IDOT contract 78B00 bid tabulation

Section D9. Let by Illinois DOT on February 27, 2026, Jackson, District 09. 2 bids received; low bid $2,170,000 by Gerstner Electric, Inc..

Owner
Illinois DOT
Letting
27 FEB 2026
Pay items
34
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Gerstner Electric, Inc.$2,170,000Low
2Brown Electric, Inc.$2,568,409+18%
IDOT contract 78B00: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Gerstner Electric, Inc.2. Brown Electric, Inc.
1Ped signal post 10 FT (X1400367)EACH3$1,605.00$1,898.00
2Ped signal post 5 FT (X1400378)EACH35$1,475.00$1,418.00
3Potholing (X1700066)EACH69$580.00$60.00
4Conc foundation GR MT (X7340100)CY7$2,730.00$380.00
5Conduit splice (X8100105)EACH3$300.00$1,500.00
6Uninter PS cab SPL (X8620250)EACH14$10,185$12,825
7Accessible ped signal (X8760200)EACH122$1,275.00$1,394.00
8Conc FDN TY A 12D (X8780012)LF152$380.00$410.00
9Vid & rad hyb det sys (X8891301)EACH17$37,335$52,454
10Engr field office A (67000400)CAL MO12$5,000.00$2,000.00
11Mobilization (67100100)LS1$106,107$50,000
12TR cont & prot 701701 (70102635)LS1$6,500.00$34,000
13TR cont & prot 701801 (70102640)LS1$6,500.00$21,000
14Serv install GRND MT (80500010)EACH15$9,400.00$9,370.00
15Undrgrd C PVC 2 (81028350)LF2,099$58.00$49.00
16Undrgrd C PVC 3 (81028370)LF51$110.00$58.00
17Handhole (81400100)EACH2$2,950.00$5,714.00
18EC C XLP use 3-1C 10 (81702450)LF170$6.50$4.90
19Fac T5 cab (85700300)EACH15$32,260$38,746
20Elcbl C signal 14 2C (87301215)LF9,637$2.10$3.63
21Elcbl C signal 14 3C (87301225)LF1,304$2.90$4.18
22Elcbl C signal 14 7C (87301255)LF1,082$3.45$5.15
23Elcbl C serv 6 3C (87301815)LF1,412$6.50$9.85
24TS post 16 (87501200)EACH5$2,650.00$3,170.00
25Conc FDN TY A (87800100)LF12$615.00$560.00
26Drill EX foundation (87900100)EACH21$320.00$2,600.00
27Drill EX handhole (87900200)EACH38$320.00$468.00
28SH LED 1F 3S BM (88030050)EACH1$1,170.00$1,095.00
29SH LED 1F 5S BM (88030100)EACH5$1,450.00$1,256.00
30Ped SH LED 1F BM CDT (88102717)EACH8$835.00$856.00
31TS backplate (88200100)EACH6$555.00$765.00
32Reloc EX TS equip (89501250)EACH14$780.00$1,694.00
33Rem elcbl FR con (89502300)LF1,186$1.00$6.33
34Remov EX TS equip (89502375)EACH17$1,035.00$1,436.50
IDOT contract 78B00: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy