IDOT contract 61L32 bid tabulation
Zion, section 22-00094-00-RS. Let by Illinois DOT on April 25, 2025, Lake, District 01. 2 bids received; low bid $892,838 by Peter Baker & Son Co..
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 50
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Peter Baker & Son Co. | $892,838 | Low |
| 2 | Payne & Dolan, Inc. | $994,994 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Peter Baker & Son Co. | 2. Payne & Dolan, Inc. |
|---|---|---|---|---|---|
| 1 | HMA driveway pavt 3 (X4060280) | SY | 135 | $52.00 | $33.90 |
| 2 | PC conc sidewalk 5 SP (X4240430) | SF | 8,446 | $11.00 | $11.00 |
| 3 | FR & lids adjust SPL (X6030310) | EACH | 22 | $1,350.00 | $1,250.00 |
| 4 | Temp info signing (X7200061) | SF | 120 | $20.00 | $20.00 |
| 5 | Construction layout (Z0013798) | LS | 1 | $4,800.00 | $2,800.00 |
| 6 | Drain util STR adj (Z0017400) | EACH | 17 | $440.00 | $450.00 |
| 7 | Drainage STR reconst (Z0018600) | EACH | 12 | $1,900.00 | $1,850.00 |
| 8 | Temporary fence (20101000) | LF | 400 | $4.00 | $9.50 |
| 9 | Tree root pruning (20101200) | EACH | 5 | $75.00 | $85.00 |
| 10 | Tree prun 1-10 (20101300) | EACH | 5 | $75.00 | $90.00 |
| 11 | Rem & disp uns matl (20201200) | CY | 25 | $37.00 | $76.75 |
| 12 | Topsoil F & P 4 (21101615) | SY | 975 | $6.00 | $5.75 |
| 13 | Sodding salt tolerant (25200110) | SY | 975 | $18.00 | $19.05 |
| 14 | Supple watering (25200200) | UNIT | 52 | $0.01 | $1.00 |
| 15 | Inlet filters (28000510) | EACH | 24 | $198.00 | $465.00 |
| 16 | Agg subgrade improve (30300001) | CY | 25 | $65.00 | $105.00 |
| 17 | Bit matls tack CT (40600290) | LB | 21,727 | $0.01 | $0.01 |
| 18 | Mix CR JTS flangewys (40600400) | TON | 20 | $75.00 | $350.00 |
| 19 | P HMA BC IL-4.75 N50 (40603200) | TON | 1,328 | $110.00 | $113.00 |
| 20 | HMA SC IL-9.5 D N50 (40604060) | TON | 2,704 | $82.00 | $79.00 |
| 21 | Detectable warnings (42400800) | SF | 326 | $40.00 | $40.00 |
| 22 | HMA surf rem 2 (44000157) | SY | 32,187 | $2.80 | $3.30 |
| 23 | Drive pavement rem (44000200) | SY | 135 | $20.00 | $9.30 |
| 24 | Comb curb gutter rem (44000500) | LF | 830 | $10.00 | $10.00 |
| 25 | Sidewalk rem (44000600) | SF | 8,281 | $3.00 | $3.00 |
| 26 | CL D patch T1 6 (44201713) | SY | 120 | $25.00 | $40.00 |
| 27 | CL D patch T2 6 (44201717) | SY | 850 | $25.00 | $40.00 |
| 28 | CL D patch T3 6 (44201721) | SY | 120 | $25.00 | $40.00 |
| 29 | CL D patch T4 6 (44201723) | SY | 120 | $25.00 | $40.00 |
| 30 | FR & grates T3 (60404300) | EACH | 2 | $550.00 | $850.00 |
| 31 | FR & lids T1 OL (60406000) | EACH | 6 | $375.00 | $450.00 |
| 32 | FR & lids T1 CL (60406100) | EACH | 2 | $375.00 | $450.00 |
| 33 | Comb CC&G TB6.12 (60603800) | LF | 830 | $45.00 | $45.00 |
| 34 | Non SPL waste disposl (66900200) | CY | 10 | $110.00 | $67.50 |
| 35 | Soil disposal analy (66900530) | EACH | 1 | $500.00 | $525.00 |
| 36 | Reg sub P-const plan (66901001) | LS | 1 | $4,400.00 | $4,620.00 |
| 37 | Reg sub F con report (66901003) | LS | 1 | $650.00 | $685.00 |
| 38 | Reg sub mon (66901006) | CAL DAY | 5 | $650.00 | $685.00 |
| 39 | Mobilization (67100100) | LS | 1 | $53,406 | $137,034 |
| 40 | TR cont & prot 701501 (70102620) | LS | 1 | $37,488 | $11,625 |
| 41 | TR cont & prot 701701 (70102635) | LS | 1 | $100.00 | $100.00 |
| 42 | TR cont & prot 701801 (70102640) | LS | 1 | $100.00 | $100.00 |
| 43 | Changeable message SN (70107025) | CAL DAY | 50 | $40.00 | $40.00 |
| 44 | Short term pavt mking (70300100) | LF | 1,530 | $1.00 | $2.50 |
| 45 | SHRT TRM pavt MK rem (70300150) | SF | 765 | $0.01 | $2.90 |
| 46 | THPL PVT MK LTR & sym (78000100) | SF | 50 | $5.85 | $5.85 |
| 47 | THPL PVT MK line 4 (78000200) | LF | 4,900 | $0.95 | $0.95 |
| 48 | THPL PVT MK line 6 (78000400) | LF | 935 | $1.50 | $1.50 |
| 49 | THPL PVT MK line 12 (78000600) | LF | 35 | $2.95 | $2.95 |
| 50 | THPL PVT MK line 24 (78000650) | LF | 250 | $5.85 | $5.85 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.