IDOT contract 97857 bid tabulation
Project Number: Hll1-832 / /, section 20-00097-00-RS. Let by Illinois DOT on April 25, 2025, Washington, District 08. 3 bids received; low bid $773,798 by E. T. Simonds Construction Company.
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 25
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E. T. Simonds Construction Company | $773,798 | Low |
| 2 | Samron Midwest Contracting, Inc. | $839,915 | +9.0% |
| 3 | The Kilian Corporation | $936,454 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E. T. Simonds Construction Company | 2. Samron Midwest Contracting, Inc. | 3. The Kilian Corporation |
|---|---|---|---|---|---|---|
| 1 | Centerln rum strip 8 (X6420112) | LF | 3,999 | $3.72 | $1.00 | $1.50 |
| 2 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 | $0.80 |
| 3 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 |
| 4 | Sub gran mat A 6 (31100500) | SY | 1,418 | $13.20 | $12.00 | $20.50 |
| 5 | Aggregate-temp access (40201000) | TON | 50 | $82.50 | $40.00 | $32.00 |
| 6 | Bit matls tack CT (40600290) | LB | 15,004 | $0.01 | $0.01 | $1.10 |
| 7 | Long joint sealant (40600370) | LF | 10,950 | $3.68 | $3.65 | $3.20 |
| 8 | Matl transfer device (40600405) | TON | 3,268 | $3.20 | $1.70 | $4.00 |
| 9 | Temporary ramp (40600990) | SY | 265 | $24.39 | $15.00 | $0.01 |
| 10 | HMA SC IL-9.5 C N50 (40604050) | TON | 3,268 | $89.23 | $96.00 | $119.00 |
| 11 | HMA surf rem 1 3/4 (44000156) | SY | 33,343 | $2.04 | $1.65 | $2.25 |
| 12 | CL C patch T4 8 (44201335) | SY | 1,418 | $136.40 | $195.00 | $180.00 |
| 13 | Shoulder rum strip 8 (64200108) | LF | 7,332 | $0.70 | $0.75 | $1.28 |
| 14 | Mobilization (67100100) | LS | 1 | $48,738 | $49,500 | $20,325 |
| 15 | Traf cont-prot 701201 (70100450) | LS | 1 | $0.01 | $4,100.00 | $28,000 |
| 16 | Traf cont-prot 701306 (70100460) | LS | 1 | $18,018 | $9,300.00 | $6,850.00 |
| 17 | Short term pavt mking (70300100) | LF | 960 | $0.84 | $4.15 | $3.50 |
| 18 | SHRT TRM pavt MK rem (70300150) | SF | 320 | $7.47 | $12.00 | $7.50 |
| 19 | Temp PVT MK LTR & sym paint (70300211) | SF | 47 | $0.01 | $0.01 | $0.01 |
| 20 | Temp PVT MK line 6 - paint (70300241) | LF | 30,939 | $0.01 | $0.01 | $0.01 |
| 21 | THPL PVT MK LTR & sym (78000100) | SF | 47 | $4.40 | $4.10 | $4.10 |
| 22 | THPL PVT MK line 6 (78000400) | LF | 30,939 | $1.12 | $1.03 | $1.05 |
| 23 | Raised refl pavt MKR (78100100) | EACH | 50 | $100.10 | $91.00 | $93.00 |
| 24 | Raised ref PVT MK rem (78300200) | EACH | 50 | $47.21 | $16.00 | $0.01 |
| 25 | PVT MKG rem WTR blast (78300202) | SF | 15,470 | $0.01 | $0.01 | $0.01 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.