IDOT contract 80B56 bid tabulation

Section (1300B-89)BP. Let by Illinois DOT on February 27, 2026, Cook, District 01. 3 bids received; low bid $401,758 by Eagle Painting & Maintenance Company, Inc..

Owner
Illinois DOT
Letting
27 FEB 2026
Pay items
18
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Eagle Painting & Maintenance Company, Inc.$401,758Low
2ERA-Valdivia Contractors, Inc.$426,428+6.0%
3Capital Industrial Services, LLC$443,300+10%
IDOT contract 80B56: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Eagle Painting & Maintenance Company, Inc.2. ERA-Valdivia Contractors, Inc.3. Capital Industrial Services, LLC
1C&D N-lead PT C RS N1 (X5060601)LS1$35,400$99,918$45,876
2C&D N-lead PT C RS N2 (X5060602)LS1$17,000$45,000$16,119
3Engrs FLD ofc TY A D1 (X6700407)CAL MO6$800.00$500.00$600.00
4Traf cont & prot SPL (X7010216)LS1$23,000$100.00$23,000
5Temp info signing (X7200061)SF102.80$12.00$5.00$12.00
6Clean & PT STL BR N1 (Z0010501)LS1$147,600$129,893$182,272
7Clean & PT STL BR N2 (Z0010502)LS1$68,000$135,000$64,475
8Mobilization (67100100)LS1$20,000$10,000$22,000
9TR cont & prot 701606 (70102625)LS1$5,500.00$100.00$5,500.00
10TR cont & prot 701801 (70102642)EACH1$1,000.00$100.00$1,000.00
11Pavt MK blkout tape 5 (70107005)LF4,425$2.60$0.10$2.60
12Changeable message SN (70107025)CAL DAY40$60.00$10.00$60.00
13SHRT TRM pavt MK rem (70300150)SF1,475$0.60$0.10$0.60
14Temp PVT MK L4 T4 tape (70307120)LF4,425$1.28$0.10$1.28
15Temp conc barrier (70400100)LF485$57.00$1.00$57.00
16Rel temp conc barrier (70400200)LF485$25.00$1.00$25.00
17Imp attn temp FRD TL2 (70600235)EACH2$6,500.00$100.00$6,500.00
18Imp attn rel FRD TL2 (70600320)EACH2$2,500.00$100.00$2,500.00
IDOT contract 80B56: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy