IDOT contract 68K18 bid tabulation
Section 11RS-13. Let by Illinois DOT on June 12, 2026, Tazewell, District 04. 1 bid received; low bid $3,147,460 by R. A. Cullinan and Son, a div of UCM, Inc..
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 85
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | R. A. Cullinan and Son, a div of UCM, Inc. | $3,147,460 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. R. A. Cullinan and Son, a div of UCM, Inc. |
|---|---|---|---|---|
| 1 | Constr sta layout (XZ013798) | LS | 1 | $4,789.00 |
| 2 | Island pavement rem (X4402800) | SY | 9 | $513.71 |
| 3 | Partial depth patch (X4421000) | TON | 138 | $821.70 |
| 4 | Part depth patch SPL (X4421002) | SY | 408 | $158.26 |
| 5 | Drop structure 1 (X5400101) | EACH | 1 | $41,800 |
| 6 | Water valves adj SPL (X5619210) | EACH | 4 | $4,303.75 |
| 7 | Inlets TG-1 DBL (SPL) (X6020065) | EACH | 1 | $23,959 |
| 8 | Inlets TA W/SPL F&G (X6023508) | EACH | 1 | $7,632.67 |
| 9 | Man adjust SPL (X6025600) | EACH | 11 | $6,569.38 |
| 10 | Inl recon new F&G SPL (X6026108) | EACH | 1 | $14,473 |
| 11 | Inlets adjust SPL (X6026200) | EACH | 5 | $7,226.55 |
| 12 | Conc median SPL (X6060714) | SF | 44 | $172.45 |
| 13 | Conc gutter TA SPL (X6062700) | LF | 887 | $104.51 |
| 14 | Traf cont & prot SPL (X7010216) | LS | 1 | $62,689 |
| 15 | Change message SN SPL (X7010238) | CAL MO | 16 | $1,320.00 |
| 16 | Construction layout (Z0013798) | LS | 1 | $24,601 |
| 17 | Tubular marker (Z0024475) | EACH | 80 | $110.00 |
| 18 | Trainees (Z0076600) | HR | 500 | $0.80 |
| 19 | Trainees TPG (Z0076604) | HR | 500 | $15.00 |
| 20 | Stone dump rip CL A4 (28100707) | SY | 216 | $162.80 |
| 21 | Filter fabric (28200200) | SY | 216 | $3.85 |
| 22 | Agg base cse B 4 (35101600) | SY | 590 | $40.49 |
| 23 | PCC base cse W 11 (35400510) | SY | 197 | $139.35 |
| 24 | P bit matls tack CT (40600295) | LB | 44,418 | $2.86 |
| 25 | Matl transfer device (40600405) | TON | 5,427 | $6.29 |
| 26 | HMA surf rem butt JT (40600982) | SY | 390 | $96.30 |
| 27 | Temporary ramp (40600990) | SY | 335 | $13.80 |
| 28 | P HMA BC IL-9.5 N50 (40603205) | TON | 745 | $277.56 |
| 29 | HMA SC IL-9.5 E N70 (40604072) | TON | 255 | $206.85 |
| 30 | P HMA SC IL-9.5 D N50 (40604160) | TON | 430 | $413.91 |
| 31 | P HMA SC IL-9.5 E N70 (40604172) | TON | 3,732 | $183.60 |
| 32 | PC conc sidewalk 4 (42400100) | SF | 311 | $45.01 |
| 33 | Detectable warnings (42400800) | SF | 44 | $51.43 |
| 34 | Pavement rem (44000100) | SY | 6 | $175.76 |
| 35 | HMA surf rem 1 1/2 (44000155) | SY | 44,895 | $5.28 |
| 36 | HMA surf rem 3 3/4 (44000164) | SY | 7,427 | $12.67 |
| 37 | Gutter rem (44000400) | LF | 885 | $23.95 |
| 38 | Comb curb gutter rem (44000500) | LF | 25 | $106.06 |
| 39 | Sidewalk rem (44000600) | SF | 258 | $14.69 |
| 40 | Paved SHLD removal (44004250) | SY | 4 | $155.90 |
| 41 | CL D patch T2 14 (44201815) | SY | 70 | $824.10 |
| 42 | CL D patch T4 14 (44201821) | SY | 27 | $742.22 |
| 43 | Tie bars 3/4 (44213204) | EACH | 886 | $31.30 |
| 44 | HMA shoulders (48203100) | TON | 265 | $283.55 |
| 45 | Conc rem (50102400) | CY | 4.30 | $2,860.00 |
| 46 | Pipe culvert remov (50105220) | LF | 61 | $36.30 |
| 47 | P cul CL A 1 eqrs 24 (542A5479) | LF | 54 | $233.20 |
| 48 | End sec eqv R-S 24 (54214299) | EACH | 2 | $3,344.00 |
| 49 | Concrete collar (54248510) | CY | 0.50 | $7,370.00 |
| 50 | Storm sew CL A 1 12 (550A0050) | LF | 18 | $101.20 |
| 51 | Storm sew CL A 1 30 (550A0140) | LF | 22 | $353.10 |
| 52 | CB TA 4 dia T1F CL (60200205) | EACH | 1 | $8,800.00 |
| 53 | Class SI conc outlet (60600095) | CY | 2.60 | $2,244.59 |
| 54 | Comb CC&G TB6.06 (60603500) | LF | 17 | $285.90 |
| 55 | Comb CC&G TB6.18 (60604400) | LF | 7 | $616.40 |
| 56 | Comb CC&G TY B-6.24 (60605000) | LF | 25 | $275.92 |
| 57 | Box cul to BE cleaned (60905305) | LF | 10 | $162.80 |
| 58 | Shoulder rum strip 8 (64200108) | LF | 7,410 | $0.73 |
| 59 | Engr field office A (67000400) | CAL MO | 5 | $2,443.17 |
| 60 | Mobilization (67100100) | LS | 1 | $194,483 |
| 61 | Traf cont-prot 701423 (70100325) | EACH | 1 | $29,600 |
| 62 | Short term pavt mking (70300100) | LF | 1,860 | $3.37 |
| 63 | SHRT TRM pavt MK rem (70300150) | SF | 620 | $10.81 |
| 64 | Temp PVT MK LTR & sym paint (70300211) | SF | 500 | $2.75 |
| 65 | Temp PVT MK line 4 - paint (70300221) | LF | 14,086 | $0.28 |
| 66 | Temp PVT MK line 6 - paint (70300241) | LF | 14,680 | $0.41 |
| 67 | Temp PVT MK line 8 - paint (70300251) | LF | 3,374 | $0.55 |
| 68 | Temp PVT MK line 12 - paint (70300261) | LF | 608 | $0.83 |
| 69 | Temp PVT MK line 24 - paint (70300281) | LF | 312 | $2.48 |
| 70 | Temp conc barrier (70400100) | LF | 1,250 | $71.23 |
| 71 | Imp attn temp NRD TL3 (70600250) | EACH | 1 | $8,192.98 |
| 72 | Polyurea PM T2 LTR-SY (78008300) | SF | 500 | $4.95 |
| 73 | Polyurea PM T2 LN 4 (78008310) | LF | 14,086 | $1.21 |
| 74 | Polyurea PM T2 LN 6 (78008330) | LF | 14,680 | $1.82 |
| 75 | Polyurea PM T2 LN 8 (78008340) | LF | 3,374 | $2.42 |
| 76 | Polyurea PM T2 LN 12 (78008350) | LF | 608 | $3.63 |
| 77 | Polyurea PM T2 LN 24 (78008370) | LF | 312 | $7.26 |
| 78 | GRV RCSD PM LTR & sym (78011000) | SF | 701 | $4.79 |
| 79 | GRV RCSD PVT MRKG 5 (78011025) | LF | 14,086 | $0.50 |
| 80 | GRV RCSD PVT MRKG 7 (78011035) | LF | 14,680 | $0.74 |
| 81 | GRV RCSD PVT MRKG 9 (78011045) | LF | 3,374 | $0.99 |
| 82 | GRV RCSD PVT MRKG 13 (78011065) | LF | 608 | $2.75 |
| 83 | GRV RCSD PVT MRKG 25 (78011125) | LF | 312 | $6.05 |
| 84 | Raised refl pavt MKR (78100100) | EACH | 173 | $47.86 |
| 85 | Raised ref PVT MK rem (78300200) | EACH | 173 | $54.28 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.