IDOT contract 76L49 bid tabulation
Section 110Q. Let by Illinois DOT on April 25, 2025, St.Clair, District 08. 1 bid received; low bid $104,126 by DMS Contracting, Inc..
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 18
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | DMS Contracting, Inc. | $104,126 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. DMS Contracting, Inc. |
|---|---|---|---|---|
| 1 | Bit surf treatmnt A2 (X1500005) | SY | 6,602 | $5.75 |
| 2 | Bit matls FS (X4060107) | LB | 2,641 | $2.30 |
| 3 | RR prot liability ins (Z0048665) | LS | 1 | $4,900.00 |
| 4 | Mobilization (67100100) | LS | 1 | $8,200.00 |
| 5 | Traf cont-prot 701201 (70100450) | LS | 1 | $5,200.00 |
| 6 | Traf cont-prot 701306 (70100460) | LS | 1 | $4,400.00 |
| 7 | TR cont & prot 701501 (70102620) | LS | 1 | $5,500.00 |
| 8 | Short term pavt mking (70300100) | LF | 510 | $0.01 |
| 9 | SHRT TRM pavt MK rem (70300150) | SF | 171 | $0.01 |
| 10 | Temp PVT MK LTR & sym paint (70300211) | SF | 124 | $17.70 |
| 11 | Temp PVT MK line 6 - paint (70300241) | LF | 7,524 | $0.75 |
| 12 | Temp PVT MK line 8 - paint (70300251) | LF | 340 | $4.10 |
| 13 | Temp PVT MK line 24 - paint (70300281) | LF | 36 | $17.70 |
| 14 | PT PVT MK LTRS & symb (78001100) | SF | 124 | $20.50 |
| 15 | Paint PVT MK line 6 (78001130) | LF | 7,524 | $0.95 |
| 16 | Paint PVT MK line 8 (78001140) | LF | 340 | $8.20 |
| 17 | Paint PVT MK line 24 (78001180) | LF | 36 | $20.50 |
| 18 | PVT MKG rem WTR blast (78300202) | SF | 2,933 | $3.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.