00$589.54
15Earth excavation (20200100)CY26$96.00$65.00$50.00$65.00
16Topsoil F & P 4 (21101615)SY153$18.00$5.00$15.00$5.00
17Sodding salt tolerant (25200110)SY153$32.00$50.00$25.00$50.00
18Supple watering (25200200)UNIT8$25.00$1.00$55.00$1.00
19Bit matls tack CT (40600290)LB34,936$0.01$0.92$0.01$0.64
20Long joint sealant (40600370)LF40,212$2.45$2.33$3.00$2.34
21Mix CR JTS flangewys (40600400)TON116$150.00$100.00$200.00$394.52
22HMA surf rem butt JT (40600982)SY446$14.00$9.25$25.00$30.17
23HMA repl over patch (40601005)TON375$75.00$204.47$175.00$137.79
24P HMA SC SMA 9.5 F N80 (40605026)TON7,533$126.00$117.88$104.00$107.04
25Protective coat (42001300)SY750$0.01$0.01$0.10$3.00
26PC conc sidewalk 5 (42400200)SF2,616$13.75$13.75$9.40$15.00
27Detectable warnings (42400800)SF330$32.00$32.00$38.00$55.00
28HMA surf rem 1 3/4 (44000156)SY76,866$3.00$2.35$4.00$2.35
29Sidewalk rem (44000600)SF2,805$3.00$3.00$4.00$5.00
30HMA RM OV patch 4 (44002216)SY2,025$5.00$0.01$0.01$13.68
31Median removal (44003100)SF2,515$5.50$5.50$3.00$9.72
32CL C patch T4 12 (44201383)SY20$355.00$355.00$250.00$226.77
33CL D patch T2 10 (44201765)SY2,604$60.00$40.00$80.00$131.85
34CL D patch T3 10 (44201769)SY120$50.00$40.00$80.00$120.37
35CL D patch T4 10 (44201771)SY345$45.00$40.00$80.00$109.83
36CB adjust (60250200)EACH3$450.00$450.00$450.00$450.00
37CB reconst (60252800)EACH3$1,450.00$1,450.00$1,450.00$1,450.00
38Man adjust (60255500)EACH3$550.00$550.00$550.00$550.00
39Man reconst (60257900)EACH3$1,850.00$1,850.00$1,850.00$1,850.00
40FR & grates adjust (60300105)EACH13$450.00$450.00$450.00$450.00
41FR & lids adjust (60300305)EACH16$450.00$450.00$450.00$450.00
42FR & grates T24 (60404950)EACH2$485.00$485.00$485.00$485.00
43FR & lids T1 OL (60406000)EACH3$455.00$455.00$455.00$455.00
44FR & lids T1 CL (60406100)EACH3$455.00$455.00$455.00$455.00
45Comb CC&G TY B-6.24 (60605000)LF215$52.00$52.00$67.00$78.78
46Conc median surf 4 (60618300)SF250$10.00$10.00$10.00$17.08
47Conc med TSB6.24 (60620000)SF2,513$23.50$23.50$18.00$31.72
48Non SPL waste disposl (66900200)CY26$81.00$103.01$100.00$120.91
49Soil disposal analy (66900530)EACH2$900.00$900.00$900.00$900.00
50Reg sub P-const plan (66901001)LS1$4,600.00$4,600.00$4,600.00$4,600.00
51Reg sub F con report (66901003)LS1$500.00$500.00$500.00$500.00
52Reg sub mon (66901006)CAL DAY10$700.00$700.00$700.00$700.00
53Mobilization (67100100)LS1$151,000$145,000$331,535$165,074
54Traf cont-prot 701421 (70100310)LS1$1.00$4,409.51$4,000.00$75,194
55Traf cont-prot 701422 (70100320)LS1$1.00$4,000.00$4,000.00$3,934.00
56TR cont & prot 701601 (70102630)LS1$103,000$319,030$4,000.00$79,264
57TR cont & prot 701701 (70102635)LS1$1.00$4,000.00$4,000.00$3,934.00
58TR cont & prot 701801 (70102640)LS1$1.00$4,000.00$4,000.00$3,934.00
59Night work zone light (70200100)LS1$2,000.00$50,000$15,000$7,574.52
60Short term pavt mking (70300100)LF7,802$0.01$0.01$2.50$1.19
61SHRT TRM pavt MK rem (70300150)SF2,605$0.01$0.01$0.01$1.30
62Temp PVT MK LTR & sym paint (70300211)SF2,002$0.01$0.01$1.75$1.75
63Temp PVT MK line 4 - paint (70300221)LF31,948$0.01$0.01$0.35$0.35
64Temp PVT MK line 6 - paint (70300241)LF6,853$0.01$0.01$0.55$0.53
65Temp PVT MK line 8 - paint (70300251)LF350$0.01$0.01$0.70$0.70
66Temp PVT MK line 12 - paint (70300261)LF1,950$0.01$0.01$1.05$1.06
67Temp PVT MK line 24 - paint (70300281)LF845$0.01$0.01$1.60$1.60
68THPL PVT MK LTR & sym (78000100)SF2,002$5.75$5.75$5.75$5.75
69THPL PVT MK line 4 (78000200)LF31,948$0.75$0.75$0.75$0.75
70THPL PVT MK line 6 (78000400)LF6,853$0.85$0.85$0.85$0.85
71THPL PVT MK line 8 (78000500)LF350$2.00$2.00$2.00$2.00
72THPL PVT MK line 12 (78000600)LF1,950$3.32$3.32$3.30$3.32
73THPL PVT MK line 24 (78000650)LF845$5.75$5.75$5.75$5.75
74Raised refl pavt MKR (78100100)EACH700$38.00$38.00$38.00$38.00
75Raised ref PVT MK rem (78300200)EACH654$15.00$0.01$18.00$8.42
76Undrgrd C galvs 2 (81028200)LF365$50.37$63.20$50.00$51.64
77Main EX TR sig instal (85000200)EACH3$8,090.91$525.00$8,100.00$8,295.54
78Elcbl C signal 14 2C (87301215)LF5,815$3.42$3.32$3.45$3.51
79Elcbl C signal 14 3C (87301225)LF2,090$3.57$3.45$3.55$3.66
80Drill EX handhole (87900200)EACH22$816.36$869.08$825.00$837.01
81Ped SH LED 1F BM CDT (88102717)EACH8$813.48$1,163.88$825.00$834.05
82Det loop T1 (88600100)LF2,615$27.63$31.50$27.75$28.33
83Reloc EX ped sig head (89500200)EACH1$521.48$651.81$525.00$534.67
84Rem elcbl FR con (89502300)LF792$1.97$2.17$2.00$2.02
85Remov EX TS equip (89502375)EACH2$1,179.55$3,910.87$1,200.00$1,209.38
86Rebuild EX handhole (89502376)EACH8$2,232.73$1,630.89$2,250.00$2,289.20
IDOT contract 62V89: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy