IDOT contract 78A33 bid tabulation
Section (1X-1)TS-6. Let by Illinois DOT on June 13, 2025, Williamson, District 09. 2 bids received; low bid $1,056,436 by Brown Electric, Inc..
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 70
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Brown Electric, Inc. | $1,056,436 | Low |
| 2 | Gerstner Electric, Inc. | $1,095,000 | +4.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Brown Electric, Inc. | 2. Gerstner Electric, Inc. |
|---|---|---|---|---|---|
| 1 | Grund rod 8' copper (XP000179) | EACH | 8 | $320.00 | $120.00 |
| 2 | Remvl lmnair no salvg (X1400267) | EACH | 4 | $579.00 | $165.00 |
| 3 | Island removal (X4402805) | SF | 1,638 | $14.00 | $11.40 |
| 4 | Comb LTG control (X8250091) | EACH | 1 | $7,976.00 | $11,750 |
| 5 | Accessible ped signal (X8760200) | EACH | 10 | $1,369.00 | $1,390.00 |
| 6 | Construction layout (Z0013798) | LS | 1 | $35,000 | $5,100.00 |
| 7 | PC conc sidewalk 4 (42400100) | SF | 495 | $40.00 | $38.60 |
| 8 | Detectable warnings (42400800) | SF | 112 | $43.00 | $30.15 |
| 9 | Pavement rem (44000100) | SY | 850 | $0.01 | $37.80 |
| 10 | Comb curb gutter rem (44000500) | LF | 26 | $16.00 | $136.50 |
| 11 | Tie bars 3/4 (44213204) | EACH | 150 | $23.00 | $42.00 |
| 12 | Comb CC&G TY B-6.24 (60605000) | LF | 26 | $93.00 | $235.00 |
| 13 | Comb CC&G TM6.06 (60608600) | LF | 127 | $78.00 | $141.50 |
| 14 | Comb CC&G TM6.24 (60610400) | LF | 212 | $90.00 | $109.00 |
| 15 | Conc median surf 4 (60618300) | SF | 1,316 | $31.00 | $25.50 |
| 16 | Engr field office A (67000400) | CAL MO | 2 | $3,000.00 | $2,500.00 |
| 17 | Mobilization (67100100) | LS | 1 | $25,000 | $132,930 |
| 18 | TR cont & prot 701601 (70102630) | LS | 1 | $10,000 | $6,800.00 |
| 19 | TR cont & prot 701701 (70102635) | LS | 1 | $48,000 | $6,800.00 |
| 20 | Changeable message SN (70107025) | CAL DAY | 28 | $135.00 | $180.00 |
| 21 | Night work zone light (70200100) | LS | 1 | $6,500.00 | $4,950.00 |
| 22 | Temp PVT MK line 4 - paint (70300221) | LF | 1,000 | $2.25 | $2.10 |
| 23 | Temp PVT MK line 12 - paint (70300261) | LF | 1,231 | $6.60 | $6.30 |
| 24 | Temp PVT MK line 24 - paint (70300281) | LF | 150 | $15.00 | $12.60 |
| 25 | Sign panel T1 (72000100) | SF | 45 | $67.00 | $52.00 |
| 26 | Sign panel T2 (72000200) | SF | 25 | $100.00 | $52.00 |
| 27 | Mod ureth PM line 4 (78009004) | LF | 1,000 | $5.10 | $5.25 |
| 28 | Mod ureth PM line 12 (78009012) | LF | 1,231 | $16.00 | $15.75 |
| 29 | Mod ureth PM line 24 (78009024) | LF | 150 | $35.00 | $31.50 |
| 30 | GRV RCSD PVT MRKG 5 (78011025) | LF | 1,000 | $5.00 | $4.75 |
| 31 | GRV RCSD PVT MRKG 13 (78011065) | LF | 1,231 | $13.75 | $14.20 |
| 32 | GRV RCSD PVT MRKG 25 (78011125) | LF | 150 | $32.00 | $28.35 |
| 33 | PVT MKG rem grinding (78300201) | SF | 200 | $46.00 | $39.40 |
| 34 | Locate undergr cable (80300100) | LF | 100 | $5.00 | $7.20 |
| 35 | Undrgrd C PVC 2 1/2 (81028360) | LF | 140 | $41.00 | $21.25 |
| 36 | Undrgrd C PVC 4 (81028390) | LF | 895 | $49.97 | $48.30 |
| 37 | Undrgrd C CNC 2 (81028750) | LF | 55 | $49.60 | $85.00 |
| 38 | Handhole (81400100) | EACH | 5 | $5,714.00 | $3,150.00 |
| 39 | UD 2#10#10GXLPUSE 3/4 (81603010) | LF | 105 | $15.12 | $17.40 |
| 40 | EC C XLP use 1C 10 (81702110) | LF | 2,805 | $4.78 | $2.30 |
| 41 | Lum LED rdwy I (82110009) | EACH | 10 | $1,782.00 | $830.00 |
| 42 | LT P A 45MH 15MA (83009600) | EACH | 2 | $7,908.00 | $5,660.00 |
| 43 | LP F M 15BC 8 5/8X6 (83600356) | EACH | 2 | $1,637.00 | $1,800.00 |
| 44 | Bkwy dev cou SS SCRN (83800650) | EACH | 8 | $247.50 | $940.00 |
| 45 | Rem LT U no salv (84200600) | EACH | 1 | $11,000 | $820.00 |
| 46 | Rem pole FDN (84200804) | EACH | 1 | $47,250 | $750.00 |
| 47 | Fac T5 cab (85700300) | EACH | 1 | $39,630 | $40,000 |
| 48 | Uninter power sup ext (86200300) | EACH | 1 | $8,972.00 | $13,560 |
| 49 | Elcbl C signal 14 3C (87301225) | LF | 65 | $3.99 | $3.75 |
| 50 | Elcbl C signal 14 5C (87301245) | LF | 1,107 | $4.39 | $4.10 |
| 51 | Elcbl C egrdc 6 1C (87301900) | LF | 1,110 | $4.48 | $4.20 |
| 52 | TS post galvs 12 (87502460) | EACH | 6 | $2,705.00 | $2,540.00 |
| 53 | TS post galvs 14 (87502480) | EACH | 1 | $3,170.00 | $3,080.00 |
| 54 | Ped P-B post galvs T1 (87601100) | EACH | 1 | $2,500.00 | $1,700.00 |
| 55 | STL comb maa&P 66 (87703070) | EACH | 1 | $49,987 | $35,450 |
| 56 | STL comb maa&P 70 (87703090) | EACH | 1 | $52,055 | $36,350 |
| 57 | STL comb maa&P 75 (87703120) | EACH | 2 | $53,500 | $37,000 |
| 58 | Conc FDN TY A (87800100) | LF | 21 | $560.00 | $460.00 |
| 59 | Conc FDN TY C (87800150) | LF | 4 | $1,172.00 | $1,590.00 |
| 60 | Conc FDN TY E 42D (87800420) | LF | 100 | $1,062.00 | $1,870.00 |
| 61 | Drill EX handhole (87900200) | EACH | 4 | $620.00 | $180.00 |
| 62 | SH LED 1F 3S mam (88030020) | EACH | 20 | $922.00 | $1,910.00 |
| 63 | SH LED 1F 3S BM (88030050) | EACH | 11 | $916.00 | $1,850.00 |
| 64 | Ped SH LED 1F BM CDT (88102717) | EACH | 1 | $875.00 | $1,340.00 |
| 65 | Ped SH LED 1F PM W CT (88102719) | EACH | 5 | $875.00 | $1,340.00 |
| 66 | Ped SH LED 2F BM CDT (88102747) | EACH | 2 | $1,406.00 | $2,325.00 |
| 67 | TS backplate ret-refl (88200510) | EACH | 31 | $365.00 | $300.00 |
| 68 | Ped push-button (88800100) | EACH | 10 | $765.00 | $1,400.00 |
| 69 | Reloc EX TS equip (89501250) | EACH | 1 | $13,976 | $6,875.00 |
| 70 | Remov EX TS equip (89502375) | EACH | 1 | $9,200.00 | $16,200 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.