IDOT contract 78C15 bid tabulation
Section D9. Let by Illinois DOT on June 12, 2026, White, District 09. 4 bids received; low bid $409,970 by Eagle Painting & Maintenance Company, Inc..
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 13
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Eagle Painting & Maintenance Company, Inc. | $409,970 | Low |
| 2 | Civil Coatings and Construction Inc. | $567,067 | +38% |
| 3 | Three Star Painting, Inc. | $600,000 | +46% |
| 4 | Thomas Industrial Coatings, Inc. | $909,985 | +122% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Eagle Painting & Maintenance Company, Inc. | 2. Civil Coatings and Construction Inc. | 3. Three Star Painting, Inc. | 4. Thomas Industrial Coatings, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | C&D lead PT CL RS N1 (Z0007101) | LS | 1 | $28,750 | $1,000.00 | $8,000.00 | $119,470 |
| 2 | C&D lead PT CL RS N2 (Z0007102) | LS | 1 | $23,750 | $1,000.00 | $8,000.00 | $108,090 |
| 3 | Clean & PT STL BR N1 (Z0010501) | LS | 1 | $114,250 | $214,348 | $259,700 | $175,255 |
| 4 | Clean & PT STL BR N2 (Z0010502) | LS | 1 | $95,000 | $214,348 | $246,700 | $164,980 |
| 5 | Engr field office A (67000400) | CAL MO | 6 | $800.00 | $0.01 | $500.00 | $12,185 |
| 6 | Mobilization (67100100) | LS | 1 | $20,000 | $28,000 | $22,500 | $33,710 |
| 7 | Traf cont-prot 701402 (70100207) | EACH | 4 | $20,850 | $16,000 | $2,500.00 | $36,145 |
| 8 | Changeable message SN (70107025) | CAL DAY | 56 | $120.00 | $135.00 | $50.00 | $131.25 |
| 9 | Temp conc barrier (70400100) | LF | 900 | $20.00 | $32.00 | $30.00 | $53.45 |
| 10 | Pin temp conc barrier (70400125) | EACH | 240 | $5.00 | $0.01 | $10.00 | $24.00 |
| 11 | Rel temp conc barrier (70400200) | LF | 900 | $5.00 | $0.01 | $1.00 | $13.50 |
| 12 | Imp attn temp NRN TL3 (70600251) | EACH | 4 | $1,600.00 | $1,500.00 | $1,500.00 | $4,015.00 |
| 13 | Imp attn rel NRN TL3 (70600352) | EACH | 4 | $800.00 | $500.00 | $750.00 | $341.25 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.