IDOT contract 62V35 bid tabulation
Section FAP. Let by Illinois DOT on April 25, 2025, Will, District 01. 5 bids received; low bid $731,556 by Builders Paving, LLC.
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 52
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Builders Paving, LLC | $731,556 | Low |
| 2 | D. Construction, Inc. | $799,007 | +9.0% |
| 3 | Gallagher Asphalt Corporation | $828,270 | +13% |
| 4 | P. T. Ferro Construction Co. | $859,711 | +18% |
| 5 | Austin Tyler Construction, Inc. | $871,264 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Builders Paving, LLC | 2. D. Construction, Inc. | 3. Gallagher Asphalt Corporation | 4. P. T. Ferro Construction Co. | 5. Austin Tyler Construction, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Grading & shap SHLDRS (X2020110) | UNIT | 67 | $40.00 | $25.00 | $82.00 | $55.00 | $160.00 |
| 2 | SS cleaned 12 (X5537800) | LF | 60 | $30.00 | $15.00 | $8.00 | $8.00 | $30.00 |
| 3 | FR & lids adjust SPL (X6030310) | EACH | 3 | $1,500.00 | $900.00 | $1,300.00 | $1,000.00 | $1,500.00 |
| 4 | Centerln rum strip 16 (X6420114) | LF | 3,623 | $1.30 | $0.97 | $1.10 | $1.50 | $1.10 |
| 5 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 6 | $2,750.00 | $4,000.00 | $500.00 | $1,000.00 | $4,000.00 |
| 6 | Temp info signing (X7200061) | SF | 51.40 | $20.00 | $25.00 | $18.00 | $20.00 | $18.00 |
| 7 | HS THPL PM LN 4 (X7800815) | LF | 8,958 | $0.75 | $0.83 | $0.75 | $0.75 | $0.75 |
| 8 | Vid veh det sys SN AP (X8891009) | EACH | 1 | $14,144 | $15,558 | $16,000 | $14,144 | $14,144 |
| 9 | Drainage STR cleaned (Z0018500) | EACH | 1 | $1,200.00 | $400.00 | $2,000.00 | $2,000.00 | $1,200.00 |
| 10 | Bit matls tack CT (40600290) | LB | 10,842 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 11 | Long joint sealant (40600370) | LF | 11,822 | $2.75 | $3.02 | $2.90 | $3.50 | $3.20 |
| 12 | Mix CR JTS flangewys (40600400) | TON | 37 | $450.00 | $0.01 | $50.00 | $0.01 | $300.00 |
| 13 | HMA surf rem butt JT (40600982) | SY | 87 | $5.00 | $15.00 | $20.00 | $0.01 | $0.01 |
| 14 | P HMA SC SMA 9.5 F N80 (40605026) | TON | 2,362 | $108.50 | $108.00 | $138.00 | $125.00 | $120.00 |
| 15 | HMA surf rem 1 3/4 (44000156) | SY | 24,093 | $4.25 | $1.50 | $3.20 | $3.00 | $2.00 |
| 16 | CL D patch T2 11 (44201777) | SY | 964 | $50.00 | $105.00 | $78.00 | $30.00 | $100.00 |
| 17 | CL D patch T3 11 (44201781) | SY | 723 | $45.00 | $105.00 | $72.00 | $40.00 | $100.00 |
| 18 | CL D patch T4 11 (44201783) | SY | 603 | $40.00 | $100.00 | $62.00 | $40.00 | $100.00 |
| 19 | Agg wedge SHLD type B (48102100) | TON | 106 | $55.00 | $30.00 | $90.00 | $45.00 | $75.00 |
| 20 | TR bar TRM T1 SPL tan (63100167) | EACH | 2 | $4,383.50 | $4,821.85 | $4,400.00 | $4,383.50 | $7,300.00 |
| 21 | Guardrail remov (63200310) | LF | 50 | $9.40 | $10.34 | $9.50 | $30.00 | $20.00 |
| 22 | Shoulder rum strip 8 (64200108) | LF | 6,620 | $0.80 | $0.63 | $0.75 | $0.95 | $0.95 |
| 23 | Mobilization (67100100) | LS | 1 | $52,381 | $29,000 | $49,000 | $45,000 | $53,000 |
| 24 | Traf cont-prot 701421 (70100310) | LS | 1 | $9,000.00 | $55,475 | $4,000.00 | $100.00 | $1.00 |
| 25 | Traf cont-prot 701422 (70100320) | LS | 1 | $1,000.00 | $0.01 | $4,000.00 | $100.00 | $1.00 |
| 26 | TR cont & prot 701606 (70102625) | LS | 1 | $500.00 | $0.01 | $38,500 | $185,000 | $40,000 |
| 27 | TR cont & prot 701601 (70102630) | LS | 1 | $500.00 | $0.01 | $4,000.00 | $100.00 | $1.00 |
| 28 | TR cont & prot 701611 (70102634) | LS | 1 | $500.00 | $0.01 | $4,000.00 | $100.00 | $1.00 |
| 29 | TR cont & prot 701701 (70102635) | LS | 1 | $500.00 | $0.01 | $4,000.00 | $100.00 | $1.00 |
| 30 | Short term pavt mking (70300100) | LF | 14,378 | $1.00 | $0.01 | $0.01 | $0.01 | $0.01 |
| 31 | SHRT TRM pavt MK rem (70300150) | SF | 4,793 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 32 | Temp PVT MK LTR & sym paint (70300211) | SF | 116 | $1.50 | $0.01 | $0.01 | $1.35 | $5.00 |
| 33 | Temp PVT MK line 4 - paint (70300221) | LF | 17,661 | $0.25 | $0.01 | $0.01 | $0.45 | $0.30 |
| 34 | Temp PVT MK line 6 - paint (70300241) | LF | 570 | $0.40 | $0.01 | $0.01 | $0.70 | $0.45 |
| 35 | Temp PVT MK line 8 - paint (70300251) | LF | 128 | $0.55 | $0.01 | $0.01 | $0.90 | $0.60 |
| 36 | Temp PVT MK line 12 - paint (70300261) | LF | 484 | $0.80 | $0.01 | $0.01 | $1.35 | $0.90 |
| 37 | Temp PVT MK line 24 - paint (70300281) | LF | 113 | $1.60 | $0.01 | $0.01 | $2.70 | $1.80 |
| 38 | Terminal marker - DA (72501000) | EACH | 2 | $50.00 | $55.00 | $50.00 | $50.00 | $50.00 |
| 39 | THPL PVT MK LTR & sym (78000100) | SF | 113 | $5.75 | $6.33 | $5.75 | $5.75 | $5.75 |
| 40 | THPL PVT MK line 4 (78000200) | LF | 17,667 | $0.80 | $0.88 | $0.80 | $0.80 | $0.80 |
| 41 | THPL PVT MK line 6 (78000400) | LF | 570 | $0.95 | $1.05 | $0.95 | $0.95 | $0.95 |
| 42 | THPL PVT MK line 8 (78000500) | LF | 128 | $1.95 | $2.15 | $1.95 | $1.95 | $1.95 |
| 43 | THPL PVT MK line 12 (78000600) | LF | 484 | $3.32 | $3.65 | $3.35 | $3.32 | $3.32 |
| 44 | THPL PVT MK line 24 (78000650) | LF | 113 | $5.75 | $6.33 | $5.75 | $5.75 | $5.75 |
| 45 | Raised refl pavt MKR (78100100) | EACH | 378 | $38.00 | $41.80 | $38.00 | $38.00 | $38.00 |
| 46 | Raised ref PVT MK rem (78300200) | EACH | 378 | $15.00 | $6.00 | $0.01 | $0.01 | $15.00 |
| 47 | PVT MKG rem WTR blast (78300202) | SF | 6,599 | $1.00 | $2.75 | $0.01 | $2.50 | $1.50 |
| 48 | Main EX TR sig instal (85000200) | EACH | 1 | $2,000.00 | $2,200.00 | $2,200.00 | $2,000.00 | $2,000.00 |
| 49 | Elcbl C lead 14 1PR (87301305) | LF | 765 | $3.00 | $3.30 | $3.00 | $3.00 | $3.00 |
| 50 | Inductive loop detect (88500100) | EACH | 2 | $1,000.00 | $1,100.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 51 | Det loop T1 (88600100) | LF | 272 | $30.00 | $33.00 | $30.00 | $30.00 | $30.00 |
| 52 | Rem elcbl FR con (89502300) | LF | 280 | $5.00 | $5.50 | $5.00 | $5.00 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.