IDOT contract 80B33 bid tabulation
Section 2025-2014-RS. Let by Illinois DOT on June 12, 2026, Cook, District 01. 3 bids received; low bid $933,943 by D. Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 72
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | D. Construction, Inc. | $933,943 | Low |
| 2 | Gallagher Asphalt Corporation | $986,378 | +6.0% |
| 3 | K-Five Construction Corporation | $989,462 | +6.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. D. Construction, Inc. | 2. Gallagher Asphalt Corporation | 3. K-Five Construction Corporation |
|---|---|---|---|---|---|---|
| 1 | Constructn layout SPL (X0320050) | LS | 1 | $10,000 | $4,200.00 | $7,500.00 |
| 2 | Grading & shap SHLDRS (X2020110) | UNIT | 55.20 | $125.00 | $527.00 | $100.00 |
| 3 | Temp access- com ent (X4022000) | EACH | 3 | $55.00 | $686.00 | $50.00 |
| 4 | CC&G RMVL repl < = 10 (X4400501) | LF | 56 | $71.50 | $69.00 | $75.00 |
| 5 | CC&G RMVL repl > 10FT (X4400503) | LF | 322 | $60.50 | $69.00 | $57.45 |
| 6 | SS cleaned 12 (X5537800) | LF | 150 | $6.60 | $3.00 | $10.00 |
| 7 | FR & lids adjust SPL (X6030310) | EACH | 9 | $1,000.00 | $1,300.00 | $1,985.00 |
| 8 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $4,500.00 | $500.00 | $3,500.00 |
| 9 | Temp info signing (X7200061) | SF | 184 | $30.00 | $30.00 | $30.00 |
| 10 | Det loop repl (X8860105) | LF | 237 | $40.37 | $36.70 | $36.70 |
| 11 | Drainage STR cleaned (Z0018500) | EACH | 10 | $462.00 | $450.00 | $500.00 |
| 12 | Earth excavation (20200100) | CY | 750 | $45.00 | $60.00 | $80.00 |
| 13 | Rem & disp uns matl (20201200) | CY | 83 | $40.00 | $65.00 | $55.00 |
| 14 | Geotech fab F/GR stab (21001000) | SY | 249 | $5.00 | $2.00 | $5.00 |
| 15 | Topsoil F & P var DP (21101600) | SY | 513 | $11.00 | $12.50 | $10.00 |
| 16 | Sodding salt tolerant (25200110) | SY | 513 | $33.00 | $12.50 | $30.00 |
| 17 | Supple watering (25200200) | UNIT | 7.70 | $55.00 | $446.00 | $50.00 |
| 18 | Agg subgrade improve (30300001) | CY | 83 | $60.00 | $79.40 | $75.00 |
| 19 | Agg subgrade impr 12 (30300112) | SY | 994 | $26.00 | $28.55 | $55.00 |
| 20 | Sub gran mat B 4 (31101200) | SY | 108 | $19.80 | $13.60 | $12.00 |
| 21 | HMA base cse 6 (35501308) | SY | 14 | $100.00 | $120.65 | $250.00 |
| 22 | HMA BC wid 7 (35600704) | SY | 994 | $46.00 | $48.30 | $42.20 |
| 23 | Bit matls PR CT (40600275) | LB | 2,236 | $0.01 | $0.01 | $0.01 |
| 24 | Bit matls tack CT (40600290) | LB | 12,746 | $0.01 | $0.01 | $0.01 |
| 25 | Long joint sealant (40600370) | LF | 5,662 | $3.99 | $3.80 | $3.25 |
| 26 | Mix CR JTS flangewys (40600400) | TON | 27 | $0.01 | $239.35 | $50.00 |
| 27 | HMA surf rem butt JT (40600982) | SY | 57 | $25.00 | $0.01 | $25.00 |
| 28 | HMA repl over patch (40601005) | TON | 43 | $0.01 | $186.00 | $245.00 |
| 29 | P HMA BC IL-4.75 N50 (40603200) | TON | 1,039 | $103.00 | $127.00 | $105.00 |
| 30 | HMA SC IL-9.5 D N50 (40604060) | TON | 2 | $0.01 | $367.00 | $775.00 |
| 31 | HMA SC IL-9.5 D N70 (40604062) | TON | 2,115 | $83.50 | $94.00 | $90.00 |
| 32 | Protective coat (42001300) | SY | 788 | $1.10 | $1.15 | $0.01 |
| 33 | PCC driveway pavt 8 (42300400) | SY | 108 | $148.50 | $83.00 | $91.25 |
| 34 | PC conc sidewalk 5 (42400200) | SF | 5,362 | $11.00 | $7.10 | $9.25 |
| 35 | Detectable warnings (42400800) | SF | 203 | $33.00 | $20.00 | $25.50 |
| 36 | HMA surf rem 3 (44000161) | SY | 17,889 | $2.75 | $5.50 | $3.25 |
| 37 | Sidewalk rem (44000600) | SF | 5,437 | $2.75 | $2.70 | $2.75 |
| 38 | HMA RM OV patch 3 (44002212) | SY | 252 | $0.01 | $55.00 | $1.50 |
| 39 | CL D patch T2 9 (44201753) | SY | 80 | $90.00 | $100.00 | $124.00 |
| 40 | CL D patch T3 9 (44201757) | SY | 48 | $90.00 | $100.00 | $124.00 |
| 41 | CL D patch T4 9 (44201759) | SY | 95 | $90.00 | $100.00 | $124.00 |
| 42 | Agg wedge SHLD type B (48102100) | TON | 157 | $40.00 | $65.00 | $85.00 |
| 43 | CB adjust (60250200) | EACH | 6 | $750.00 | $615.00 | $550.00 |
| 44 | CB reconst (60252800) | EACH | 1 | $1,500.00 | $1,400.00 | $1,850.00 |
| 45 | FR & grates adjust (60300105) | EACH | 2 | $800.00 | $345.00 | $550.00 |
| 46 | FR & lids adjust (60300305) | EACH | 2 | $800.00 | $345.00 | $850.00 |
| 47 | FR & lids T1 OL (60406000) | EACH | 3 | $600.00 | $360.00 | $685.00 |
| 48 | Pipe culv cleaned 12 (60920012) | LF | 60 | $13.20 | $3.00 | $10.00 |
| 49 | Non SPL waste disposl (66900200) | CY | 750 | $80.00 | $71.75 | $85.00 |
| 50 | Soil disposal analy (66900530) | EACH | 4 | $1,650.00 | $975.00 | $975.00 |
| 51 | Reg sub P-const plan (66901001) | LS | 1 | $2,250.00 | $5,300.00 | $5,300.00 |
| 52 | Reg sub F con report (66901003) | LS | 1 | $2,250.00 | $500.00 | $500.00 |
| 53 | Reg sub mon (66901006) | CAL DAY | 4 | $1,000.00 | $715.00 | $715.00 |
| 54 | Mobilization (67100100) | LS | 1 | $37,200 | $59,176 | $38,450 |
| 55 | TR cont & prot 701501 (70102620) | LS | 1 | $42,170 | $3,500.00 | $3,500.00 |
| 56 | TR cont & prot 701602 (70102632) | LS | 1 | $0.01 | $50.00 | $50.00 |
| 57 | TR cont & prot 701701 (70102635) | LS | 1 | $0.01 | $50.00 | $50.00 |
| 58 | TR cont & prot 701801 (70102640) | LS | 1 | $0.01 | $500.00 | $500.00 |
| 59 | Short term pavt mking (70300100) | LF | 1,540 | $0.01 | $0.01 | $1.00 |
| 60 | SHRT TRM pavt MK rem (70300150) | SF | 129 | $0.01 | $0.01 | $2.00 |
| 61 | Temp PVT MK line 4 - paint (70300221) | LF | 23,958 | $0.01 | $0.01 | $0.40 |
| 62 | Temp PVT MK line 8 - paint (70300251) | LF | 230 | $0.01 | $0.01 | $0.40 |
| 63 | Temp PVT MK line 12 - paint (70300261) | LF | 1,060 | $0.01 | $0.01 | $1.50 |
| 64 | Temp PVT MK line 24 - paint (70300281) | LF | 216 | $0.01 | $0.01 | $2.00 |
| 65 | Temp PVT MK L4 T4 tape (70307120) | LF | 385 | $0.01 | $0.01 | $1.40 |
| 66 | Remov sign panel T1 (72400310) | SF | 13 | $25.00 | $50.00 | $50.00 |
| 67 | THPL PVT MK line 4 (78000200) | LF | 11,979 | $0.88 | $0.75 | $0.75 |
| 68 | THPL PVT MK line 8 (78000500) | LF | 115 | $1.65 | $1.55 | $1.55 |
| 69 | THPL PVT MK line 12 (78000600) | LF | 530 | $2.75 | $2.50 | $2.50 |
| 70 | THPL PVT MK line 24 (78000650) | LF | 108 | $5.50 | $5.00 | $5.00 |
| 71 | Raised refl pavt MKR (78100100) | EACH | 128 | $52.80 | $50.00 | $50.00 |
| 72 | Raised ref PVT MK rem (78300200) | EACH | 128 | $8.00 | $0.01 | $40.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.