IDOT contract 66R12 bid tabulation

Section 50(4-6)PP,32(1,2)PP. Let by Illinois DOT on April 25, 2025, Lasalle, District 03. 2 bids received; low bid $579,432 by D. Construction, Inc..

Owner
Illinois DOT
Letting
25 APR 2025
Pay items
22
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1D. Construction, Inc.$579,432Low
2G. M. Sipes Construction, Inc.$614,272+6.0%
IDOT contract 66R12: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. D. Construction, Inc.2. G. M. Sipes Construction, Inc.
1Temp rumble strips SP (X7010118)EACH14$1,250.00$50.00
2Dowel bar assembly (Z0017099)EACH6$250.00$75.00
3Welded wire reinf (44200050)SY174$20.00$25.00
4CL B patch T4 10 (44200976)SY174$210.00$375.00
5CL B patch T2 16 (44201043)SY728$300.00$425.00
6CL B patch T3 16 (44201047)SY21$400.00$425.00
7CL B patch T4 16 (44201048)SY125$300.00$425.00
8CL B patch expan JT (44201294)LF104$35.00$10.00
9Deformed bars exp JT (44201296)EACH100$27.50$20.00
10Dowel bars 1 1/2 (44201299)EACH1,860$20.00$20.00
11Saw cuts (44213200)LF5,649$6.00$0.01
12Tie bars 3/4 (44213204)EACH75$20.00$15.00
13Mobilization (67100100)LS1$34,750$30,000
14Traf cont-prot 701411 (70100420)EACH24$0.01$0.01
15Traf cont-prot 701401 (70100800)LS1$45,000$80,000
16Traf cont-prot 701456 (70100825)LS1$0.01$0.01
17TR cont surveillance (70103815)CAL DAY15$550.00$0.01
18Changeable message SN (70107025)CAL DAY56$100.00$0.01
19Night work zone light (70200100)LS1$10,000$4,000.00
20Pref PL PM TD STD L 9 (78004645)LF680$43.37$10.00
21Epoxy PVT MK line 4 (78005110)LF781$28.20$10.00
22GRV RCSD PVT MRKG 10 (78011050)LF680$32.37$3.00
IDOT contract 66R12: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy