IDOT contract 78A13 bid tabulation
Section D9. Let by Illinois DOT on June 12, 2026, Union, District 09. 2 bids received; low bid $2,686,720 by E. T. Simonds Construction Company.
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 83
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E. T. Simonds Construction Company | $2,686,720 | Low |
| 2 | Samron Midwest Contracting, Inc. | $2,734,148 | +2.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E. T. Simonds Construction Company | 2. Samron Midwest Contracting, Inc. |
|---|---|---|---|---|---|
| 1 | Temp pavt removal (X4400110) | SY | 337 | $32.25 | $40.00 |
| 2 | Island removal (X4402805) | SF | 76 | $21.27 | $5.00 |
| 3 | Memb WTRPRF sys B STR (X5810103) | SY | 300 | $46.99 | $100.00 |
| 4 | Traf cont-prot BLR 21 (X7011800) | LS | 1 | $10,617 | $1,500.00 |
| 5 | Detour signing (X7200203) | LS | 1 | $33,368 | $30,000 |
| 6 | Construction layout (Z0013798) | LS | 1 | $70,715 | $69,000 |
| 7 | Rock fill - foundatn (Z0054517) | TON | 420 | $66.02 | $35.00 |
| 8 | Temp pavement (Z0062456) | SY | 337 | $146.63 | $100.00 |
| 9 | Temp support system (Z0073500) | LS | 1 | $21,145 | $20,000 |
| 10 | Trainees (Z0076600) | HR | 1,000 | $0.80 | $0.80 |
| 11 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 |
| 12 | Tree remov 6-15 (20100110) | UNIT | 26 | $64.31 | $100.00 |
| 13 | Tree remov over 15 (20100210) | UNIT | 153 | $67.64 | $150.00 |
| 14 | Earth excavation (20200100) | CY | 933 | $34.41 | $45.00 |
| 15 | Exc & GR EX shoulder (20200600) | UNIT | 17.60 | $1,509.23 | $725.00 |
| 16 | Furnished excavation (20400800) | CY | 945 | $38.97 | $50.00 |
| 17 | Porous gran embank (20700220) | CY | 1,187 | $66.43 | $50.00 |
| 18 | Seeding CL 2 (25000200) | ACRE | 0.59 | $16,500 | $14,000 |
| 19 | Seeding CL 7 (25000350) | ACRE | 0.59 | $8,277.97 | $8,000.00 |
| 20 | Nitrogen fert nutr (25000400) | LB | 55 | $6.51 | $2.00 |
| 21 | Phosphorus fert nutr (25000500) | LB | 55 | $6.51 | $2.00 |
| 22 | Potassium fert nutr (25000600) | LB | 55 | $6.51 | $2.00 |
| 23 | Agr ground limestone (25000700) | TON | 1.18 | $4,263.43 | $600.00 |
| 24 | Mulch method 2 (25100115) | ACRE | 0.59 | $12,976 | $1,800.00 |
| 25 | Erosion contr blanket (25100630) | SY | 3,007 | $2.39 | $1.00 |
| 26 | Temp eros contr seed (28000250) | LB | 118 | $6.98 | $5.00 |
| 27 | Temp ditch checks (28000305) | LF | 170 | $26.75 | $10.00 |
| 28 | Perimeter eros bar (28000400) | LF | 2,211 | $6.48 | $4.00 |
| 29 | Inlet & pipe protect (28000500) | EACH | 1 | $299.27 | $70.00 |
| 30 | Stone riprap CL A4 (28100107) | SY | 23 | $77.68 | $65.00 |
| 31 | Stone riprap CL A5 (28100109) | SY | 494 | $62.98 | $90.00 |
| 32 | Filter fabric (28200200) | SY | 517 | $4.52 | $5.00 |
| 33 | Welded wire reinf (42000060) | SY | 692 | $21.98 | $15.00 |
| 34 | PCC PVT 10 (42000500) | SY | 692 | $203.08 | $170.00 |
| 35 | Pavement rem (44000100) | SY | 737 | $52.95 | $36.00 |
| 36 | Paved SHLD removal (44004250) | SY | 391 | $26.52 | $10.00 |
| 37 | Aggregate SHLDS B 8 (48101600) | SY | 338 | $38.36 | $35.00 |
| 38 | PCC shoulders 8 (48300300) | SY | 72 | $277.11 | $65.00 |
| 39 | PCC shoulders 10 (48300500) | SY | 751 | $145.07 | $135.00 |
| 40 | Rem exist struct N1 (50100300) | EACH | 1 | $143,303 | $40,000 |
| 41 | Rem exist struct N2 (50100400) | EACH | 1 | $113,947 | $40,000 |
| 42 | Rem exist struct N3 (50100500) | EACH | 1 | $8,316.34 | $20,000 |
| 43 | Rem exist struct N4 (50100600) | EACH | 1 | $8,316.34 | $20,000 |
| 44 | Pipe culvert remov (50105220) | LF | 34 | $21.42 | $15.00 |
| 45 | Structure excavation (50200100) | CY | 841 | $48.05 | $25.00 |
| 46 | Rem/disp uns matl-STR (50200450) | CY | 348 | $44.28 | $20.00 |
| 47 | Reinforcement bars (50800105) | LB | 48,450 | $1.79 | $1.60 |
| 48 | Reinf bars, epoxy CTD (50800205) | LB | 30,730 | $1.96 | $1.80 |
| 49 | Bar splicers (50800515) | EACH | 254 | $37.76 | $40.00 |
| 50 | Name plates (51500100) | EACH | 2 | $1,479.85 | $1,000.00 |
| 51 | Temp soil reten systm (52200020) | SF | 1,130 | $2.41 | $275.00 |
| 52 | Geotex retain wall (52200600) | SF | 74 | $164.24 | $100.00 |
| 53 | Box cul end sec C3 (54001003) | EACH | 2 | $26,599 | $20,000 |
| 54 | Box cul end sec C4 (54001004) | EACH | 2 | $26,599 | $20,000 |
| 55 | Conc box cul (54003000) | CY | 427.80 | $1,357.22 | $1,450.00 |
| 56 | PCBC 6X5 (54010605) | LF | 90 | $925.71 | $1,500.00 |
| 57 | P cul CL D 1 15 (542D0220) | LF | 36 | $74.62 | $60.00 |
| 58 | Metal FL end sec 15" (54262715) | EACH | 2 | $325.64 | $600.00 |
| 59 | Geocomposite wall DR (59100100) | SY | 300 | $25.21 | $20.00 |
| 60 | Comb CC&G TM6.06 (60608600) | LF | 14.50 | $78.24 | $150.00 |
| 61 | Comb CC&G TM6.24 (60610400) | LF | 32.50 | $90.90 | $150.00 |
| 62 | Conc median surf 4 (60618300) | SF | 101 | $29.61 | $20.00 |
| 63 | Guardrail remov (63200310) | LF | 536 | $10.52 | $10.00 |
| 64 | Fur erect row markers (66600105) | EACH | 12 | $278.35 | $400.00 |
| 65 | Mobilization (67100100) | LS | 1 | $222,584 | $246,000 |
| 66 | Traf cont-prot 701321 (70100405) | EACH | 2 | $24,948 | $15,000 |
| 67 | Traf cont-prot 701201 (70100450) | LS | 1 | $20,154 | $1,000.00 |
| 68 | Traf cont-prot 701326 (70100500) | LS | 1 | $13,521 | $0.01 |
| 69 | TR cont surveillance (70103815) | CAL DAY | 20 | $0.01 | $0.01 |
| 70 | Temp BR traf signals (70106500) | EACH | 2 | $43,120 | $40,000 |
| 71 | Temp rumble strips (70106700) | EACH | 12 | $1,333.67 | $1,500.00 |
| 72 | Changeable message SN (70107025) | CAL DAY | 128 | $87.38 | $100.00 |
| 73 | Temp conc barrier (70400100) | LF | 687.50 | $25.68 | $40.00 |
| 74 | Pin temp conc barrier (70400125) | EACH | 117 | $33.27 | $25.00 |
| 75 | Rel temp conc barrier (70400200) | LF | 487.50 | $8.57 | $10.00 |
| 76 | Imp attn temp NRD TL3 (70600250) | EACH | 1 | $3,749.78 | $5,000.00 |
| 77 | Imp attn temp NRN TL3 (70600251) | EACH | 6 | $3,750.04 | $5,000.00 |
| 78 | Imp attn rel NRD TL3 (70600350) | EACH | 1 | $1,150.71 | $500.00 |
| 79 | Imp attn rel NRN TL3 (70600352) | EACH | 6 | $1,150.71 | $500.00 |
| 80 | Paint PVT MK line 4 (78001110) | LF | 4,841 | $1.80 | $2.00 |
| 81 | Paint PVT MK line 24 (78001180) | LF | 40 | $10.86 | $12.00 |
| 82 | PVT MKG rem grinding (78300201) | SF | 1,534 | $6.05 | $6.00 |
| 83 | Uninter power sup ext (86200300) | EACH | 2 | $3,520.00 | $4,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way