IDOT contract 64T85 bid tabulation
Section (111&123)STY. Let by Illinois DOT on April 25, 2025, Ogle, District 02. 3 bids received; low bid $90,474 by Countryman, Inc..
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 13
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Countryman, Inc. | $90,474 | Low |
| 2 | Marking Specialists Corporation | $99,159 | +10% |
| 3 | RoadSafe Traffic Systems, Inc. | $199,989 | +121% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Countryman, Inc. | 2. Marking Specialists Corporation | 3. RoadSafe Traffic Systems, Inc. |
|---|---|---|---|---|---|---|
| 1 | Rumble resurfacing (X6420110) | SY | 30 | $200.00 | $597.66 | $1,000.00 |
| 2 | Construction layout (Z0013798) | LS | 1 | $5,000.00 | $4,400.00 | $15,000 |
| 3 | Mobilization (67100100) | LS | 1 | $5,000.00 | $5,500.00 | $1,000.00 |
| 4 | Traf cont-prot 701201 (70100450) | LS | 1 | $5,000.00 | $110.00 | $15,000 |
| 5 | TR cont & prot 701701 (70102635) | LS | 1 | $5,000.00 | $8,442.50 | $15,000 |
| 6 | Remov sin pan assy TA (72400100) | EACH | 2 | $280.00 | $82.50 | $787.50 |
| 7 | Mod ureth PM line 4 (78009004) | LF | 9,079 | $2.20 | $1.44 | $5.00 |
| 8 | Mod ureth PM line 8 (78009008) | LF | 663 | $4.80 | $3.67 | $10.00 |
| 9 | Mod ureth PM line 12 (78009012) | LF | 2,197 | $9.60 | $6.50 | $12.50 |
| 10 | Mod ureth PM line 24 (78009024) | LF | 128 | $14.40 | $15.00 | $25.00 |
| 11 | Raised refl pavt MKR (78100100) | EACH | 126 | $73.00 | $76.36 | $150.00 |
| 12 | Raised ref PVT MK rem (78300200) | EACH | 129 | $30.00 | $55.00 | $100.00 |
| 13 | PVT MKG rem WTR blast (78300202) | SF | 3,963 | $1.20 | $3.58 | $2.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.