IDOT contract 62V36 bid tabulation
Section FAP. Let by Illinois DOT on April 25, 2025, Cook, District 01. 3 bids received; low bid $5,393,745 by Iroquois Paving Corporation.
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 103
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Iroquois Paving Corporation | $5,393,745 | Low |
| 2 | Gallagher Asphalt Corporation | $5,897,529 | +9.0% |
| 3 | K-Five Construction Corporation | $6,174,220 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Iroquois Paving Corporation | 2. Gallagher Asphalt Corporation | 3. K-Five Construction Corporation |
|---|---|---|---|---|---|---|
| 1 | Tree care (K0026700) | EACH | 6 | $461.00 | $490.50 | $256.02 |
| 2 | Weed cont aquatic (K0029614) | GAL | 2.50 | $3,890.00 | $4,125.00 | $1,433.69 |
| 3 | Weed cont broadlf TRF (K0029629) | LB | 1 | $28,000 | $29,780 | $10,445 |
| 4 | Prun safety/equip CLR (K1004595) | LS | 1 | $8,710.00 | $9,265.00 | $18,208 |
| 5 | Constructn layout SPL (X0320050) | LS | 1 | $24,600 | $22,500 | $50,000 |
| 6 | Weed CNTRL total vegn (X0325896) | GAL | 3 | $5,900.00 | $6,275.00 | $2,252.94 |
| 7 | Rem & rein bric paver (X0327611) | SF | 454 | $50.00 | $43.60 | $10.60 |
| 8 | Ped signal post 10 FT (X1400367) | EACH | 5 | $1,080.00 | $1,190.00 | $1,090.01 |
| 9 | Ped signal post 5 FT (X1400378) | EACH | 25 | $840.00 | $925.00 | $847.97 |
| 10 | Tree limb rem 4-10 (X2010100) | EACH | 2 | $52.00 | $54.50 | $409.63 |
| 11 | Tree remov acres SPL (X2010350) | ACRE | 0.25 | $10,250 | $10,900 | $24,270 |
| 12 | Selective clearing (X2010516) | UNIT | 1 | $360.00 | $381.50 | $1,228.88 |
| 13 | Mowing SPL (X2503110) | ACRE | 5 | $520.00 | $11,236 | $1,228.88 |
| 14 | Interseed CL 4 mod (X2503314) | ACRE | 1.15 | $2,050.00 | $2,180.00 | $2,560.16 |
| 15 | Interseed CL 5 mod (X2503321) | ACRE | 1.15 | $6,400.00 | $6,813.00 | $3,789.04 |
| 16 | Detectable warn SPL (X4240800) | SF | 50 | $47.00 | $27.50 | $47.00 |
| 17 | CC&G RMVL repl < = 10 (X4400501) | LF | 8 | $79.00 | $150.00 | $78.33 |
| 18 | CC&G RMVL repl > 10FT (X4400503) | LF | 3,591 | $54.00 | $50.00 | $52.22 |
| 19 | SS cleaned 12 (X5537800) | LF | 3,000 | $2.05 | $2.20 | $2.07 |
| 20 | FR & lids adjust SPL (X6030310) | EACH | 290 | $0.01 | $1,200.00 | $1,148.78 |
| 21 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $3,000.00 | $3,500.00 | $3,000.00 |
| 22 | Temp info signing (X7200061) | SF | 825 | $20.50 | $18.50 | $20.48 |
| 23 | Accessible ped signal (X8760200) | EACH | 78 | $1,830.00 | $2,015.00 | $1,845.88 |
| 24 | Conc FDN TY A 12D (X8780012) | LF | 168 | $345.00 | $358.00 | $327.35 |
| 25 | Drainage STR cleaned (Z0018500) | EACH | 250 | $325.00 | $343.00 | $325.77 |
| 26 | RE-optimize TR sig sys 1 (Z0033044) | EACH | 12 | $590.00 | $650.00 | $595.70 |
| 27 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 | $0.80 |
| 28 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 |
| 29 | Tree prun 1-10 (20101300) | EACH | 15 | $52.00 | $54.50 | $153.62 |
| 30 | Tree prun over 10 (20101350) | EACH | 20 | $52.00 | $54.50 | $194.57 |
| 31 | Supple watering (20101700) | UNIT | 1 | $1.00 | $1.10 | $40.00 |
| 32 | Earth excavation (20200100) | CY | 365 | $82.00 | $66.00 | $81.93 |
| 33 | Topsoil F & P 4 (21101615) | SY | 1,265 | $10.50 | $11.10 | $8.86 |
| 34 | Seeding CL 2A (25000210) | ACRE | 0.25 | $3,075.00 | $3,270.00 | $5,161.29 |
| 35 | Nitrogen fert nutr (25000400) | LB | 23 | $4.00 | $4.15 | $5.12 |
| 36 | Potassium fert nutr (25000600) | LB | 23 | $4.00 | $4.15 | $5.12 |
| 37 | Erosion contr blanket (25100630) | SY | 1,210 | $1.50 | $1.60 | $1.43 |
| 38 | Sodding salt tolerant (25200110) | SY | 54 | $31.00 | $32.70 | $81.93 |
| 39 | Bit matls tack CT (40600290) | LB | 70,390 | $0.01 | $0.01 | $0.50 |
| 40 | Long joint sealant (40600370) | LF | 119,834 | $2.60 | $2.86 | $2.91 |
| 41 | Mix CR JTS flangewys (40600400) | TON | 283 | $0.01 | $100.00 | $50.00 |
| 42 | HMA surf rem butt JT (40600982) | SY | 1,266 | $0.01 | $18.00 | $14.65 |
| 43 | HMA repl over patch (40601005) | TON | 187 | $200.00 | $325.00 | $479.96 |
| 44 | P HMA SC SMA 9.5 F N80 (40605026) | TON | 16,596 | $123.00 | $118.00 | $134.65 |
| 45 | Protective coat (42101300) | SY | 3,411 | $0.01 | $0.01 | $1.00 |
| 46 | PC conc sidewalk 5 (42400200) | SF | 23,501 | $7.25 | $8.20 | $6.72 |
| 47 | Detectable warnings (42400800) | SF | 1,560 | $41.00 | $27.50 | $41.37 |
| 48 | HMA surf rem 1 3/4 (44000156) | SY | 164,449 | $3.40 | $2.25 | $3.50 |
| 49 | Sidewalk rem (44000600) | SF | 22,638 | $2.55 | $3.10 | $2.59 |
| 50 | HMA RM OV patch 3 1/4 (44002213) | SY | 4,150 | $0.01 | $0.01 | $0.01 |
| 51 | CL D patch T1 9 (44201749) | SY | 550 | $35.00 | $155.00 | $40.00 |
| 52 | CL D patch T2 9 (44201753) | SY | 1,100 | $35.00 | $128.00 | $40.00 |
| 53 | CL D patch T3 9 (44201757) | SY | 1,300 | $35.00 | $108.00 | $40.00 |
| 54 | CL D patch T4 9 (44201759) | SY | 1,200 | $35.00 | $90.00 | $40.00 |
| 55 | CB adjust (60250200) | EACH | 5 | $520.00 | $545.00 | $517.10 |
| 56 | CB reconst (60252800) | EACH | 5 | $2,565.00 | $2,725.00 | $2,585.51 |
| 57 | Man adjust (60255500) | EACH | 8 | $820.00 | $872.00 | $827.36 |
| 58 | Man reconst (60257900) | EACH | 5 | $2,565.00 | $2,725.00 | $2,585.51 |
| 59 | VV adjust (60265700) | EACH | 16 | $820.00 | $872.00 | $827.36 |
| 60 | Valve box adj (60266600) | EACH | 18 | $310.00 | $327.00 | $310.26 |
| 61 | FR & grates adjust (60300105) | EACH | 3 | $565.00 | $600.00 | $568.81 |
| 62 | FR & lids T1 OL (60406000) | EACH | 8 | $465.00 | $490.00 | $465.39 |
| 63 | FR & lids T1 CL (60406100) | EACH | 8 | $515.00 | $545.00 | $517.10 |
| 64 | Non SPL waste disposl (66900200) | CY | 365 | $135.00 | $98.00 | $80.00 |
| 65 | Soil disposal analy (66900530) | EACH | 10 | $1,485.00 | $1,118.00 | $1,536.17 |
| 66 | Reg sub P-const plan (66901001) | LS | 1 | $3,075.00 | $6,976.00 | $3,284.24 |
| 67 | Reg sub F con report (66901003) | LS | 1 | $2,970.00 | $545.00 | $1,271.31 |
| 68 | Reg sub mon (66901006) | CAL DAY | 45 | $1,015.00 | $763.00 | $720.42 |
| 69 | Mobilization (67100100) | LS | 1 | $323,500 | $310,000 | $365,000 |
| 70 | TR cont & prot 701606 (70102625) | LS | 1 | $169,000 | $7,630.00 | $200,000 |
| 71 | TR cont & prot 701601 (70102630) | LS | 1 | $1.00 | $10,900 | $1.00 |
| 72 | TR cont & prot 701602 (70102632) | LS | 1 | $1.00 | $10,900 | $1.00 |
| 73 | TR cont & prot 701611 (70102634) | LS | 1 | $1.00 | $817.00 | $1.00 |
| 74 | TR cont & prot 701701 (70102635) | LS | 1 | $1.00 | $10,900 | $1.00 |
| 75 | TR cont & prot 701801 (70102640) | LS | 1 | $1.02 | $10,900 | $1.00 |
| 76 | Short term pavt mking (70300100) | LF | 201,613 | $0.01 | $0.01 | $0.01 |
| 77 | SHRT TRM pavt MK rem (70300150) | SF | 33,602 | $0.01 | $0.01 | $0.01 |
| 78 | Temp PVT MK LTR & sym paint (70300211) | SF | 8,019 | $0.01 | $0.01 | $0.01 |
| 79 | Temp PVT MK line 4 - paint (70300221) | LF | 199,086 | $0.01 | $0.01 | $0.01 |
| 80 | Temp PVT MK line 6 - paint (70300241) | LF | 24,498 | $0.01 | $0.01 | $0.01 |
| 81 | Temp PVT MK line 8 - paint (70300251) | LF | 423 | $0.01 | $0.01 | $0.01 |
| 82 | Temp PVT MK line 12 - paint (70300261) | LF | 29,817 | $0.01 | $0.01 | $0.01 |
| 83 | Temp PVT MK line 24 - paint (70300281) | LF | 6,615 | $0.01 | $0.01 | $0.01 |
| 84 | THPL PVT MK LTR & sym (78000100) | SF | 2,673 | $5.65 | $7.20 | $6.69 |
| 85 | THPL PVT MK line 4 (78000200) | LF | 66,362 | $0.70 | $0.99 | $0.91 |
| 86 | THPL PVT MK line 6 (78000400) | LF | 8,166 | $0.90 | $1.20 | $1.12 |
| 87 | THPL PVT MK line 8 (78000500) | LF | 141 | $1.20 | $2.40 | $2.23 |
| 88 | THPL PVT MK line 12 (78000600) | LF | 9,939 | $2.50 | $3.60 | $3.37 |
| 89 | THPL PVT MK line 24 (78000650) | LF | 2,205 | $5.65 | $6.75 | $6.29 |
| 90 | Raised refl pavt MKR (78100100) | EACH | 2,341 | $40.00 | $36.60 | $34.01 |
| 91 | Raised ref PVT MK rem (78300200) | EACH | 2,341 | $0.01 | $0.01 | $10.60 |
| 92 | Undrgrd C galvs 2 (81028200) | LF | 485 | $85.00 | $93.50 | $85.62 |
| 93 | Main EX TR sig instal (85000200) | EACH | 12 | $2,015.00 | $2,220.00 | $2,034.10 |
| 94 | Elcbl C signal 14 2C (87301215) | LF | 6,600 | $5.75 | $6.40 | $5.79 |
| 95 | Elcbl C signal 14 3C (87301225) | LF | 716 | $6.00 | $6.50 | $5.97 |
| 96 | Elcbl C egrdc 6 1C (87301900) | LF | 975 | $6.40 | $7.00 | $6.44 |
| 97 | Drill EX handhole (87900200) | EACH | 31 | $415.00 | $453.00 | $415.58 |
| 98 | Det loop T1 (88600100) | LF | 7,115 | $26.00 | $28.70 | $26.24 |
| 99 | Reloc EX ped sig head (89500200) | EACH | 7 | $430.00 | $472.00 | $432.39 |
| 100 | Reloc EX TS equip (89501250) | EACH | 1 | $380.00 | $419.00 | $383.40 |
| 101 | Mod EX contr (89502200) | EACH | 1 | $1,245.00 | $1,372.00 | $1,256.54 |
| 102 | Remov EX TS equip (89502375) | EACH | 12 | $180.00 | $195.00 | $178.31 |
| 103 | Rebuild EX handhole (89502376) | EACH | 23 | $2,300.00 | $2,533.00 | $2,375.80 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.