IDOT contract 62V56 bid tabulation

Section FAP. Let by Illinois DOT on April 25, 2025, Cook, District 01. 1 bid received; low bid $5,412,662 by K-Five Construction Corporation.

Owner
Illinois DOT
Letting
25 APR 2025
Pay items
102
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1K-Five Construction Corporation$5,412,662Low
IDOT contract 62V56: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. K-Five Construction Corporation
1Tree care (K0026700)EACH50$135.00
2Weed control teasel (K0029624)GAL5$353.70
3Constructn layout SPL (X0320050)LS1$4,800.00
4Park bench rem & rel (X0320090)EACH1$1,000.00
5Weed cont basal TRTMT (X0325222)GAL50$311.85
6CC&G RMVL repl < = 10 (X4400501)LF100$60.00
7CC&G RMVL repl > 10FT (X4400503)LF873$60.00
8SS cleaned 12 (X5537800)LF1,000$2.00
9SS cleaned 24 (X5538200)LF150$1.00
10FR & lids adjust SPL (X6030310)EACH24$1,300.00
11Engrs FLD ofc TY A D1 (X6700407)CAL MO12$3,300.00
12Temp info signing (X7200061)SF189$20.00
13Rebld EX DBL handhole (X8140238)EACH1$5,021.74
14Accessible ped signal (X8760200)EACH2$3,913.66
15Det loop repl (X8860105)LF1,533$34.38
16Rebld EX handhole SPL (X8950205)EACH1$4,125.68
17Gas valve adjusted (Z0001110)EACH7$1,000.00
18Concrete steps (Z0012450)CY0.10$10,000
19Drainage STR cleaned (Z0018500)EACH37$318.00
20RE-optimize TR sig sys 1 (Z0033044)EACH1$935.00
21Rem EX sign post (Z0051398)EACH1$250.00
22Tree prun 1-10 (20101300)EACH5$124.20
23Tree prun over 10 (20101350)EACH10$124.20
24Earth excavation (20200100)CY505$77.35
25Trench backfill (20800150)CY38$65.00
26Topsoil F & P 4 (21101615)SY1,223$5.40
27Grading & shap ditch (21400100)LF269$11.73
28Seeding CL 2A (25000210)ACRE0.25$7,668.00
29Nitrogen fert nutr (25000400)LB14$1.00
30Potassium fert nutr (25000600)LB14$1.00
31Interseed CL 2A (25003210)ACRE2$6,048.00
32Erosion contr blanket (25100630)SY1,145$6.50
33Sodding salt tolerant (25200110)SY78$21.50
34Bit matls tack CT (40600290)LB78,560$0.01
35Long joint sealant (40600370)LF64,298$2.57
36Mix CR JTS flangewys (40600400)TON175$50.00
37HMA surf rem butt JT (40600982)SY1,084$1.00
38Temporary ramp (40600990)SY40$15.00
39HMA repl over patch (40601005)TON1,473$65.00
40HMA BC IL-9.5 N70 (40602985)TON1,247$84.03
41P HMA BC IL-4.75 N50 (40603200)TON4,342$143.00
42HMA SC IL-9.5 D N50 (40604060)TON36$295.00
43P HMA SC SMA 9.5 F N80 (40605026)TON12,048$139.24
44Protective coat (42001300)SY32$3.00
45PC conc sidewalk 5 (42400200)SF3,518$13.00
46Detectable warnings (42400800)SF295$55.00
47HMA surf rem 2 (44000157)SY325$2.71
48HMA surf rem 2 1/2 (44000159)SY105,249$4.04
49HMA surf rem 3 3/4 (44000164)SY11,135$4.50
50Sidewalk rem (44000600)SF4,311$3.00
51HMA RM OV patch 4 (44002216)SY6,576$0.01
52CL D patch T2 10 (44201765)SY2,328$45.00
53CL D patch T3 10 (44201769)SY1,746$30.50
54CL D patch T4 10 (44201771)SY1,746$30.50
55Storm sew CL A 2 12 (550A0340)LF38$150.00
56Water valves adjust (56109210)EACH1$1,000.00
57Inlets TA T3F&G (60235700)EACH1$1,700.00
58CB adjust (60250200)EACH4$1,000.00
59CB reconst (60252800)EACH2$1,800.00
60Man adjust (60255500)EACH2$1,000.00
61Man reconst (60257900)EACH1$1,800.00
62Shoulder rum strip 8 (64200108)LF5,300$1.80
63Non SPL waste disposl (66900200)CY505$92.17
64Soil disposal analy (66900530)EACH2$1,450.00
65Reg sub P-const plan (66901001)LS1$3,100.00
66Reg sub F con report (66901003)LS1$1,200.00
67Reg sub mon (66901006)CAL DAY2$680.00
68Mobilization (67100100)LS1$342,759
69Traf cont-prot 701421 (70100310)LS1$1.00
70Traf cont-prot 701411 (70100420)EACH2$1.00
71Traf cont-prot 701401 (70100800)LS1$1.00
72TR cont & prot 701606 (70102625)LS1$500,000
73TR cont & prot 701601 (70102630)LS1$322,589
74TR cont & prot 701701 (70102635)LS1$1.00
75Night work zone light (70200100)LS1$1.00
76Short term pavt mking (70300100)LF43,983$0.50
77SHRT TRM pavt MK rem (70300150)SF11,729$1.00
78Temp PVT MK LTR & sym paint (70300211)SF367$5.75
79Temp PVT MK line 4 - paint (70300221)LF41,206$0.95
80Temp PVT MK line 6 - paint (70300241)LF1,895$1.20
81Temp PVT MK line 8 - paint (70300251)LF11,375$1.80
82Temp PVT MK line 12 - paint (70300261)LF7,905$3.00
83Temp PVT MK line 24 - paint (70300281)LF493$5.75
84Rem & rel sign panel asmbly TA (72400205)EACH4$150.00
85Rem & rel sign panel asmbly TB (72400210)EACH3$150.00
86THPL PVT MK LTR & sym (78000100)SF367$5.75
87THPL PVT MK line 4 (78000200)LF41,206$0.95
88THPL PVT MK line 6 (78000400)LF1,895$1.20
89THPL PVT MK line 8 (78000500)LF11,735$1.80
90THPL PVT MK line 12 (78000600)LF7,904$3.00
91THPL PVT MK line 24 (78000650)LF493$5.75
92Raised refl pavt MKR (78100100)EACH873$37.85
93Raised ref PVT MK rem (78300200)EACH698$10.00
94PVT MKG rem WTR blast (78300202)SF34,697$1.25
95Undrgrd C galvs 2 (81028200)LF45$58.92
96Rem pole FDN (84200804)EACH1$1,854.62
97Main EX TR sig instal (85000200)EACH1$7,251.36
98Elcbl C lead 14 1PR (87301305)LF2,073$5.17
99Inductive loop detect (88500100)EACH2$391.00
100Det loop T1 (88600100)LF951$50.32
101Rem elcbl FR con (89502300)LF2,073$4.48
102Remov EX TS equip (89502375)EACH1$1,979.62
IDOT contract 62V56: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy