IDOT contract 78B06 bid tabulation
Section (29X,8X)TS-2. Let by Illinois DOT on June 13, 2025, Saline, District 09. 2 bids received; low bid $493,996 by Brown Electric, Inc..
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 39
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Brown Electric, Inc. | $493,996 | Low |
| 2 | Gerstner Electric, Inc. | $508,200 | +3.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Brown Electric, Inc. | 2. Gerstner Electric, Inc. |
|---|---|---|---|---|---|
| 1 | Grund rod 8' copper (XP000179) | EACH | 4 | $310.00 | $125.00 |
| 2 | Remvl lmnair no salvg (X1400267) | EACH | 4 | $475.00 | $100.00 |
| 3 | Conc median surf rem (X4402020) | SF | 276 | $25.55 | $30.50 |
| 4 | Comb LTG control (X8250091) | EACH | 1 | $6,300.00 | $10,250 |
| 5 | Radio transceiver (Z0033062) | EACH | 1 | $16,650 | $3,920.00 |
| 6 | Conc median surf 4 (60618300) | SF | 286 | $22.24 | $25.00 |
| 7 | Non SPL waste disposl (66900200) | CY | 40 | $125.00 | $220.00 |
| 8 | Soil disposal analy (66900530) | EACH | 1 | $2,125.00 | $2,125.00 |
| 9 | Reg sub P-const plan (66901001) | LS | 1 | $2,570.00 | $2,500.00 |
| 10 | Reg sub F con report (66901003) | LS | 1 | $2,690.00 | $2,500.00 |
| 11 | Reg sub mon (66901006) | CAL DAY | 5 | $2,697.00 | $1,500.00 |
| 12 | Mobilization (67100100) | LS | 1 | $25,000 | $80,379 |
| 13 | TR cont & prot 701701 (70102635) | LS | 1 | $25,000 | $11,000 |
| 14 | Changeable message SN (70107025) | CAL DAY | 56 | $100.00 | $190.00 |
| 15 | Sign panel T1 (72000100) | SF | 47 | $38.00 | $50.00 |
| 16 | Locate undergr cable (80300100) | LF | 80 | $7.00 | $10.00 |
| 17 | Serv install GRND MT (80500010) | EACH | 1 | $10,300 | $10,250 |
| 18 | Undrgrd C PVC 2 1/2 (81028360) | LF | 55 | $82.76 | $55.00 |
| 19 | Undrgrd C PVC 4 (81028390) | LF | 330 | $61.90 | $80.00 |
| 20 | Handhole (81400100) | EACH | 3 | $5,895.00 | $4,100.00 |
| 21 | EC C XLP use 1C 10 (81702110) | LF | 1,968 | $4.60 | $2.50 |
| 22 | Lum LED rdwy G (82110007) | EACH | 5 | $1,410.00 | $1,200.00 |
| 23 | Fac T5 cab (85700300) | EACH | 1 | $36,930 | $37,300 |
| 24 | Uninter power sup ext (86200300) | EACH | 1 | $8,972.00 | $14,125 |
| 25 | Elcbl C signal 14 5C (87301245) | LF | 1,120 | $4.39 | $4.55 |
| 26 | Elcbl C egrdc 6 1C (87301900) | LF | 450 | $4.48 | $4.75 |
| 27 | TS post 14 (87501000) | EACH | 1 | $3,214.00 | $3,100.00 |
| 28 | STL comb maa&P 34 (87702900) | EACH | 1 | $33,387 | $21,000 |
| 29 | STL comb maa&P 44 (87702950) | EACH | 2 | $35,167 | $23,700 |
| 30 | STL comb maa&P 54 (87702990) | EACH | 1 | $39,922 | $28,150 |
| 31 | Conc FDN TY A (87800100) | LF | 3 | $520.00 | $810.00 |
| 32 | Conc FDN TY C (87800150) | LF | 3 | $933.00 | $2,375.00 |
| 33 | Conc FDN TY E 36D (87800415) | LF | 36 | $720.00 | $1,000.00 |
| 34 | Drill EX handhole (87900200) | EACH | 2 | $410.00 | $375.00 |
| 35 | SH LED 1F 3S mam (88030020) | EACH | 12 | $996.00 | $1,625.00 |
| 36 | SH LED 1F 3S BM (88030050) | EACH | 8 | $946.00 | $1,595.00 |
| 37 | TS backplate ret-refl (88200510) | EACH | 20 | $305.00 | $400.00 |
| 38 | Reloc EX TS equip (89501250) | EACH | 1 | $9,400.00 | $10,500 |
| 39 | Remov EX TS equip (89502375) | EACH | 1 | $35,800 | $30,700 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.