IDOT contract 62V73 bid tabulation

Section FAP. Let by Illinois DOT on April 25, 2025, Cook, District 01. 3 bids received; low bid $991,171 by Plote Construction, Inc..

Owner
Illinois DOT
Letting
25 APR 2025
Pay items
54
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Plote Construction, Inc.$991,171Low
2Builders Paving, LLC$1,035,999+5.0%
3Peter Baker & Son Co.$1,189,358+20%
IDOT contract 62V73: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Plote Construction, Inc.2. Builders Paving, LLC3. Peter Baker & Son Co.
1Tree limb rem 4-10 (X2010100)EACH7$175.00$175.00$175.00
2Tree rem<6 unit flush (X2010108)UNIT43.10$24.00$24.00$24.00
3Tree limb rem over 10 (X2010200)EACH11$250.00$250.00$250.00
4Selective clearing (X2010516)UNIT63.98$355.00$355.00$355.00
5Grading & shap SHLDRS (X2020110)UNIT272$40.00$22.00$60.00
6Prun safety/equip CLR (X2100002)UNIT69.37$260.00$360.00$260.00
7CC&G RMVL repl < = 10 (X4400501)LF30$150.00$150.00$390.95
8SS cleaned 12 (X5537800)LF180$2.50$2.50$2.50
9Centerln rum strip 16 (X6420114)LF14,010$0.30$0.35$0.90
10Engrs FLD ofc TY A D1 (X6700407)CAL MO12$3,200.00$3,000.00$1,000.00
11Temp info signing (X7200061)SF51.40$18.00$18.00$25.00
12HS THPL PM LN 4 (X7800815)LF22,766$0.50$0.55$0.55
13Drainage STR cleaned (Z0018500)EACH6$500.00$500.00$500.00
14Trainees (Z0076600)HR500$0.80$0.80$0.80
15Trainees TPG (Z0076604)HR500$15.00$15.00$15.00
16Tree remov 6-15 (20100110)UNIT240.40$27.00$27.00$27.00
17Tree remov over 15 (20100210)UNIT15.20$36.00$36.00$36.00
18Seeding CL 3 (25000300)ACRE1.47$3,900.00$3,880.00$3,880.00
19Erosion contr blanket (25100630)SY7,109$1.00$1.00$0.99
20Stone riprap CL A3 (28100105)SY5$500.00$500.00$120.00
21Bit matls tack CT (40600290)LB25,618$0.01$0.01$0.01
22Long joint sealant (40600370)LF17,639$2.60$3.00$3.70
23Mix CR JTS flangewys (40600400)TON86$100.00$350.00$75.00
24HMA surf rem butt JT (40600982)SY148$25.00$15.00$1.00
25HMA SC IL-9.5 D N70 (40604062)TON4,782$80.00$66.00$85.00
26Protective coat (42001300)SY36.67$5.00$8.00$0.01
27HMA surf rem 1 1/2 (44000155)SY56,928$3.00$2.75$2.47
28CL D patch T2 15 (44201827)SY300$40.00$170.00$250.00
29CL D patch T3 15 (44201831)SY200$40.00$155.00$230.00
30CL D patch T4 15 (44201833)SY300$40.00$145.00$195.00
31Agg wedge SHLD type B (48102100)TON369$45.00$45.00$68.00
32Pipe culv cleaned 15 (60920015)LF30$10.00$10.00$10.00
33Shoulder rum strip 8 (64200108)LF28,111$0.50$0.25$0.45
34Mobilization (67100100)LS1$50,000$40,000$63,796
35Traf cont-prot 701201 (70100450)LS1$1.00$1.00$100.00
36Traf cont-prot 701306 (70100460)LS1$1.00$40,000$100.00
37TR cont & prot 701501 (70102620)LS1$44,200$1.00$77,145
38TR cont & prot 701502 (70102622)LS1$1.00$1.00$100.00
39TR cont & prot 701602 (70102632)LS1$3,000.00$1.00$100.00
40TR cont & prot 701701 (70102635)LS1$1.00$1.00$100.00
41Short term pavt mking (70300100)LF12,401$0.01$0.01$0.01
42SHRT TRM pavt MK rem (70300150)SF6,200$0.01$0.01$0.01
43Temp PVT MK LTR & sym paint (70300211)SF540$0.01$0.01$0.01
44Temp PVT MK line 4 - paint (70300221)LF184,863$0.01$0.01$0.01
45Temp PVT MK line 12 - paint (70300261)LF1,206$0.01$0.01$0.01
46Temp PVT MK line 24 - paint (70300281)LF224.40$0.01$0.01$0.01
47Temp PVT MK L4 T4 tape (70307120)LF6,201$0.01$0.01$0.01
48THPL PVT MK LTR & sym (78000100)SF180$6.00$5.75$5.75
49THPL PVT MK line 4 (78000200)LF38,855$0.90$0.85$0.85
50THPL PVT MK line 12 (78000600)LF402$3.50$3.35$3.32
51THPL PVT MK line 24 (78000650)LF75$5.75$5.75$5.75
52Raised refl pavt MKR (78100100)EACH646$35.00$35.00$35.00
53Raised ref PVT MK rem (78300200)EACH646$10.00$12.00$10.00
54PVT MKG rem WTR blast (78300202)SF20,759$0.01$1.40$0.01
IDOT contract 62V73: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy