IDOT contract 78B07 bid tabulation
Section (134,135)RS-3. Let by Illinois DOT on April 25, 2025, Alexander, District 09. 2 bids received; low bid $1,463,916 by E. T. Simonds Construction Company.
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 30
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E. T. Simonds Construction Company | $1,463,916 | Low |
| 2 | Samron Midwest Contracting, Inc. | $1,689,168 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E. T. Simonds Construction Company | 2. Samron Midwest Contracting, Inc. |
|---|---|---|---|---|---|
| 1 | HMA surf rem var DP (X4401198) | SY | 80 | $32.99 | $1.50 |
| 2 | Bit matls tack CT (40600290) | LB | 50,988 | $0.01 | $0.01 |
| 3 | Long joint sealant (40600370) | LF | 24,672 | $2.70 | $2.70 |
| 4 | Matl transfer device (40600405) | TON | 10,237 | $2.33 | $1.65 |
| 5 | HMA surf rem butt JT (40600982) | SY | 1,274 | $9.32 | $10.00 |
| 6 | Temporary ramp (40600990) | SY | 205 | $32.47 | $15.00 |
| 7 | HMA BC IL-9.5FG N70 (40602970) | TON | 4,680 | $78.68 | $90.00 |
| 8 | HMA SC IL-9.5 C N70 (40604052) | TON | 5,557 | $75.23 | $87.00 |
| 9 | Incidental HMA surf (40800050) | TON | 175 | $213.67 | $275.00 |
| 10 | HMA surf rem 1 1/2 (44000155) | SY | 86,994 | $1.27 | $1.45 |
| 11 | HMA surf rem 2 3/4 (44000160) | SY | 543 | $6.30 | $1.60 |
| 12 | CL D patch T1 14 (44201811) | SY | 5 | $275.00 | $400.00 |
| 13 | CL D patch T2 14 (44201815) | SY | 114 | $250.00 | $395.00 |
| 14 | CL D patch T3 14 (44201819) | SY | 20 | $238.35 | $390.00 |
| 15 | CL D patch T4 14 (44201821) | SY | 80 | $226.00 | $385.00 |
| 16 | Agg wedge SHLD type B (48102100) | TON | 1,011 | $29.43 | $40.00 |
| 17 | HMA shoulders (48203100) | TON | 2,058 | $76.10 | $90.00 |
| 18 | Engr field office A (67000400) | CAL MO | 3 | $1,800.00 | $1,725.00 |
| 19 | Mobilization (67100100) | LS | 1 | $99,497 | $98,000 |
| 20 | Traf cont-prot 701201 (70100450) | LS | 1 | $0.01 | $0.01 |
| 21 | Traf cont-prot 701306 (70100460) | LS | 1 | $27,961 | $44,000 |
| 22 | Traf cont-prot 701336 (70100600) | LS | 1 | $8,520.00 | $8,500.00 |
| 23 | Changeable message SN (70107025) | CAL DAY | 28 | $76.50 | $105.00 |
| 24 | Short term pavt mking (70300100) | LF | 6,737 | $1.42 | $1.75 |
| 25 | SHRT TRM pavt MK rem (70300150) | SF | 2,250 | $0.01 | $1.50 |
| 26 | Temp PVT MK line 4 - paint (70300221) | LF | 63,205 | $0.01 | $0.01 |
| 27 | Paint PVT MK line 4 (78001110) | LF | 63,205 | $0.12 | $0.13 |
| 28 | Raised refl pavt MKR (78100100) | EACH | 316 | $36.87 | $36.00 |
| 29 | Raised ref PVT MK rem (78300200) | EACH | 316 | $6.08 | $12.40 |
| 30 | PVT MKG rem grinding (78300201) | SF | 21,071 | $0.01 | $0.01 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.