IDOT contract 78B49 bid tabulation
Section (41-8)PP-1,R-1. Let by Illinois DOT on June 12, 2026, Jefferson, District 09. 2 bids received; low bid $4,558,321 by Samron Midwest Contracting, Inc..
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 56
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Samron Midwest Contracting, Inc. | $4,558,321 | Low |
| 2 | E. T. Simonds Construction Company | $5,300,922 | +16% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Samron Midwest Contracting, Inc. | 2. E. T. Simonds Construction Company |
|---|---|---|---|---|---|
| 1 | Grading & shap SHLDRS (X2020110) | UNIT | 17 | $800.00 | $1,133.71 |
| 2 | Prof DMD GRND con PVT (X4202010) | SY | 16,143 | $11.50 | $9.87 |
| 3 | Island removal (X4402805) | SF | 523 | $3.00 | $8.77 |
| 4 | Traf cont & prot SPL (X7010216) | LS | 1 | $47,000 | $154,376 |
| 5 | Detour signing (X7200203) | LS | 1 | $15,000 | $21,553 |
| 6 | Construction layout (Z0013798) | LS | 1 | $40,000 | $61,677 |
| 7 | Nitrogen fert nutr (20101400) | LB | 51 | $2.00 | $1.87 |
| 8 | Phosphorus fert nutr (20101500) | LB | 51 | $2.00 | $1.87 |
| 9 | Potassium fert nutr (20101600) | LB | 51 | $2.00 | $1.87 |
| 10 | Seeding CL 2A (25000210) | ACRE | 1 | $4,200.00 | $4,345.00 |
| 11 | Seeding CL 7 (25000350) | ACRE | 1 | $1,500.00 | $1,595.00 |
| 12 | Agr ground limestone (25000700) | TON | 1 | $400.00 | $392.70 |
| 13 | Mulch method 1 (25100105) | ACRE | 1 | $2,800.00 | $2,667.50 |
| 14 | Agg subgrade impr 12 (30300112) | SY | 18,149 | $30.00 | $34.49 |
| 15 | Stab subbase 4 (31200100) | SY | 18,149 | $32.00 | $34.79 |
| 16 | Welded wire reinf (42000060) | SY | 1,853 | $15.00 | $24.21 |
| 17 | PCC PVT 9 1/4 jointd (42000406) | SY | 11,545 | $90.00 | $112.10 |
| 18 | Protective coat (42001300) | SY | 17,499 | $2.00 | $1.14 |
| 19 | Pavement rem (44000100) | SY | 11,954 | $18.00 | $26.48 |
| 20 | Comb curb gutter rem (44000500) | LF | 2,770 | $7.00 | $16.92 |
| 21 | Median removal (44003100) | SF | 4,351 | $1.50 | $5.70 |
| 22 | Paved SHLD removal (44004250) | SY | 4,352 | $9.00 | $21.71 |
| 23 | CL B patch T2 13 (44201007) | SY | 218 | $213.00 | $211.00 |
| 24 | CL B patch T3 13 (44201011) | SY | 452 | $207.00 | $206.00 |
| 25 | CL B patch T4 13 (44201013) | SY | 1,853 | $202.00 | $204.00 |
| 26 | Dowel bars 1 1/2 (44201299) | EACH | 2,241 | $30.00 | $25.28 |
| 27 | Saw cuts (44213200) | LF | 6,196 | $10.00 | $7.50 |
| 28 | Agg wedge SHLD type B (48102100) | TON | 114 | $80.00 | $110.06 |
| 29 | PCC shoulders 9 1/4 (48300405) | SY | 4,687 | $99.00 | $100.88 |
| 30 | Inlets adjust (60260100) | EACH | 3 | $950.00 | $3,244.58 |
| 31 | Comb CC&G TM4.06 (60608552) | LF | 31 | $55.00 | $146.47 |
| 32 | Comb CC&G TM4.24 (60608582) | LF | 2,993 | $45.00 | $67.92 |
| 33 | Conc median surf 4 (60618300) | SF | 4,519 | $9.00 | $15.55 |
| 34 | Conc med TSM4.24 (60622320) | SF | 3,790 | $14.50 | $20.45 |
| 35 | Engr field office A (67000400) | CAL MO | 3 | $1,800.00 | $2,000.00 |
| 36 | Mobilization (67100100) | LS | 1 | $273,000 | $188,317 |
| 37 | Traf cont-prot 701306 (70100460) | LS | 1 | $0.01 | $0.01 |
| 38 | Traf cont-prot 701336 (70100600) | LS | 1 | $0.01 | $0.01 |
| 39 | Traf cont-prot 701451 (70100820) | LS | 1 | $5,000.00 | $13,018 |
| 40 | TR cont & prot 701501 (70102620) | LS | 1 | $5,000.00 | $0.01 |
| 41 | Changeable message SN (70107025) | CAL DAY | 70 | $65.00 | $89.60 |
| 42 | Sign panel T1 (72000100) | SF | 97 | $35.00 | $65.98 |
| 43 | Remov sin pan assy TB (72400200) | EACH | 4 | $2,000.00 | $315.00 |
| 44 | Wood sin support (73000100) | LF | 58 | $67.00 | $63.30 |
| 45 | Pref PL PM TD STD LTR/sym (78004600) | SF | 130 | $39.00 | $38.50 |
| 46 | Pref PL PM TD STD L4 (78004620) | LF | 10,244 | $3.75 | $3.86 |
| 47 | Pref PL PM TD STD L 9 (78004645) | LF | 633 | $9.75 | $9.78 |
| 48 | Pref PL PM TD STD L12 (78004660) | LF | 51 | $13.25 | $13.00 |
| 49 | Pref PL PM TD STD L24 (78004720) | LF | 104 | $29.00 | $28.50 |
| 50 | GRV RCSD PM LTR & sym (78011000) | SF | 130 | $7.00 | $7.15 |
| 51 | GRV RCSD PVT MRKG 5 (78011025) | LF | 10,244 | $1.00 | $0.66 |
| 52 | GRV RCSD PVT MRKG 10 (78011050) | LF | 633 | $1.00 | $1.32 |
| 53 | GRV RCSD PVT MRKG 13 (78011065) | LF | 51 | $3.25 | $3.30 |
| 54 | GRV RCSD PVT MRKG 25 (78011125) | LF | 104 | $6.75 | $6.60 |
| 55 | Raised refl pavt MKR (78100100) | EACH | 231 | $42.30 | $42.20 |
| 56 | Raised ref PVT MK rem (78300200) | EACH | 231 | $15.00 | $10.37 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.