IDOT contract 61K44 bid tabulation
Project Number: L7Md-600 / /, section 20-F3000-06-BT. Let by Illinois DOT on April 25, 2025, Will, District 01. 2 bids received; low bid $3,654,428 by D. Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 92
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | D. Construction, Inc. | $3,654,428 | Low |
| 2 | Herlihy Mid-Continent Company | $4,913,365 | +34% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. D. Construction, Inc. | 2. Herlihy Mid-Continent Company |
|---|---|---|---|---|---|
| 1 | T-quercus bicol 1-1/2 (A2006512) | EACH | 10 | $880.00 | $450.00 |
| 2 | T-quercus rubra 1-1/2 (A2007112) | EACH | 10 | $880.00 | $450.00 |
| 3 | Temporary seeding (K1005418) | ACRE | 3.50 | $110.00 | $1,200.00 |
| 4 | Seeding SPL (K1005421) | ACRE | 0.75 | $4,950.00 | $4,500.00 |
| 5 | Limestone SCRN surf 2 (XX007606) | SY | 2,096 | $4.10 | $8.55 |
| 6 | Boardwalk structure (XX008287) | SF | 11,969 | $145.00 | $165.00 |
| 7 | Install sign (XX008864) | EACH | 2 | $1,350.00 | $1,500.00 |
| 8 | Tree root pruning SPL (XX009531) | LF | 500 | $27.50 | $5.00 |
| 9 | Ped truss superstr (X0322508) | SF | 1,800 | $216.00 | $245.00 |
| 10 | Washout basin (X0326806) | LS | 1 | $2,000.00 | $3,500.00 |
| 11 | Trash receptacles (X0327997) | EACH | 2 | $800.00 | $2,845.00 |
| 12 | High vis temp fence (X2011001) | LF | 1,150 | $3.30 | $7.63 |
| 13 | Turf reinf mat SPL (X2510900) | SY | 356 | $13.20 | $45.00 |
| 14 | Eros cont blanket SPL (X2511630) | SY | 13,324 | $1.54 | $2.10 |
| 15 | Fence removal (X6640104) | LF | 31 | $11.44 | $10.40 |
| 16 | Rustic rail fence (X6640624) | LF | 192 | $67.28 | $61.16 |
| 17 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $5,000.00 | $5,350.00 |
| 18 | Traf cont & prot SPL (X7010216) | LS | 1 | $0.01 | $151,129 |
| 19 | Stab constr entrance (Z0013797) | SY | 190 | $0.01 | $54.00 |
| 20 | Construction layout (Z0013798) | LS | 1 | $47,400 | $286,823 |
| 21 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 |
| 22 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 |
| 23 | Tree remov 6-15 (20100110) | UNIT | 746 | $27.50 | $24.00 |
| 24 | Tree remov over 15 (20100210) | UNIT | 542 | $38.50 | $34.00 |
| 25 | Temporary fence (20101000) | LF | 170 | $8.80 | $6.00 |
| 26 | Tree prun 1-10 (20101300) | EACH | 35 | $27.50 | $85.00 |
| 27 | Tree prun over 10 (20101350) | EACH | 35 | $110.00 | $200.00 |
| 28 | Earth excavation (20200100) | CY | 1,140 | $35.00 | $49.00 |
| 29 | Rem & disp uns matl (20201200) | CY | 860 | $35.00 | $53.00 |
| 30 | Furnished excavation (20400800) | CY | 3,940 | $30.00 | $58.00 |
| 31 | Geotech fab F/GR stab (21001000) | SY | 3,938 | $3.50 | $3.40 |
| 32 | Topsoil exc & plac (21101505) | CY | 5,134 | $22.00 | $27.00 |
| 33 | Topsoil F & P var DP (21101600) | SY | 130 | $7.70 | $10.00 |
| 34 | Topsoil F & P 6 (21101625) | SY | 5,910 | $6.60 | $7.25 |
| 35 | Seeding CL 1B (25000115) | ACRE | 0.25 | $2,750.00 | $3,200.00 |
| 36 | Seeding CL 4 (25000310) | ACRE | 2.25 | $2,530.00 | $2,900.00 |
| 37 | Seeding CL 5B (25000324) | ACRE | 0.25 | $2,750.00 | $5,100.00 |
| 38 | Mowing (25000750) | ACRE | 1 | $550.00 | $500.00 |
| 39 | Supple watering (25200200) | UNIT | 25 | $102.30 | $100.00 |
| 40 | Temp ditch checks (28000305) | LF | 128 | $11.00 | $15.00 |
| 41 | Perimeter eros bar (28000400) | LF | 7,178 | $3.03 | $2.75 |
| 42 | Stone riprap CL A4 (28100107) | SY | 298 | $80.00 | $134.00 |
| 43 | Stone dump rip CL A3 (28100705) | SY | 42 | $100.00 | $126.00 |
| 44 | Filter fabric (28200200) | SY | 340 | $6.00 | $25.00 |
| 45 | Agg subgrade improve (30300001) | CY | 860 | $55.00 | $61.00 |
| 46 | Agg base cse B 4 (35101600) | SY | 24 | $10.00 | $25.00 |
| 47 | Agg base cse B 8 (35102000) | SY | 6,547 | $13.00 | $25.00 |
| 48 | Bit matls PR CT (40600275) | LB | 9,175 | $0.01 | $0.01 |
| 49 | Bit matls tack CT (40600290) | LB | 1,835 | $0.01 | $0.01 |
| 50 | HMA surf rem butt JT (40600982) | SY | 168 | $0.01 | $30.00 |
| 51 | HMA BC IL-19.0 N50 (40603080) | TON | 431 | $90.00 | $142.00 |
| 52 | HMA SC IL-9.5 D N50 (40604060) | TON | 372 | $92.00 | $157.00 |
| 53 | PC conc sidewalk 6 (42400300) | SF | 200 | $12.00 | $30.00 |
| 54 | Detectable warnings (42400800) | SF | 40 | $40.00 | $85.00 |
| 55 | CL D patch T1 4 (44201690) | SY | 100 | $40.00 | $70.00 |
| 56 | CL D patch T2 4 (44201692) | SY | 100 | $40.00 | $60.00 |
| 57 | CL D patch T3 4 (44201694) | SY | 100 | $40.00 | $50.00 |
| 58 | CL D patch T4 4 (44201696) | SY | 100 | $40.00 | $40.00 |
| 59 | Structure excavation (50200100) | CY | 487 | $38.00 | $51.50 |
| 60 | Conc struct (50300225) | CY | 21.80 | $1,600.00 | $3,500.00 |
| 61 | Protective coat (50300300) | SY | 229 | $2.00 | $5.00 |
| 62 | Conc supstr app slab (50301350) | CY | 21.20 | $600.00 | $1,750.00 |
| 63 | Reinf bars, epoxy CTD (50800205) | LB | 6,100 | $2.25 | $2.01 |
| 64 | Fur M S pile 16X0.312 (51200961) | LF | 184 | $168.00 | $67.20 |
| 65 | Driving piles (51202305) | LF | 184 | $0.01 | $1.00 |
| 66 | Test pile met shells (51203200) | EACH | 2 | $6,000.00 | $25,000 |
| 67 | Name plates (51500100) | EACH | 1 | $1,000.00 | $1,500.00 |
| 68 | Pref JT strip seal (52000110) | LF | 26 | $280.00 | $285.00 |
| 69 | P cul CL A 1 12 (542A0217) | LF | 14 | $100.00 | $256.00 |
| 70 | P cul CL A 1 15 (542A0220) | LF | 87 | $100.00 | $258.00 |
| 71 | P cul CL A 1 24 (542A0229) | LF | 18 | $125.00 | $286.00 |
| 72 | PRC flar end sec 12 (54213657) | EACH | 2 | $1,000.00 | $1,549.00 |
| 73 | PRC flar end sec 15 (54213660) | EACH | 10 | $1,250.00 | $1,643.00 |
| 74 | PRC flar end sec 24 (54213669) | EACH | 2 | $1,500.00 | $1,974.00 |
| 75 | Granular backfill STR (58600101) | CY | 38 | $60.00 | $137.00 |
| 76 | Concrete sealer (58700300) | SF | 169 | $2.00 | $4.00 |
| 77 | Geocomposite wall DR (59100100) | SY | 34 | $50.00 | $30.00 |
| 78 | P undr for struct 4 (60146304) | LF | 70 | $30.00 | $43.25 |
| 79 | Conc curb TB (60600605) | LF | 31 | $50.00 | $75.00 |
| 80 | Non SPL waste disposl (66900200) | CY | 2,380 | $90.00 | $87.00 |
| 81 | Soil disposal analy (66900530) | EACH | 2 | $1,925.00 | $400.00 |
| 82 | Reg sub P-const plan (66901001) | LS | 1 | $2,475.00 | $4,900.00 |
| 83 | Reg sub F con report (66901003) | LS | 1 | $2,475.00 | $500.00 |
| 84 | Reg sub mon (66901006) | CAL DAY | 20 | $990.00 | $750.00 |
| 85 | Mobilization (67100100) | LS | 1 | $206,854 | $294,900 |
| 86 | Sign panel T1 (72000100) | SF | 57.50 | $27.50 | $28.00 |
| 87 | Remov sin pan assy TA (72400100) | EACH | 2 | $82.50 | $500.00 |
| 88 | Reloc sin pan assy TA (72400500) | EACH | 1 | $302.50 | $1,100.00 |
| 89 | Metal post TY A (72900100) | LF | 188 | $16.50 | $18.00 |
| 90 | Wood sin support (73000100) | LF | 69 | $27.50 | $30.00 |
| 91 | THPL PVT MK LTR & sym (78000100) | SF | 64 | $30.25 | $10.00 |
| 92 | Paint PVT MK line 4 (78001110) | LF | 2,937 | $0.83 | $2.25 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.