IDOT contract 68898 bid tabulation
Section (10R-VBY)BR. Let by Illinois DOT on August 1, 2025, Peoria, District 04. 2 bids received; low bid $23,160,000 by ICC Group Inc..
- Owner
- Illinois DOT
- Letting
- 01 AUG 2025
- Pay items
- 152
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | ICC Group Inc. | $23,160,000 | Low |
| 2 | William Charles Construction Company, LLC | $23,396,000 | +1.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. ICC Group Inc. | 2. William Charles Construction Company, LLC |
|---|---|---|---|---|---|
| 1 | Weed cont broadlf TRF (K0029618) | GAL | 1 | $3,500.00 | $1,500.00 |
| 2 | Cros sonic log A duct (X0320051) | LF | 1,024 | $117.25 | $60.00 |
| 3 | Cros sonic log test (X0320052) | EACH | 6 | $3,000.00 | $2,000.00 |
| 4 | Rem & rel SN P&P assy (X2600012) | EACH | 4 | $475.00 | $175.00 |
| 5 | HLMRB disc G exp 500K (X5211625) | EACH | 22 | $7,000.00 | $5,600.00 |
| 6 | Drainage scuppr DS-11 (X5230174) | EACH | 3 | $3,250.00 | $3,500.00 |
| 7 | Drainage scuppr DS-12 (X5230176) | EACH | 28 | $2,950.00 | $3,000.00 |
| 8 | Cur-in-PL pipe LNR 36 (X5430236) | LF | 102 | $406.00 | $550.00 |
| 9 | Inlets TA W/SPL F&G (X6023508) | EACH | 1 | $5,200.76 | $5,000.00 |
| 10 | Sanitary manhole adj (X6026050) | EACH | 1 | $1,600.00 | $1,500.00 |
| 11 | Flex delineators (X6350108) | EACH | 4 | $150.00 | $250.00 |
| 12 | Traf cont & prot SPL (X7010218) | EACH | 1 | $75,000 | $50,000 |
| 13 | Handhole to BE adjust (X8140115) | EACH | 1 | $4,083.14 | $4,083.14 |
| 14 | GDRL agg eros cont (Z0001002) | TON | 101 | $107.00 | $100.00 |
| 15 | Construction layout (Z0013798) | LS | 1 | $285,000 | $75,000 |
| 16 | RR prot liability ins (Z0048665) | LS | 1 | $20,512 | $20,000 |
| 17 | SS 2 wat MN 36 (Z0056678) | LF | 282 | $283.00 | $250.00 |
| 18 | Trainees (Z0076600) | HR | 5,000 | $0.80 | $0.80 |
| 19 | Trainees TPG (Z0076604) | HR | 5,000 | $15.00 | $15.00 |
| 20 | Tree remov 6-15 (20100110) | UNIT | 222 | $40.00 | $50.00 |
| 21 | Tree remov over 15 (20100210) | UNIT | 66 | $60.00 | $90.00 |
| 22 | Tree remov acres (20100500) | ACRE | 0.25 | $25,000 | $25,000 |
| 23 | Earth excavation (20200100) | CY | 3,604 | $27.50 | $40.00 |
| 24 | Furnished excavation (20400800) | CY | 25,354 | $42.00 | $55.00 |
| 25 | Trench backfill (20800150) | CY | 8 | $130.00 | $125.00 |
| 26 | Topsoil F & P 4 (21101615) | SY | 6,275 | $7.50 | $6.00 |
| 27 | Seeding CL 3A (25000305) | ACRE | 4 | $5,000.00 | $5,000.00 |
| 28 | Nitrogen fert nutr (25000400) | LB | 360 | $2.00 | $2.00 |
| 29 | Phosphorus fert nutr (25000500) | LB | 360 | $2.00 | $2.00 |
| 30 | Potassium fert nutr (25000600) | LB | 360 | $2.00 | $2.00 |
| 31 | Mulch method 2 (25100115) | ACRE | 4 | $800.00 | $800.00 |
| 32 | Erosion contr blanket (25100630) | SY | 3,025 | $2.25 | $2.25 |
| 33 | Temp eros contr seed (28000250) | LB | 1,200 | $3.00 | $3.00 |
| 34 | Temp ditch checks (28000305) | LF | 113 | $20.00 | $25.00 |
| 35 | Perimeter eros bar (28000400) | LF | 998 | $4.00 | $5.50 |
| 36 | Inlet & pipe protect (28000500) | EACH | 6 | $200.00 | $330.00 |
| 37 | Stone riprap CL A4 (28100107) | SY | 1,333 | $80.00 | $100.00 |
| 38 | Stone riprap CL A6 (28100111) | SY | 1,206 | $135.00 | $200.00 |
| 39 | Stone dump rip CL B4 (28100830) | TON | 796 | $106.00 | $100.00 |
| 40 | Filter fabric (28200200) | SY | 3,733 | $3.00 | $3.00 |
| 41 | Agg base cse A 8 (35100700) | SY | 889 | $35.00 | $25.00 |
| 42 | Bit matls PR CT (40600275) | LB | 2,000 | $2.50 | $1.63 |
| 43 | P bit matls tack CT (40600295) | LB | 7,590 | $1.65 | $2.82 |
| 44 | Matl transfer device (40600405) | TON | 2,365 | $15.00 | $7.59 |
| 45 | HMA surf rem butt JT (40600982) | SY | 1,267 | $17.50 | $19.91 |
| 46 | HMA BC IL-19.0 N50 (40603080) | TON | 2,011 | $149.00 | $162.68 |
| 47 | HMA SC IL-9.5 D N50 (40604060) | TON | 354 | $196.00 | $195.58 |
| 48 | PVT con PCC BR app SL (42000080) | SY | 318 | $165.00 | $300.00 |
| 49 | Pavement rem (44000100) | SY | 216 | $30.00 | $90.00 |
| 50 | Comb curb gutter rem (44000500) | LF | 1,192 | $12.00 | $15.00 |
| 51 | Aggregate SHLDS B (48101200) | TON | 501 | $50.00 | $70.00 |
| 52 | Rem exist struct N1 (50100300) | EACH | 1 | $1,049,370 | $1,273,324 |
| 53 | Rem exist struct N2 (50100400) | EACH | 1 | $5,250.00 | $5,000.00 |
| 54 | Pipe culvert remov (50105220) | LF | 314 | $28.00 | $25.00 |
| 55 | Protective shield (50157300) | SY | 1,795 | $1.00 | $0.01 |
| 56 | Structure excavation (50200100) | CY | 417 | $75.00 | $50.00 |
| 57 | Conc struct (50300225) | CY | 995.30 | $1,360.00 | $1,300.00 |
| 58 | Conc sup-STR (50300255) | CY | 1,550.20 | $1,200.00 | $1,400.00 |
| 59 | BR deck grooving (50300260) | SY | 5,014 | $6.50 | $6.00 |
| 60 | Concrete encasement (50300280) | CY | 18.60 | $1,280.00 | $1,200.00 |
| 61 | Protective coat (50300300) | SY | 6,972 | $2.00 | $2.00 |
| 62 | Conc supstr app slab (50301350) | CY | 218.50 | $500.00 | $600.00 |
| 63 | F & E struct steel (50500105) | LS | 1 | $8,936,000 | $8,915,000 |
| 64 | Stud shear connectors (50500505) | EACH | 16,940 | $5.50 | $4.75 |
| 65 | Reinforcement bars (50800105) | LB | 95,080 | $1.80 | $2.50 |
| 66 | Reinf bars, epoxy CTD (50800205) | LB | 695,750 | $1.50 | $1.80 |
| 67 | Bar splicers (50800515) | EACH | 504 | $70.00 | $50.00 |
| 68 | Bicycle railing, curved (50901735) | LF | 678 | $285.75 | $320.00 |
| 69 | Parapet railing (50901750) | LF | 708 | $111.25 | $150.00 |
| 70 | Slope wall 4 (51100100) | SY | 400 | $225.00 | $250.00 |
| 71 | Fur STL pile HP14X73 (51201800) | LF | 1,472 | $85.00 | $125.00 |
| 72 | Driving piles (51202305) | LF | 1,472 | $0.10 | $0.01 |
| 73 | Test pile ST HP14X73 (51203800) | EACH | 2 | $11,500 | $8,000.00 |
| 74 | Name plates (51500100) | EACH | 1 | $1,250.00 | $1,500.00 |
| 75 | Permanent casing (51602000) | LF | 489 | $625.00 | $600.00 |
| 76 | Drilled shaft in soil (51603000) | CY | 340.70 | $545.00 | $900.00 |
| 77 | Drilled shaft in rock (51604000) | CY | 252.50 | $2,250.00 | $700.00 |
| 78 | Finger PLT exp JT 5 (52000216) | LF | 162 | $3,565.00 | $3,500.00 |
| 79 | Fab reinf elas trough (52000600) | LF | 171 | $975.00 | $500.00 |
| 80 | Elast bearing assy T2 (52100020) | EACH | 22 | $5,650.00 | $4,250.00 |
| 81 | Anchor bolts 1 (52100520) | EACH | 44 | $205.00 | $150.00 |
| 82 | Anchor bolts 1 1/4 (52100530) | EACH | 88 | $295.00 | $200.00 |
| 83 | Anchor bolts 1 1/2 (52100540) | EACH | 22 | $425.00 | $250.00 |
| 84 | Temp soil reten systm (52200020) | SF | 1,617 | $42.00 | $5.00 |
| 85 | Drainage system for structures (52318802) | LS | 1 | $125,000 | $80,000 |
| 86 | P cul CL A 1 36 (542A0241) | LF | 10 | $211.00 | $250.00 |
| 87 | P cul CL D 2 15 (542D1060) | LF | 154 | $40.00 | $50.00 |
| 88 | PRC flar end sec 18 (54213663) | EACH | 3 | $1,500.00 | $1,600.00 |
| 89 | PRC flar end sec 30 (54213675) | EACH | 1 | $2,500.00 | $2,600.00 |
| 90 | PRC flar end sec 36 (54213681) | EACH | 2 | $3,000.00 | $2,900.00 |
| 91 | Storm sew CL A 1 15 (550A0070) | LF | 44 | $92.00 | $100.00 |
| 92 | Storm sew CL A 1 18 (550A0090) | LF | 72 | $96.00 | $100.00 |
| 93 | Storm sew CL A 2 30 (550A0430) | LF | 156 | $139.00 | $125.00 |
| 94 | Storm sew CL A 2 36 (550A0450) | LF | 144 | $162.00 | $160.00 |
| 95 | Storm sew CL A 3 18 (550A0680) | LF | 44 | $98.00 | $100.00 |
| 96 | Water valves adjust (56109210) | EACH | 8 | $800.00 | $1,000.00 |
| 97 | Granular backfill STR (58600101) | CY | 376 | $87.95 | $75.00 |
| 98 | Concrete sealer (58700300) | SF | 2,337 | $2.00 | $2.25 |
| 99 | Geocomposite wall DR (59100100) | SY | 161 | $42.00 | $60.00 |
| 100 | Contr low-streng matl (59300100) | CY | 23.70 | $300.00 | $300.00 |
| 101 | Conc HDWL for P drain (60100060) | EACH | 4 | $700.00 | $600.00 |
| 102 | P undr for struct 4 (60146304) | LF | 230 | $45.00 | $33.00 |
| 103 | Man TA 5 dia T1F CL (60221100) | EACH | 2 | $10,000 | $12,000 |
| 104 | Man TA 6 dia T1F CL (60223800) | EACH | 2 | $15,000 | $15,000 |
| 105 | Inlets TA T3F&G (60235700) | EACH | 4 | $4,500.00 | $4,000.00 |
| 106 | Inlets TB T3F&G (60240220) | EACH | 4 | $4,100.00 | $4,500.00 |
| 107 | Inl recon new T3F&G (60263100) | EACH | 2 | $2,400.00 | $2,000.00 |
| 108 | Remov inlets (60500060) | EACH | 9 | $300.00 | $1,000.00 |
| 109 | Comb CC&G TY B-6.24 (60605000) | LF | 1,061 | $50.00 | $60.00 |
| 110 | SPBGR TY A 6FT posts (63000001) | LF | 462.50 | $29.50 | $40.00 |
| 111 | SPBGR TY A 9FT posts (63000003) | LF | 612.50 | $37.50 | $47.00 |
| 112 | Traf bar term T6 (63100085) | EACH | 4 | $4,000.00 | $4,900.00 |
| 113 | TR bar TRM T1 SPL tan (63100167) | EACH | 4 | $3,250.00 | $4,200.00 |
| 114 | TR bar TRM T1 SPL FLR (63100169) | EACH | 1 | $3,650.00 | $4,200.00 |
| 115 | Guardrail remov (63200310) | LF | 1,662 | $8.50 | $10.00 |
| 116 | Fur erect row markers (66600105) | EACH | 2 | $1,500.00 | $550.00 |
| 117 | Non SPL waste disposl (66900200) | CY | 6,800 | $60.00 | $10.00 |
| 118 | Reg sub P-const plan (66901001) | LS | 1 | $3,000.00 | $3,000.00 |
| 119 | Reg sub F con report (66901003) | LS | 1 | $1,000.00 | $1,000.00 |
| 120 | Reg sub mon (66901006) | CAL DAY | 14 | $900.00 | $900.00 |
| 121 | Engr field office A (67000400) | CAL MO | 24 | $3,500.00 | $3,000.00 |
| 122 | Engr field lab (67000600) | CAL MO | 24 | $1,275.00 | $2,200.00 |
| 123 | Mobilization (67100100) | LS | 1 | $1,400,000 | $1,410,000 |
| 124 | Changeable message SN (70107025) | CAL DAY | 42 | $75.00 | $100.00 |
| 125 | Sign panel T1 (72000100) | SF | 4 | $75.00 | $45.00 |
| 126 | Terminal marker - DA (72501000) | EACH | 5 | $42.00 | $50.00 |
| 127 | Teles STL sin support (72800100) | LF | 24 | $65.00 | $39.00 |
| 128 | Paint PVT MK line 4 (78001110) | LF | 1,280 | $3.80 | $2.95 |
| 129 | Mod ureth PM LTR-sym (78009000) | SF | 94 | $7.00 | $4.50 |
| 130 | Mod ureth PM line 4 (78009004) | LF | 9,274 | $1.20 | $1.20 |
| 131 | Mod ureth PM line 6 (78009006) | LF | 127 | $2.00 | $1.75 |
| 132 | Mod ureth PM line 12 (78009012) | LF | 295 | $3.00 | $3.45 |
| 133 | Mod ureth PM line 24 (78009024) | LF | 30 | $7.00 | $7.00 |
| 134 | GRV RCSD PM LTR & sym (78011000) | SF | 94 | $5.00 | $5.25 |
| 135 | GRV RCSD PVT MRKG 5 (78011025) | LF | 9,274 | $1.00 | $0.85 |
| 136 | GRV RCSD PVT MRKG 7 (78011035) | LF | 127 | $2.00 | $1.25 |
| 137 | GRV RCSD PVT MRKG 13 (78011065) | LF | 295 | $4.00 | $3.40 |
| 138 | GRV RCSD PVT MRKG 25 (78011125) | LF | 30 | $5.00 | $6.75 |
| 139 | Raised refl pavt MKR (78100100) | EACH | 104 | $95.00 | $65.00 |
| 140 | Grdrail ref type A (78200005) | EACH | 20 | $12.00 | $30.00 |
| 141 | Barr wall ref type C (78200011) | EACH | 14 | $10.00 | $18.00 |
| 142 | Raised ref PVT MK rem (78300200) | EACH | 20 | $55.40 | $75.00 |
| 143 | Con emb STR 2 PVC (81200230) | LF | 1,145 | $65.00 | $65.00 |
| 144 | Jun BX SS as 12X12X6 (81300550) | EACH | 1 | $2,093.45 | $2,093.45 |
| 145 | Jun BX SS as 24X24X10 (81300948) | EACH | 2 | $4,596.54 | $4,596.54 |
| 146 | UD 2#4#6G xlpuse 1.25 (81603032) | LF | 375 | $14.65 | $14.65 |
| 147 | EC C XLP use 1C 6 (81702130) | LF | 932 | $6.30 | $6.30 |
| 148 | Lum LED rdwy H (82110008) | EACH | 2 | $1,773.13 | $1,773.13 |
| 149 | LT P A 40MH 6MA (83008200) | EACH | 2 | $10,706 | $10,706 |
| 150 | Rem LT U no salv (84200600) | EACH | 2 | $2,312.38 | $2,312.38 |
| 151 | Reloc EX LT unit (84400105) | EACH | 3 | $2,615.74 | $2,615.74 |
| 152 | Elcbl C egrdc 6 1C (87301900) | LF | 466 | $8.72 | $8.72 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of August 1, 2025. Compiled by Mirage Metrics.