IDOT contract 62X28 bid tabulation
Section (FXB-1R). Let by Illinois DOT on June 12, 2026, Will, District 01. 3 bids received; low bid $248,599 by D. Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 27
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | D. Construction, Inc. | $248,599 | Low |
| 2 | Herlihy Mid-Continent Company | $331,246 | +33% |
| 3 | MYS, Incorporated | $374,769 | +51% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. D. Construction, Inc. | 2. Herlihy Mid-Continent Company | 3. MYS, Incorporated |
|---|---|---|---|---|---|---|
| 1 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 6 | $5,000.00 | $5,250.00 | $4,000.00 |
| 2 | Temp info signing (X7200061) | SF | 52 | $30.00 | $25.00 | $40.00 |
| 3 | Construction layout (Z0013798) | LS | 1 | $7,500.00 | $6,200.00 | $1,500.00 |
| 4 | Polymer concrete (Z0041895) | CF | 9 | $2,000.00 | $4,500.00 | $2,500.00 |
| 5 | Topsoil F & P var DP (21101600) | SY | 23 | $5.50 | $60.00 | $100.00 |
| 6 | Seeding CL 4B (25000314) | ACRE | 0.10 | $5,324.00 | $20,000 | $15,000 |
| 7 | Nitrogen fert nutr (25000400) | LB | 3 | $3.30 | $10.00 | $25.00 |
| 8 | Potassium fert nutr (25000600) | LB | 3 | $3.30 | $10.00 | $25.00 |
| 9 | Erosion contr blanket (25100630) | SY | 23 | $165.00 | $25.00 | $20.00 |
| 10 | Aggregate SHLDS B (48101200) | TON | 3 | $500.00 | $50.00 | $300.00 |
| 11 | Conc rem (50102400) | CY | 3 | $5,000.00 | $2,875.00 | $4,150.00 |
| 12 | Structure excavation (50200100) | CY | 6 | $350.00 | $100.00 | $550.00 |
| 13 | Conc struct (50300225) | CY | 2 | $7,500.00 | $8,500.00 | $14,500 |
| 14 | Protective coat (50300300) | SY | 36 | $1.50 | $6.00 | $5.00 |
| 15 | Reinf bars, epoxy CTD (50800205) | LB | 600 | $10.00 | $11.00 | $10.00 |
| 16 | Pref joint seal 2 (52000025) | LF | 79 | $275.00 | $515.00 | $241.00 |
| 17 | STR rep con DP = < 5 (53212754) | SF | 151 | $200.00 | $369.00 | $300.00 |
| 18 | STR rep con DP over 5 (53212755) | SF | 80 | $250.00 | $650.00 | $450.00 |
| 19 | SPBGR TY A 6FT posts (63000001) | LF | 75 | $34.00 | $34.00 | $46.00 |
| 20 | LSG OV cul 12'6" span (63000350) | LF | 75 | $48.00 | $48.00 | $50.00 |
| 21 | TR bar TRM T1 SPL tan (63100167) | EACH | 4 | $3,730.00 | $3,730.00 | $4,000.00 |
| 22 | Guardrail remov (63200310) | LF | 302 | $8.00 | $8.00 | $10.00 |
| 23 | Mobilization (67100100) | LS | 1 | $13,725 | $19,000 | $86,000 |
| 24 | Traf cont-prot 701201 (70100450) | LS | 1 | $32,500 | $18,400 | $50,000 |
| 25 | Terminal marker - DA (72501000) | EACH | 4 | $55.00 | $50.00 | $50.00 |
| 26 | Mod ureth PM line 4 (78009004) | LF | 20 | $269.50 | $245.00 | $280.00 |
| 27 | Grdrail ref type B (78200006) | EACH | 6 | $27.50 | $25.00 | $15.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.