IDOT contract 76T77 bid tabulation
Section 132-4TS. Let by Illinois DOT on June 13, 2025, Madison, District 08. 2 bids received; low bid $678,250 by Gerstner Electric, Inc..
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 50
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Gerstner Electric, Inc. | $678,250 | Low |
| 2 | Wissehr Electric, Inc. | $698,589 | +3.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gerstner Electric, Inc. | 2. Wissehr Electric, Inc. |
|---|---|---|---|---|---|
| 1 | Bollard removal (X0350810) | EACH | 2 | $290.00 | $305.00 |
| 2 | Parking lot pavt rem (X4404000) | SY | 165 | $27.00 | $29.00 |
| 3 | Rem EX TR cont & cab (X8950105) | EACH | 1 | $730.00 | $3,100.00 |
| 4 | Construction layout (Z0013798) | LS | 1 | $3,225.00 | $7,280.00 |
| 5 | Agg surf course TY B (40200800) | TON | 38 | $70.35 | $75.00 |
| 6 | Non SPL waste disposl (66900200) | CY | 583 | $93.50 | $2.00 |
| 7 | Soil disposal analy (66900530) | EACH | 1 | $1,575.00 | $1,550.00 |
| 8 | Reg sub P-const plan (66901001) | LS | 1 | $2,100.00 | $2,450.00 |
| 9 | Reg sub F con report (66901003) | LS | 1 | $2,100.00 | $2,450.00 |
| 10 | Reg sub mon (66901006) | CAL DAY | 4 | $1,150.00 | $1,400.00 |
| 11 | Mobilization (67100100) | LS | 1 | $34,794 | $154,500 |
| 12 | TR cont & prot 701701 (70102635) | LS | 1 | $6,580.00 | $12,000 |
| 13 | Sign panel T1 (72000100) | SF | 15 | $40.00 | $112.00 |
| 14 | Sign panel T2 (72000200) | SF | 20 | $40.00 | $146.00 |
| 15 | Remov sign panel T1 (72400310) | SF | 18 | $1.00 | $23.60 |
| 16 | THPL PVT MK line 24 (78000650) | LF | 195 | $78.75 | $32.20 |
| 17 | PVT MKG rem grinding (78300201) | SF | 390 | $40.00 | $4.00 |
| 18 | Serv install TY A (80500100) | EACH | 1 | $7,200.00 | $5,415.00 |
| 19 | Undrgrd C galvs 2 (81028200) | LF | 549 | $52.00 | $15.00 |
| 20 | Undrgrd C galvs 4 (81028240) | LF | 206 | $125.00 | $42.85 |
| 21 | Undrgrd C galvs 5 (81028250) | LF | 126 | $170.00 | $66.15 |
| 22 | Undrgrd C PVC 1 1/4 (81028330) | LF | 201 | $21.00 | $62.75 |
| 23 | Undrgrd C PVC 2 (81028350) | LF | 89 | $32.00 | $64.00 |
| 24 | Undrgrd C PVC 3 (81028370) | LF | 48 | $35.00 | $103.00 |
| 25 | Undrgrd C PVC 5 (81028400) | LF | 8 | $38.00 | $400.00 |
| 26 | Handhole (81400100) | EACH | 7 | $6,000.00 | $2,000.00 |
| 27 | DBL handhole (81400300) | EACH | 1 | $7,400.00 | $5,850.00 |
| 28 | Remov elect serv inst (84500120) | EACH | 1 | $1,350.00 | $4,350.00 |
| 29 | Main EX TR sig instal (85000200) | EACH | 1 | $5,515.00 | $5,000.00 |
| 30 | Fac T4 cab (85700200) | EACH | 1 | $31,000 | $40,700 |
| 31 | Elcbl C signal 14 5C (87301245) | LF | 1,885 | $2.60 | $5.30 |
| 32 | Elcbl C signal 14 7C (87301255) | LF | 1,576 | $3.00 | $6.95 |
| 33 | Elcbl C lead 14 1PR (87301305) | LF | 3,713 | $2.25 | $1.75 |
| 34 | Elcbl C serv 6 2C (87301805) | LF | 38 | $4.95 | $67.00 |
| 35 | S maa & P 40 (87700240) | EACH | 1 | $16,500 | $30,200 |
| 36 | S maa & P 44 (87700260) | EACH | 1 | $17,050 | $31,600 |
| 37 | S maa & P 55 (87700320) | EACH | 2 | $22,615 | $40,550 |
| 38 | Conc FDN TY D (87800200) | LF | 3 | $2,060.00 | $1,670.00 |
| 39 | Conc FDN TY E 42D (87800420) | LF | 56 | $660.00 | $945.00 |
| 40 | SH P LED 1F 3S BM (88040070) | EACH | 4 | $1,125.00 | $1,600.00 |
| 41 | SH P LED 1F 3S mam (88040090) | EACH | 6 | $1,155.00 | $1,725.00 |
| 42 | SH P LED 1F 4S BM (88040110) | EACH | 4 | $1,345.00 | $1,785.00 |
| 43 | SH P LED 1F 4S mam (88040120) | EACH | 4 | $1,420.00 | $2,000.00 |
| 44 | TS backplate ret-refl (88200510) | EACH | 10 | $275.00 | $415.00 |
| 45 | Det loop T1 (88600100) | LF | 2,094 | $21.50 | $27.05 |
| 46 | Rem elcbl FR con (89502300) | LF | 7,886 | $0.05 | $0.01 |
| 47 | Remov EX TS equip (89502375) | EACH | 20 | $6,200.00 | $900.00 |
| 48 | Remov EX handhole (89502380) | EACH | 6 | $955.00 | $1,500.00 |
| 49 | Remov EX DBL handhole (89502382) | EACH | 1 | $1,715.00 | $2,715.00 |
| 50 | Remov EX conc FDN (89502385) | EACH | 5 | $1,305.00 | $1,385.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.