IDOT contract 78998 bid tabulation

Section D9. Let by Illinois DOT on January 17, 2025, Jackson, District 09. 2 bids received; low bid $1,954,250 by Gerstner Electric, Inc..

Owner
Illinois DOT
Letting
17 JAN 2025
Pay items
43
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Gerstner Electric, Inc.$1,954,250Low
2Brown Electric, Inc.$2,207,503+13%
IDOT contract 78998: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Gerstner Electric, Inc.2. Brown Electric, Inc.
1Grund rod 8' copper (XP000179)EACH50$205.00$212.00
2Install comm cabinet (X0322921)EACH1$2,885.00$13,125
3Traf CNT data col sys (X0328016)EACH1$84,855$92,937
4Outdr RTD NTWRK cable (X1400102)LF120$2.25$5.30
5HQ FO connectivity (X1400307)LS1$5,705.00$598.75
6Sig perform meas serv (X1400499)EACH1$118,410$121,989
7Comm vault 24X36 (X1400500)EACH25$3,895.00$4,953.00
8Comm vault 48X48 (X1400501)EACH6$6,000.00$8,987.18
9Potholing (X1700066)EACH200$500.00$90.00
10Conc foundation GR MT (X7340100)CY1.50$3,780.00$650.00
11Conduit splice (X8100105)EACH3$265.00$480.00
12Fiber layout (X8710010)LS1$9,655.00$22,260
13Fib opt CBL 48F SM (X8710030)LF38,525$2.20$5.10
14Fib opt CBL 12F SM (X8710036)LF1,275$2.65$3.05
15FO interct center 48P (X8710094)EACH3$3,765.00$2,873.85
16Ethernet MNG switch (X8710101)EACH1$9,855.00$7,726.80
17Ethernet switch (X8710103)EACH6$3,575.00$3,062.80
18Foc splice - lateral (X8710304)EACH7$6,310.00$4,279.00
19Foc splice - mainline (X8710306)EACH4$6,985.00$6,875.00
20Fib opt utilit marker (X8710318)EACH91$245.00$236.00
21Vid & rad hyb det sys (X8891301)EACH7$49,550$54,581
22Engr field office A (67000400)CAL MO12$5,000.00$2,000.00
23Mobilization (67100100)LS1$150,002$20,000
24Traf cont-prot 701421 (70100310)LS1$5,470.00$7,200.00
25Traf cont-prot 701422 (70100320)LS1$5,470.00$100.00
26TR cont & prot 701601 (70102630)LS1$5,470.00$3,500.00
27TR cont & prot 701602 (70102632)LS1$5,470.00$8,800.00
28TR cont & prot 701701 (70102635)LS1$5,470.00$9,200.00
29TR cont & prot 701801 (70102640)LS1$5,470.00$1,500.00
30Locate undergr cable (80300100)LF2,000$1.45$3.96
31Serv install GRND MT (80500010)EACH3$12,205$12,987
32Undrgrd C PVC 2 (81028350)LF408$19.30$41.76
33Undrgrd C PVC 4 (81028390)LF23$69.00$60.72
34Undrgrd C CNC 1 1/2 (81028740)LF36,294$8.00$14.97
35EC C XLP use 3-1C 10 (81702450)LF166$5.75$5.25
36Fac T5 cab (85700300)EACH7$30,350$32,130
37Uninter power sup ext (86200300)EACH5$14,045$10,076
38Elcbl C serv 6 3C (87301815)LF166$8.55$6.75
39Elcbl C egrdc 6 1C (87301900)LF5,116$2.60$5.48
40Conc FDN TY D (87800200)LF3$2,470.00$1,265.00
41Drill EX foundation (87900100)EACH14$710.00$1,420.00
42Reloc EX TS equip (89501250)EACH4$1,045.00$1,850.00
43Remov EX TS equip (89502375)EACH8$1,045.00$3,972.00
IDOT contract 78998: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy