IDOT contract 78998 bid tabulation
Section D9. Let by Illinois DOT on January 17, 2025, Jackson, District 09. 2 bids received; low bid $1,954,250 by Gerstner Electric, Inc..
- Owner
- Illinois DOT
- Letting
- 17 JAN 2025
- Pay items
- 43
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Gerstner Electric, Inc. | $1,954,250 | Low |
| 2 | Brown Electric, Inc. | $2,207,503 | +13% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gerstner Electric, Inc. | 2. Brown Electric, Inc. |
|---|---|---|---|---|---|
| 1 | Grund rod 8' copper (XP000179) | EACH | 50 | $205.00 | $212.00 |
| 2 | Install comm cabinet (X0322921) | EACH | 1 | $2,885.00 | $13,125 |
| 3 | Traf CNT data col sys (X0328016) | EACH | 1 | $84,855 | $92,937 |
| 4 | Outdr RTD NTWRK cable (X1400102) | LF | 120 | $2.25 | $5.30 |
| 5 | HQ FO connectivity (X1400307) | LS | 1 | $5,705.00 | $598.75 |
| 6 | Sig perform meas serv (X1400499) | EACH | 1 | $118,410 | $121,989 |
| 7 | Comm vault 24X36 (X1400500) | EACH | 25 | $3,895.00 | $4,953.00 |
| 8 | Comm vault 48X48 (X1400501) | EACH | 6 | $6,000.00 | $8,987.18 |
| 9 | Potholing (X1700066) | EACH | 200 | $500.00 | $90.00 |
| 10 | Conc foundation GR MT (X7340100) | CY | 1.50 | $3,780.00 | $650.00 |
| 11 | Conduit splice (X8100105) | EACH | 3 | $265.00 | $480.00 |
| 12 | Fiber layout (X8710010) | LS | 1 | $9,655.00 | $22,260 |
| 13 | Fib opt CBL 48F SM (X8710030) | LF | 38,525 | $2.20 | $5.10 |
| 14 | Fib opt CBL 12F SM (X8710036) | LF | 1,275 | $2.65 | $3.05 |
| 15 | FO interct center 48P (X8710094) | EACH | 3 | $3,765.00 | $2,873.85 |
| 16 | Ethernet MNG switch (X8710101) | EACH | 1 | $9,855.00 | $7,726.80 |
| 17 | Ethernet switch (X8710103) | EACH | 6 | $3,575.00 | $3,062.80 |
| 18 | Foc splice - lateral (X8710304) | EACH | 7 | $6,310.00 | $4,279.00 |
| 19 | Foc splice - mainline (X8710306) | EACH | 4 | $6,985.00 | $6,875.00 |
| 20 | Fib opt utilit marker (X8710318) | EACH | 91 | $245.00 | $236.00 |
| 21 | Vid & rad hyb det sys (X8891301) | EACH | 7 | $49,550 | $54,581 |
| 22 | Engr field office A (67000400) | CAL MO | 12 | $5,000.00 | $2,000.00 |
| 23 | Mobilization (67100100) | LS | 1 | $150,002 | $20,000 |
| 24 | Traf cont-prot 701421 (70100310) | LS | 1 | $5,470.00 | $7,200.00 |
| 25 | Traf cont-prot 701422 (70100320) | LS | 1 | $5,470.00 | $100.00 |
| 26 | TR cont & prot 701601 (70102630) | LS | 1 | $5,470.00 | $3,500.00 |
| 27 | TR cont & prot 701602 (70102632) | LS | 1 | $5,470.00 | $8,800.00 |
| 28 | TR cont & prot 701701 (70102635) | LS | 1 | $5,470.00 | $9,200.00 |
| 29 | TR cont & prot 701801 (70102640) | LS | 1 | $5,470.00 | $1,500.00 |
| 30 | Locate undergr cable (80300100) | LF | 2,000 | $1.45 | $3.96 |
| 31 | Serv install GRND MT (80500010) | EACH | 3 | $12,205 | $12,987 |
| 32 | Undrgrd C PVC 2 (81028350) | LF | 408 | $19.30 | $41.76 |
| 33 | Undrgrd C PVC 4 (81028390) | LF | 23 | $69.00 | $60.72 |
| 34 | Undrgrd C CNC 1 1/2 (81028740) | LF | 36,294 | $8.00 | $14.97 |
| 35 | EC C XLP use 3-1C 10 (81702450) | LF | 166 | $5.75 | $5.25 |
| 36 | Fac T5 cab (85700300) | EACH | 7 | $30,350 | $32,130 |
| 37 | Uninter power sup ext (86200300) | EACH | 5 | $14,045 | $10,076 |
| 38 | Elcbl C serv 6 3C (87301815) | LF | 166 | $8.55 | $6.75 |
| 39 | Elcbl C egrdc 6 1C (87301900) | LF | 5,116 | $2.60 | $5.48 |
| 40 | Conc FDN TY D (87800200) | LF | 3 | $2,470.00 | $1,265.00 |
| 41 | Drill EX foundation (87900100) | EACH | 14 | $710.00 | $1,420.00 |
| 42 | Reloc EX TS equip (89501250) | EACH | 4 | $1,045.00 | $1,850.00 |
| 43 | Remov EX TS equip (89502375) | EACH | 8 | $1,045.00 | $3,972.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.