IDOT contract 61M43 bid tabulation
Sugar Grove, section 25-00038-00-RS. Let by Illinois DOT on June 12, 2026, Kane, District 01. 4 bids received; low bid $692,262 by D. Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 32
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | D. Construction, Inc. | $692,262 | Low |
| 2 | Builders Paving, LLC | $703,188 | +2.0% |
| 3 | Geneva Construction Company | $765,897 | +11% |
| 4 | Curran Contracting Company | $874,971 | +26% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. D. Construction, Inc. | 2. Builders Paving, LLC | 3. Geneva Construction Company | 4. Curran Contracting Company |
|---|---|---|---|---|---|---|---|
| 1 | Prun safety/equip CLR (K1004595) | LS | 1 | $6,270.00 | $3,500.00 | $3,500.00 | $5,700.00 |
| 2 | HMA surf rem SPL (X4400196) | SY | 94 | $20.00 | $15.00 | $15.00 | $20.00 |
| 3 | Change message SN SPL (X7010238) | CAL MO | 12 | $1,500.00 | $1,200.00 | $900.00 | $1,200.00 |
| 4 | Temp info signing (X7200061) | SF | 52 | $30.00 | $20.00 | $18.00 | $20.00 |
| 5 | Construction layout (Z0013798) | LS | 1 | $2,500.00 | $6,500.00 | $1,000.00 | $2,500.00 |
| 6 | Inlet filters (28000510) | EACH | 2 | $300.00 | $50.00 | $250.00 | $300.00 |
| 7 | Bit matls tack CT (40600290) | LB | 17,531 | $0.01 | $0.01 | $0.01 | $1.00 |
| 8 | Long joint sealant (40600370) | LF | 9,494 | $2.81 | $2.95 | $2.60 | $2.50 |
| 9 | Mix CR JTS flangewys (40600400) | TON | 20 | $0.01 | $680.00 | $150.00 | $300.00 |
| 10 | HMA surf rem butt JT (40600982) | SY | 55 | $25.00 | $15.00 | $13.00 | $20.00 |
| 11 | HMA BC IL-19.0 N50 (40603080) | TON | 3,273 | $72.00 | $72.00 | $83.75 | $77.00 |
| 12 | HMA SC IL-9.5 D N50 (40604060) | TON | 2,182 | $77.00 | $75.00 | $88.75 | $87.00 |
| 13 | Bit matls tack CT (40800029) | LB | 258 | $0.01 | $0.01 | $0.01 | $1.00 |
| 14 | Incidental HMA surf (40800050) | TON | 38 | $100.00 | $225.00 | $155.00 | $300.00 |
| 15 | HMA surf rem 3 1/2 (44000163) | SY | 25,856 | $2.80 | $3.50 | $3.95 | $5.15 |
| 16 | CL D patch T1 6 (44201713) | SY | 150 | $67.00 | $60.00 | $56.00 | $265.00 |
| 17 | CL D patch T2 6 (44201717) | SY | 150 | $67.00 | $60.00 | $56.00 | $155.00 |
| 18 | CL D patch T3 6 (44201721) | SY | 150 | $62.00 | $60.00 | $56.00 | $115.00 |
| 19 | Aggregate SHLDS B (48101200) | TON | 681 | $32.00 | $38.00 | $38.00 | $40.00 |
| 20 | Mobilization (67100100) | LS | 1 | $41,000 | $43,203 | $45,000 | $50,000 |
| 21 | Traf cont-prot 701201 (70100450) | LS | 1 | $0.01 | $100.00 | $2,173.00 | $100.00 |
| 22 | Traf cont-prot 701306 (70100460) | LS | 1 | $0.01 | $5,000.00 | $2,173.00 | $10,000 |
| 23 | Traf cont-prot 701336 (70100600) | LS | 1 | $0.01 | $100.00 | $2,173.00 | $100.00 |
| 24 | TR cont & prot 701501 (70102620) | LS | 1 | $26,750 | $100.00 | $2,173.00 | $100.00 |
| 25 | Short term pavt mking (70300100) | LF | 2,849 | $0.01 | $0.01 | $0.01 | $0.50 |
| 26 | SHRT TRM pavt MK rem (70300150) | SF | 1,417 | $0.01 | $0.01 | $0.01 | $4.25 |
| 27 | Temp PVT MK L4 T4 tape (70307120) | LF | 4,763 | $0.01 | $0.01 | $1.25 | $1.30 |
| 28 | THPL PVT MK line 4 (78000200) | LF | 26,044 | $0.81 | $0.74 | $0.74 | $0.74 |
| 29 | THPL PVT MK line 24 (78000650) | LF | 37 | $7.15 | $6.50 | $5.25 | $6.50 |
| 30 | GRV RCSD PVT MRKG 5 (78011025) | LF | 4,088 | $0.64 | $0.58 | $1.25 | $0.58 |
| 31 | Raised refl pavt MKR (78100100) | EACH | 142 | $64.85 | $58.95 | $49.00 | $58.95 |
| 32 | Raised ref PVT MK rem (78300200) | EACH | 142 | $8.00 | $25.00 | $7.64 | $15.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.