IDOT contract 61L22 bid tabulation
Bartlett, section 16-00089-00-RS. Let by Illinois DOT on April 25, 2025, Cook, District 01. 5 bids received; low bid $935,775 by Everlast Blacktop Inc..
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 72
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Everlast Blacktop Inc. | $935,775 | Low |
| 2 | Schroeder Asphalt Services, Inc. | $946,187 | +1.0% |
| 3 | A Lamp Concrete Contractors, Inc. | $954,974 | +2.0% |
| 4 | Plote Construction, Inc. | $1,022,000 | +9.0% |
| 5 | Builders Paving, LLC | $1,028,217 | +10% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Everlast Blacktop Inc. | 2. Schroeder Asphalt Services, Inc. | 3. A Lamp Concrete Contractors, Inc. | 4. Plote Construction, Inc. | 5. Builders Paving, LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | CC&G RMVL repl < = 10 (X4400501) | LF | 400 | $56.00 | $72.00 | $73.00 | $65.00 | $65.00 |
| 2 | CC&G RMVL repl > 10FT (X4400503) | LF | 1,208 | $55.00 | $72.00 | $54.50 | $65.00 | $65.00 |
| 3 | FR & lids adjust SPL (X6030310) | EACH | 38 | $960.00 | $1,375.00 | $1,250.00 | $1,250.00 | $1,250.00 |
| 4 | Conc med TSB SPL (X6061100) | SF | 1,256 | $25.00 | $24.20 | $20.00 | $22.00 | $22.00 |
| 5 | Temp info signing (X7200061) | SF | 52 | $25.00 | $22.00 | $18.00 | $20.00 | $20.00 |
| 6 | Construction layout (Z0013798) | LS | 1 | $6,500.00 | $7,500.00 | $5,500.00 | $25,000 | $5,500.00 |
| 7 | Drain util STR adj (Z0017400) | EACH | 53 | $650.00 | $500.00 | $450.00 | $450.00 | $450.00 |
| 8 | Drain util STR recon (Z0017700) | EACH | 1 | $2,000.00 | $1,600.00 | $1,450.00 | $1,450.00 | $1,450.00 |
| 9 | Drainage STR removed (Z0018700) | EACH | 4 | $400.00 | $550.00 | $500.00 | $500.00 | $500.00 |
| 10 | Earth exc wid (20200500) | CY | 18 | $50.00 | $85.00 | $62.00 | $100.00 | $110.00 |
| 11 | Trench backfill (20800150) | CY | 41 | $50.00 | $28.00 | $25.00 | $25.00 | $25.00 |
| 12 | Topsoil F & P 4 (21101615) | SY | 699 | $5.00 | $6.60 | $5.00 | $6.00 | $6.00 |
| 13 | Seeding CL 1A (25000110) | ACRE | 0.30 | $2,000.00 | $6,800.00 | $5,500.00 | $6,000.00 | $6,000.00 |
| 14 | Nitrogen fert nutr (25000400) | LB | 23 | $1.00 | $2.00 | $1.00 | $1.00 | $1.00 |
| 15 | Potassium fert nutr (25000600) | LB | 23 | $1.00 | $2.00 | $1.00 | $1.00 | $1.00 |
| 16 | Erosion contr blanket (25100630) | SY | 699 | $2.00 | $3.60 | $3.75 | $3.25 | $3.25 |
| 17 | Temp eros contr seed (28000250) | LB | 30 | $2.00 | $1.15 | $15.00 | $1.00 | $1.00 |
| 18 | Inlet filters (28000510) | EACH | 73 | $1.00 | $220.00 | $15.00 | $200.00 | $200.00 |
| 19 | Agg base cse B 9 (35102100) | SY | 363 | $16.87 | $15.50 | $18.75 | $18.00 | $23.00 |
| 20 | HMA base cse 7 (35501312) | SY | 224 | $64.58 | $60.00 | $48.25 | $86.00 | $72.00 |
| 21 | Bit matls tack CT (40600290) | LB | 14,502 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 22 | Long joint sealant (40600370) | LF | 12,292 | $3.00 | $2.95 | $2.42 | $2.50 | $2.92 |
| 23 | Mix CR JTS flangewys (40600400) | TON | 20 | $25.00 | $300.00 | $100.00 | $450.00 | $655.00 |
| 24 | HMA surf rem butt JT (40600982) | SY | 212 | $25.90 | $6.00 | $18.50 | $24.00 | $15.00 |
| 25 | P HMA BC IL-4.75 N50 (40603200) | TON | 902 | $102.00 | $105.00 | $110.00 | $122.00 | $90.00 |
| 26 | HMA SC IL-9.5 D N70 (40604062) | TON | 1,805 | $89.57 | $87.00 | $91.00 | $86.00 | $90.00 |
| 27 | PC conc sidewalk 5 (42400200) | SF | 3,755 | $11.00 | $11.00 | $9.00 | $10.00 | $10.00 |
| 28 | PC conc sidewalk 6 (42400300) | SF | 73 | $13.00 | $13.20 | $12.50 | $12.00 | $12.00 |
| 29 | Detectable warnings (42400800) | SF | 568 | $47.00 | $44.00 | $25.00 | $40.00 | $40.00 |
| 30 | Pavement rem (44000100) | SY | 30 | $18.00 | $20.00 | $26.50 | $80.00 | $65.00 |
| 31 | HMA surf rem 2 (44000157) | SY | 21,260 | $2.05 | $2.15 | $2.15 | $2.30 | $4.00 |
| 32 | Comb curb gutter rem (44000500) | LF | 194 | $7.00 | $11.00 | $8.00 | $20.00 | $10.00 |
| 33 | Sidewalk rem (44000600) | SF | 4,135 | $1.90 | $3.30 | $1.65 | $3.00 | $3.00 |
| 34 | Median removal (44003100) | SF | 2,512 | $2.50 | $4.40 | $1.10 | $1.00 | $4.00 |
| 35 | CL D patch T1 4 (44201690) | SY | 164 | $42.00 | $38.00 | $46.00 | $30.00 | $45.00 |
| 36 | CL D patch T2 4 (44201692) | SY | 164 | $42.00 | $37.00 | $38.00 | $10.00 | $45.00 |
| 37 | CL D patch T3 4 (44201694) | SY | 328 | $44.00 | $34.00 | $31.00 | $10.00 | $45.00 |
| 38 | CL D patch T4 4 (44201696) | SY | 662 | $44.00 | $34.00 | $20.00 | $10.00 | $45.00 |
| 39 | CL D patch T1 7 (44201725) | SY | 51 | $59.00 | $70.00 | $81.00 | $60.00 | $80.00 |
| 40 | CL D patch T2 7 (44201729) | SY | 51 | $60.00 | $70.00 | $66.00 | $40.00 | $80.00 |
| 41 | CL D patch T3 7 (44201733) | SY | 102 | $67.00 | $63.00 | $54.00 | $40.00 | $80.00 |
| 42 | CL D patch T4 7 (44201735) | SY | 102 | $67.00 | $63.00 | $47.00 | $40.00 | $80.00 |
| 43 | Agg wedge SHLD type B (48102100) | TON | 33 | $51.00 | $65.00 | $45.50 | $110.00 | $92.00 |
| 44 | Storm sew CL A 2 15 (550A0360) | LF | 48 | $90.00 | $275.00 | $245.00 | $245.00 | $245.00 |
| 45 | Storm sewer rem 15 (55100700) | LF | 48 | $40.00 | $55.00 | $50.00 | $50.00 | $50.00 |
| 46 | Man TA 4 dia T1F CL (60218400) | EACH | 1 | $4,300.00 | $10,850 | $9,875.00 | $9,875.00 | $9,875.00 |
| 47 | CB adj new T20F&G (60251710) | EACH | 4 | $800.00 | $1,525.00 | $1,385.00 | $1,385.00 | $1,385.00 |
| 48 | Comb CC&G TB6.12 (60603800) | LF | 14 | $59.00 | $72.00 | $50.25 | $65.00 | $65.00 |
| 49 | Comb CC&G TY B-6.24 (60605000) | LF | 167 | $69.00 | $72.00 | $49.25 | $65.00 | $65.00 |
| 50 | Non SPL waste disposl (66900200) | CY | 25 | $120.00 | $105.00 | $99.00 | $110.00 | $145.00 |
| 51 | Soil disposal analy (66900530) | EACH | 4 | $1,500.00 | $990.00 | $900.00 | $900.00 | $900.00 |
| 52 | Reg sub P-const plan (66901001) | LS | 1 | $4,100.00 | $6,100.00 | $5,600.00 | $5,600.00 | $5,600.00 |
| 53 | Reg sub F con report (66901003) | LS | 1 | $1,500.00 | $550.00 | $500.00 | $500.00 | $500.00 |
| 54 | Reg sub mon (66901006) | CAL DAY | 20 | $1,200.00 | $765.00 | $690.00 | $200.00 | $690.00 |
| 55 | Mobilization (67100100) | LS | 1 | $37,000 | $10,000 | $57,211 | $61,000 | $82,687 |
| 56 | TR cont & prot 701501 (70102620) | LS | 1 | $22,000 | $17,000 | $78,350 | $89,040 | $10,000 |
| 57 | TR cont & prot 701801 (70102640) | LS | 1 | $7,000.00 | $1.00 | $6,840.00 | $3,000.00 | $3,000.00 |
| 58 | Short term pavt mking (70300100) | LF | 777 | $6.00 | $2.00 | $1.00 | $2.00 | $0.01 |
| 59 | SHRT TRM pavt MK rem (70300150) | SF | 259 | $6.00 | $3.00 | $2.00 | $5.00 | $0.01 |
| 60 | Temp PVT MK line 4 - paint (70300221) | LF | 9,576 | $0.60 | $0.50 | $0.40 | $0.30 | $0.30 |
| 61 | Temp PVT MK line 6 - paint (70300241) | LF | 12,883 | $0.85 | $0.77 | $0.60 | $0.55 | $0.55 |
| 62 | Temp PVT MK line 24 - paint (70300281) | LF | 195 | $3.00 | $3.00 | $2.20 | $2.25 | $2.25 |
| 63 | Sign panel T1 (72000100) | SF | 45 | $42.00 | $33.00 | $30.00 | $35.00 | $35.00 |
| 64 | Remov sign panel T1 (72400310) | SF | 15 | $55.00 | $18.00 | $28.00 | $45.00 | $45.00 |
| 65 | Teles STL sin support (72800100) | LF | 150 | $22.00 | $17.00 | $18.00 | $22.00 | $22.00 |
| 66 | THPL PVT MK LTR & sym (78000100) | SF | 314 | $5.80 | $8.25 | $5.00 | $6.00 | $9.00 |
| 67 | THPL PVT MK line 4 (78000200) | LF | 9,576 | $1.00 | $0.86 | $0.99 | $0.85 | $0.77 |
| 68 | THPL PVT MK line 6 (78000400) | LF | 12,883 | $1.60 | $1.24 | $1.53 | $1.30 | $0.92 |
| 69 | THPL PVT MK line 8 (78000500) | LF | 112 | $2.00 | $2.20 | $2.05 | $1.70 | $1.65 |
| 70 | THPL PVT MK line 12 (78000600) | LF | 1,435 | $3.00 | $3.60 | $3.07 | $3.00 | $3.50 |
| 71 | THPL PVT MK line 24 (78000650) | LF | 195 | $6.00 | $8.25 | $6.14 | $6.00 | $6.00 |
| 72 | Raised ref PVT MK rem (78300200) | EACH | 46 | $45.00 | $15.00 | $20.00 | $12.00 | $10.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.