IDOT contract 66M99 bid tabulation
Section (26,26A)RS,SW. Let by Illinois DOT on April 25, 2025, Livingston, District 03. 2 bids received; low bid $2,667,505 by Iroquois Paving Corporation.
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 76
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Iroquois Paving Corporation | $2,667,505 | Low |
| 2 | Kankakee Valley Construction Company, Inc. | $3,296,808 | +24% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Iroquois Paving Corporation | 2. Kankakee Valley Construction Company, Inc. |
|---|---|---|---|---|---|
| 1 | Constructn layout SPL (X0320050) | LS | 1 | $30,000 | $6,000.00 |
| 2 | Furnished excav SPL (X2040805) | CY | 165 | $48.00 | $116.00 |
| 3 | HMA surf rem var DP (X4401198) | SY | 9,845 | $0.01 | $9.40 |
| 4 | Remov EX flar end sec (X5427602) | EACH | 2 | $525.00 | $211.00 |
| 5 | FR & lids adjust SPL (X6030310) | EACH | 7 | $1,450.00 | $1,700.00 |
| 6 | Reset grate (X6040173) | EACH | 1 | $1,000.00 | $190.00 |
| 7 | Temp info signing (X7200061) | SF | 42 | $36.00 | $30.00 |
| 8 | Conc curb repair (Z0012500) | LF | 52 | $165.00 | $64.75 |
| 9 | Earth excavation (20200100) | CY | 65 | $255.00 | $38.00 |
| 10 | Trench backfill (20800150) | CY | 25 | $48.50 | $47.00 |
| 11 | Grading & shap ditch (21400100) | LF | 150 | $20.00 | $18.00 |
| 12 | Seeding CL 2A (25000210) | ACRE | 0.25 | $10,300 | $4,000.00 |
| 13 | Nitrogen fert nutr (25000400) | LB | 22.50 | $10.00 | $6.00 |
| 14 | Phosphorus fert nutr (25000500) | LB | 22.50 | $10.00 | $6.00 |
| 15 | Potassium fert nutr (25000600) | LB | 22.50 | $10.00 | $6.00 |
| 16 | Erosion contr blanket (25100630) | SY | 136 | $5.50 | $3.50 |
| 17 | Stone riprap CL A4 (28100107) | SY | 24 | $185.00 | $103.00 |
| 18 | Filter fabric (28200200) | SY | 24 | $12.00 | $4.10 |
| 19 | Agg surf course TY B (40200800) | TON | 2 | $0.01 | $166.00 |
| 20 | Bit matls tack CT (40600290) | LB | 55,782 | $0.01 | $0.01 |
| 21 | Long joint sealant (40600370) | LF | 63,946 | $0.01 | $2.50 |
| 22 | Mix CR JTS flangewys (40600400) | TON | 23 | $0.01 | $307.00 |
| 23 | Matl transfer device (40600405) | TON | 10,647 | $2.25 | $11.00 |
| 24 | HMA BC HM N50 (40600900) | TON | 38 | $0.01 | $307.00 |
| 25 | Temporary ramp (40600990) | SY | 3,338 | $0.01 | $0.01 |
| 26 | P HMA BC IL-4.75 N50 (40603200) | TON | 4,259 | $105.00 | $133.00 |
| 27 | P HMA SC IL-9.5 D N70 (40604162) | TON | 6,388 | $90.00 | $105.50 |
| 28 | Incidental HMA surf (40800050) | TON | 1,517 | $120.00 | $200.00 |
| 29 | PC conc sidewalk 4 (42400100) | SF | 7,155 | $9.85 | $17.00 |
| 30 | Detectable warnings (42400800) | SF | 678 | $26.50 | $25.00 |
| 31 | HMA surf rem 2 1/2 (44000159) | SY | 76,053 | $2.85 | $2.75 |
| 32 | Comb curb gutter rem (44000500) | LF | 1,404 | $6.75 | $14.75 |
| 33 | Sidewalk rem (44000600) | SF | 7,145 | $2.85 | $2.75 |
| 34 | CL B patch T2 13 (44201007) | SY | 175 | $420.00 | $385.00 |
| 35 | CL B patch T3 13 (44201011) | SY | 355 | $410.00 | $375.00 |
| 36 | CL B patch T4 13 (44201013) | SY | 54 | $305.00 | $375.00 |
| 37 | CL B patch T2 15 (44201031) | SY | 138 | $375.00 | $395.00 |
| 38 | CL B patch T3 15 (44201035) | SY | 39 | $350.00 | $385.00 |
| 39 | CL B patch T4 15 (44201037) | SY | 192 | $365.00 | $385.00 |
| 40 | Dowel bars 1 1/2 (44201299) | EACH | 1,468 | $0.01 | $0.01 |
| 41 | Saw cuts (44213200) | LF | 3,694 | $0.01 | $0.01 |
| 42 | Agg wedge SHLD type B (48102100) | TON | 866 | $28.50 | $30.00 |
| 43 | Pipe culvert remov (50105220) | LF | 64 | $90.00 | $31.00 |
| 44 | P cul CL A 1 eqrs 18 (542A5473) | LF | 56.50 | $235.00 | $126.00 |
| 45 | PRCF end S EL eqrs 18 (54214713) | EACH | 2 | $1,850.00 | $1,500.00 |
| 46 | Water valves adjust (56109210) | EACH | 1 | $340.00 | $800.00 |
| 47 | Inlets adjust (60260100) | EACH | 28 | $340.00 | $600.00 |
| 48 | Inlets reconst (60262700) | EACH | 3 | $2,200.00 | $900.00 |
| 49 | Man frames adjust (60300350) | EACH | 1 | $340.00 | $1,700.00 |
| 50 | Comb CC&G TY B-6.24 (60605000) | LF | 1,404 | $68.00 | $50.00 |
| 51 | Delineators (63500105) | EACH | 4 | $78.00 | $100.00 |
| 52 | Non SPL waste disposl (66900200) | CY | 186 | $0.01 | $86.00 |
| 53 | Soil disposal analy (66900530) | EACH | 16 | $1,300.00 | $1,300.00 |
| 54 | Reg sub P-const plan (66901001) | LS | 1 | $2,200.00 | $2,200.00 |
| 55 | Reg sub F con report (66901003) | LS | 1 | $2,200.00 | $2,200.00 |
| 56 | Reg sub mon (66901006) | CAL DAY | 15 | $1,240.00 | $1,240.00 |
| 57 | Engr field office A (67000400) | CAL MO | 3 | $3,500.00 | $3,800.00 |
| 58 | Mobilization (67100100) | LS | 1 | $150,000 | $196,850 |
| 59 | Traf cont-prot 701306 (70100460) | LS | 1 | $80,000 | $100.00 |
| 60 | Traf cont-prot 701336 (70100600) | LS | 1 | $20,000 | $4,100.00 |
| 61 | TR cont & prot 701501 (70102620) | LS | 1 | $500.00 | $22,950 |
| 62 | TR cont & prot 701801 (70102640) | LS | 1 | $2,350.00 | $100.00 |
| 63 | Short term pavt mking (70300100) | LF | 6,384 | $3.20 | $0.01 |
| 64 | SHRT TRM pavt MK rem (70300150) | SF | 2,129 | $0.01 | $0.01 |
| 65 | Pref PL PM TD STD LTR/sym (78004600) | SF | 62 | $90.00 | $45.78 |
| 66 | Pref PL PM TD STD L 6 (78004630) | LF | 5,966 | $4.35 | $5.51 |
| 67 | Pref PL PM TD STD L 8 (78004640) | LF | 291 | $18.50 | $8.16 |
| 68 | Pref PL PM TD STD L24 (78004720) | LF | 354 | $21.50 | $23.84 |
| 69 | Mod ureth PM line 4 (78009004) | LF | 95,720 | $0.80 | $0.58 |
| 70 | Mod ureth PM line 12 (78009012) | LF | 1,612 | $2.45 | $3.54 |
| 71 | GRV RCSD PM LTR & sym (78011000) | SF | 62 | $7.75 | $24.12 |
| 72 | GRV RCSD PVT MRKG 7 (78011035) | LF | 5,966 | $2.05 | $1.17 |
| 73 | GRV RCSD PVT MRKG 9 (78011045) | LF | 291 | $3.05 | $2.95 |
| 74 | GRV RCSD PVT MRKG 25 (78011125) | LF | 354 | $8.10 | $2.97 |
| 75 | Raised refl pavt MKR (78100100) | EACH | 295 | $44.50 | $48.27 |
| 76 | Raised ref PVT MK rem (78300200) | EACH | 295 | $0.01 | $0.01 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.