IDOT contract 68E44 bid tabulation
Section (15B-1)BP,BRR;(14HB-1)BRR. Let by Illinois DOT on June 13, 2025, Peoria, District 04. 2 bids received; low bid $69,915,000 by William Charles Construction Company, LLC.
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 220
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | William Charles Construction Company, LLC | $69,915,000 | Low |
| 2 | ICC Group Inc. | $73,694,000 | +5.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. William Charles Construction Company, LLC | 2. ICC Group Inc. |
|---|---|---|---|---|---|
| 1 | Bolt replacement (X0322559) | EACH | 65 | $700.00 | $560.00 |
| 2 | Temporary end section (X0322938) | EACH | 1 | $3,200.00 | $2,871.00 |
| 3 | Slotted drain removal (X0325734) | LF | 244 | $160.00 | $60.00 |
| 4 | Access ladder (X0325941) | EACH | 5 | $15,300 | $28,750 |
| 5 | Misc electrical work (X0327739) | LS | 1 | $49,338 | $49,338 |
| 6 | Filter mattress (X2840110) | SY | 2,420 | $485.00 | $475.00 |
| 7 | HMA surf rem var DP (X4401198) | SY | 929 | $23.74 | $23.74 |
| 8 | BR deck grooving long (X5030250) | SY | 19,921 | $7.40 | $4.69 |
| 9 | Structural STL removl (X5051204) | LB | 27,760 | $1.00 | $7.75 |
| 10 | Struct steel repair (X5051206) | LB | 113,210 | $5.10 | $35.00 |
| 11 | C&D N-lead PT C RS N1 (X5060601) | LS | 1 | $48,500 | $48,000 |
| 12 | C&D N-lead PT C RS N2 (X5060602) | LS | 1 | $561,200 | $555,590 |
| 13 | Bar terminators (X5080530) | EACH | 1,101 | $30.10 | $33.49 |
| 14 | HLMRB disc G exp 200K (X5211610) | EACH | 30 | $8,200.00 | $17,500 |
| 15 | HLMRB disc G exp 500K (X5211625) | EACH | 2 | $11,000 | $30,500 |
| 16 | HLMRB disc G exp 600K (X5211630) | EACH | 19 | $11,500 | $27,500 |
| 17 | HLMRB disc G exp 900K (X5211645) | EACH | 2 | $13,300 | $32,500 |
| 18 | HLMRB disc G exp 1250K (X5211655) | EACH | 4 | $21,400 | $27,500 |
| 19 | HLMRB disc G exp 1500K (X5211660) | EACH | 2 | $17,500 | $38,500 |
| 20 | HLMRB disc G exp 1750K (X5211665) | EACH | 2 | $17,500 | $37,500 |
| 21 | Clean drainage system (X5230152) | LS | 1 | $50,000 | $25,000 |
| 22 | Drainage scuppr DS-11 (X5230174) | EACH | 120 | $4,400.00 | $3,250.00 |
| 23 | Drainage scuppr DS-33 (X5230190) | EACH | 2 | $6,300.00 | $5,250.00 |
| 24 | Remov EX flar end sec (X5427602) | EACH | 1 | $1,225.00 | $610.50 |
| 25 | Pro SS conn to EX man (X5510011) | EACH | 3 | $1,400.00 | $3,267.00 |
| 26 | Pipe drain removal (X6010003) | LF | 8 | $147.00 | $60.00 |
| 27 | Temporary inlet (X6024875) | EACH | 1 | $4,150.00 | $4,092.00 |
| 28 | Paved ditch spec (X6061460) | LF | 34 | $375.00 | $180.00 |
| 29 | Linear delin panels 4 (X6350204) | EACH | 14 | $200.00 | $200.00 |
| 30 | Conc barrier base SPL (X6370048) | LF | 491 | $230.00 | $200.00 |
| 31 | Fence rem & reinstall (X6640108) | LF | 15 | $120.00 | $300.00 |
| 32 | Traf cont & prot SPL (X7010216) | LS | 1 | $138,000 | $750,000 |
| 33 | RRPM reflector removl (X7830050) | EACH | 585 | $17.00 | $15.00 |
| 34 | Maint nav LT system (X8260112) | CAL MO | 24 | $6,848.88 | $6,694.93 |
| 35 | Rem EX lighting systm (X8440128) | LS | 1 | $67,875 | $67,875 |
| 36 | Mod EX LTG controller (X8950130) | EACH | 1 | $4,829.27 | $4,829.27 |
| 37 | GDRL agg eros cont (Z0001002) | TON | 225 | $165.00 | $60.00 |
| 38 | Jack & rem EX bearing (Z0001899) | EACH | 81 | $35,000 | $45,000 |
| 39 | C&D lead PT CL RS N1 (Z0007101) | LS | 1 | $2,244,600 | $2,222,360 |
| 40 | Clean & PT STL BR N1 (Z0010501) | LS | 1 | $194,000 | $192,000 |
| 41 | Clean & PT STL BR N2 (Z0010502) | LS | 1 | $14,105,000 | $11,253,299 |
| 42 | STR rep con DP = < 5 (Z0012754) | SF | 1,830 | $170.00 | $174.45 |
| 43 | STR rep con DP over 5 (Z0012755) | SF | 83 | $210.00 | $190.00 |
| 44 | Construction layout (Z0013798) | LS | 1 | $532,772 | $500,000 |
| 45 | Diamond grind BR sec (Z0029090) | SY | 21,520 | $12.50 | $6.68 |
| 46 | Modular expan JT 12 (Z0034396) | LF | 43 | $5,500.00 | $7,495.00 |
| 47 | RR prot liability ins (Z0048665) | LS | 1 | $15,500 | $7,125.00 |
| 48 | Temp pavement (Z0062456) | SY | 642 | $145.00 | $146.31 |
| 49 | Trainees (Z0076600) | HR | 2,000 | $0.80 | $0.80 |
| 50 | Trainees TPG (Z0076604) | HR | 2,000 | $15.00 | $15.00 |
| 51 | Tree remov acres (20100500) | ACRE | 0.25 | $80,000 | $25,000 |
| 52 | Temporary fence (20101000) | LF | 1,587 | $36.00 | $20.00 |
| 53 | Nitrogen fert nutr (20101400) | LB | 90 | $4.00 | $4.00 |
| 54 | Phosphorus fert nutr (20101500) | LB | 90 | $4.00 | $4.00 |
| 55 | Potassium fert nutr (20101600) | LB | 90 | $4.00 | $4.00 |
| 56 | Earth excavation (20200100) | CY | 2,701 | $48.00 | $51.93 |
| 57 | Channel excavation (20300100) | CY | 2,633 | $165.00 | $375.00 |
| 58 | Trench backfill (20800150) | CY | 10 | $220.00 | $125.00 |
| 59 | Topsoil F & P 4 (21101615) | SY | 5,682 | $12.00 | $16.35 |
| 60 | Grading & shap ditch (21400100) | LF | 382 | $22.00 | $45.00 |
| 61 | Seeding CL 2A (25000210) | ACRE | 1 | $3,000.00 | $3,000.00 |
| 62 | Mowing (25000750) | ACRE | 5 | $400.00 | $400.00 |
| 63 | Mulch method 2 (25100115) | ACRE | 1 | $1,775.00 | $1,775.00 |
| 64 | HD eros contr blanket (25100635) | SY | 1,375 | $3.00 | $3.00 |
| 65 | Temp eros contr seed (28000250) | LB | 24 | $12.00 | $30.00 |
| 66 | Temp ditch checks (28000305) | LF | 95 | $33.00 | $30.00 |
| 67 | Perimeter eros bar (28000400) | LF | 1,402 | $13.00 | $7.00 |
| 68 | Inlet & pipe protect (28000500) | EACH | 25 | $575.00 | $250.00 |
| 69 | Inlet filters (28000510) | EACH | 25 | $815.00 | $195.00 |
| 70 | Stone dump rip CL A1 (28100801) | TON | 15 | $2,100.00 | $1,100.00 |
| 71 | Stone dump rip CL A6 (28100811) | TON | 4,120 | $270.00 | $225.00 |
| 72 | Agg subgrade improve (30300011) | TON | 2,378 | $51.00 | $34.81 |
| 73 | P bit matls tack CT (40600295) | LB | 4,919 | $2.92 | $2.92 |
| 74 | P HMA BC IL-9.5 N70 (40603208) | TON | 83 | $436.00 | $436.00 |
| 75 | P HMA SC IL-9.5 E N70 (40604172) | TON | 104 | $395.00 | $395.00 |
| 76 | PVT con PCC BR app SL (42000080) | SY | 207 | $525.00 | $330.00 |
| 77 | PCC PVT 9 1/2 jointd (42000411) | SY | 365 | $370.00 | $258.89 |
| 78 | Protective coat (42001300) | SY | 1,678 | $5.50 | $1.00 |
| 79 | Pavement rem (44000100) | SY | 2,628 | $55.00 | $22.54 |
| 80 | Comb curb gutter rem (44000500) | LF | 110 | $59.00 | $5.00 |
| 81 | Paved ditch removal (44004000) | LF | 34 | $165.00 | $15.00 |
| 82 | Paved SHLD removal (44004250) | SY | 440 | $24.00 | $20.85 |
| 83 | Aggregate SHLDS B 6 (48101500) | SY | 32 | $64.00 | $50.00 |
| 84 | HMA shoulders 8 (48203029) | SY | 2,152 | $127.13 | $127.13 |
| 85 | PCC shoulders 8 (48300300) | SY | 70 | $200.00 | $258.89 |
| 86 | Conc rem (50102400) | CY | 84.70 | $1,800.00 | $550.00 |
| 87 | Rem EX conc deck N1 (50104701) | EACH | 1 | $498,992 | $1,424,500 |
| 88 | Rem EX conc deck N2 (50104702) | EACH | 1 | $5,460,000 | $12,159,390 |
| 89 | Pipe culvert remov (50105220) | LF | 256 | $47.00 | $60.00 |
| 90 | Protective shield (50157300) | SY | 4,459 | $21.00 | $1.00 |
| 91 | Structure excavation (50200100) | CY | 184 | $75.00 | $125.00 |
| 92 | Floor drains (50300100) | EACH | 173 | $1,600.00 | $850.00 |
| 93 | Conc struct (50300225) | CY | 101.50 | $2,750.00 | $2,650.00 |
| 94 | Conc sup-STR (50300255) | CY | 8,501.20 | $2,100.00 | $1,305.00 |
| 95 | Protective coat (50300300) | SY | 28,350 | $3.30 | $2.75 |
| 96 | Conc supstr app slab (50301350) | CY | 356.20 | $820.00 | $945.00 |
| 97 | F & E struct steel (50500405) | LB | 37,300 | $11.50 | $35.00 |
| 98 | Stud shear connectors (50500505) | EACH | 100,637 | $8.00 | $4.11 |
| 99 | Reinf bars, epoxy CTD (50800205) | LB | 2,254,820 | $1.69 | $1.68 |
| 100 | Bar splicers (50800515) | EACH | 17,274 | $49.00 | $40.00 |
| 101 | Mechanical splicers (50800530) | EACH | 53 | $176.00 | $140.00 |
| 102 | Pedestrian rail (50900805) | LF | 519 | $166.00 | $157.00 |
| 103 | Name plates (51500100) | EACH | 2 | $1,000.00 | $2,005.00 |
| 104 | Pref JT strip seal (52000110) | LF | 504 | $383.00 | $442.46 |
| 105 | Finger PLT exp JT 5 (52000216) | LF | 203.50 | $5,500.00 | $6,500.00 |
| 106 | Finger PLT exp JT 6 (52000220) | LF | 39.50 | $6,050.00 | $7,250.00 |
| 107 | Fab reinf elas trough (52000600) | LF | 270 | $913.00 | $950.00 |
| 108 | Elast bearing assy T1 (52100010) | EACH | 20 | $1,925.00 | $6,500.00 |
| 109 | Anchor bolts 3/4 (52100510) | EACH | 80 | $160.00 | $210.00 |
| 110 | Anchor bolts 1 (52100520) | EACH | 144 | $209.00 | $250.00 |
| 111 | Anchor bolts 1 1/4 (52100530) | EACH | 68 | $246.00 | $350.00 |
| 112 | Anchor bolts 1 1/2 (52100540) | EACH | 16 | $315.00 | $550.00 |
| 113 | Anchor bolts 2 (52100560) | EACH | 16 | $432.00 | $1,000.00 |
| 114 | Temp SHT piling (52200010) | SF | 335 | $120.00 | $100.00 |
| 115 | Drainage system for structures (52318802) | LS | 1 | $115,000 | $70,000 |
| 116 | P cul CL C 2 12 temp (5422C012) | LF | 241 | $110.00 | $249.60 |
| 117 | Metal FL end sec 12" (54262712) | EACH | 1 | $1,000.00 | $2,260.50 |
| 118 | Storm sew CL A 2 12 (550A0340) | LF | 53 | $80.00 | $145.36 |
| 119 | Storm sewer rem 12 (55100500) | LF | 52 | $83.00 | $60.00 |
| 120 | Granular backfill STR (58600101) | CY | 184 | $160.00 | $115.00 |
| 121 | Concrete sealer (58700300) | SF | 7,023 | $15.00 | $2.00 |
| 122 | Epoxy crack injection (59000200) | LF | 270 | $90.00 | $90.00 |
| 123 | Geocomposite wall DR (59100100) | SY | 107 | $83.00 | $65.00 |
| 124 | Conc HDWL for P drain (60100060) | EACH | 2 | $575.00 | $1,435.50 |
| 125 | Pipe drains 12 (60100945) | LF | 8 | $146.00 | $171.85 |
| 126 | P undr for struct 4 (60146304) | LF | 269 | $53.00 | $45.00 |
| 127 | Inlets TA T20F&G (60237420) | EACH | 1 | $2,000.00 | $2,260.50 |
| 128 | Inlets TB T20F&G (60240324) | EACH | 1 | $2,125.00 | $3,360.50 |
| 129 | CB adjust (60250200) | EACH | 2 | $1,025.00 | $885.50 |
| 130 | Inlets adjust (60260100) | EACH | 8 | $1,850.00 | $885.50 |
| 131 | Remov manholes (60500040) | EACH | 1 | $2,000.00 | $610.50 |
| 132 | Remov inlets (60500060) | EACH | 2 | $1,200.00 | $610.50 |
| 133 | Comb CC&G TB6.24 aep (60605100) | LF | 110 | $160.00 | $110.00 |
| 134 | Conc thrust blocks (61000050) | EACH | 1 | $1,000.00 | $3,360.50 |
| 135 | TY G inlet box 610001 (61000335) | EACH | 1 | $6,550.00 | $7,392.00 |
| 136 | SPBGR TY A 6FT posts (63000001) | LF | 987.50 | $34.00 | $34.00 |
| 137 | Traf bar term T6 (63100085) | EACH | 3 | $3,900.00 | $4,250.00 |
| 138 | TR bar TRM T1 SPL tan (63100167) | EACH | 1 | $3,200.00 | $3,200.00 |
| 139 | TR bar TRM T1 SPL FLR (63100169) | EACH | 1 | $3,200.00 | $3,200.00 |
| 140 | Guardrail remov (63200310) | LF | 757 | $6.00 | $6.00 |
| 141 | Conc bar VX 44HT (63700380) | LF | 800 | $465.00 | $291.31 |
| 142 | Imp atten SU nar TL3 (64300770) | EACH | 1 | $34,000 | $34,000 |
| 143 | Non SPL waste disposl (66900200) | CY | 2,826 | $95.00 | $116.70 |
| 144 | Soil disposal analy (66900530) | EACH | 1 | $1,450.00 | $1,500.00 |
| 145 | Reg sub P-const plan (66901001) | LS | 1 | $2,200.00 | $2,000.00 |
| 146 | Reg sub F con report (66901003) | LS | 1 | $2,200.00 | $2,000.00 |
| 147 | Reg sub mon (66901006) | CAL DAY | 28 | $1,250.00 | $1,000.00 |
| 148 | Engr field office A (67000400) | CAL MO | 36 | $3,700.00 | $3,850.00 |
| 149 | Engr field lab (67000600) | CAL MO | 36 | $2,700.00 | $1,550.00 |
| 150 | Mobilization (67100100) | LS | 1 | $4,175,000 | $4,258,848 |
| 151 | TR cont surveillance (70103815) | CAL DAY | 10 | $0.10 | $900.00 |
| 152 | Changeable message SN (70107025) | CAL DAY | 2,100 | $25.00 | $24.00 |
| 153 | Short term pavt mking (70300100) | LF | 13,096 | $1.20 | $1.25 |
| 154 | SHRT TRM pavt MK rem (70300150) | SF | 70,788 | $1.00 | $0.40 |
| 155 | Temp PVT MK LTR & sym T4 tape (70307100) | SF | 795 | $12.00 | $3.90 |
| 156 | Temp PVT MK L4 T4 tape (70307120) | LF | 99,730 | $1.75 | $1.34 |
| 157 | Temp PVT MK L8 T4 tape (70307140) | LF | 23,124 | $3.00 | $2.60 |
| 158 | Temp PVT MK L12 T4 tape (70307160) | LF | 6,814 | $6.00 | $3.90 |
| 159 | Temp PVT MK L24 T4 tape (70307210) | LF | 492 | $12.00 | $8.00 |
| 160 | Temp conc barrier (70400100) | LF | 7,112.50 | $38.25 | $40.00 |
| 161 | Pin temp conc barrier (70400125) | EACH | 900 | $27.00 | $30.00 |
| 162 | Rel temp conc barrier (70400200) | LF | 5,765.50 | $10.50 | $12.90 |
| 163 | Temp SPBGR TY A (70500100) | LF | 150 | $40.00 | $40.00 |
| 164 | Temp TR bar term T1 (70500615) | EACH | 1 | $4,600.00 | $4,600.00 |
| 165 | Temp TR bar term T6 (70500665) | EACH | 1 | $4,800.00 | $4,800.00 |
| 166 | Imp attn temp FRN TL2 (70600255) | EACH | 2 | $12,000 | $20,613 |
| 167 | Imp attn temp FRN TL3 (70600260) | EACH | 3 | $12,000 | $25,689 |
| 168 | Imp attn rel FRN TL2 (70600322) | EACH | 6 | $7,500.00 | $6,822.87 |
| 169 | Imp attn rel FRN TL3 (70600332) | EACH | 8 | $7,500.00 | $6,822.87 |
| 170 | Imp attn rel sun TL3 (70600370) | EACH | 1 | $7,500.00 | $6,822.88 |
| 171 | Sign panel T1 (72000100) | SF | 12 | $16.75 | $16.75 |
| 172 | Sign panel T3 (72000300) | SF | 824 | $29.75 | $29.75 |
| 173 | Remov sign panel T3 (72400330) | SF | 918 | $5.50 | $5.50 |
| 174 | Reloc sign panel T1 (72400710) | SF | 55 | $24.25 | $24.25 |
| 175 | Terminal marker - DA (72501000) | EACH | 4 | $50.00 | $50.00 |
| 176 | Metal post TY A (72900100) | LF | 17 | $11.00 | $11.00 |
| 177 | Ovhd sin STR-span T1A (73300100) | LF | 50.40 | $1,350.00 | $1,350.00 |
| 178 | Oss cant 2CA 3-0X5-6 (73302170) | LF | 27.50 | $2,225.00 | $2,225.00 |
| 179 | Ovhd sin STR BR MT (73304000) | LF | 24.50 | $1,125.00 | $1,125.00 |
| 180 | Drill shaft conc FDN (73400200) | CY | 9.30 | $4,500.00 | $6,043.52 |
| 181 | Rem OH sin STR mono (73500020) | EACH | 2 | $3,425.00 | $3,425.00 |
| 182 | Rem ovhd SN STR-BR MT (73602000) | EACH | 1 | $2,150.00 | $2,150.00 |
| 183 | Rem GR MT sin support (73700100) | EACH | 1 | $855.00 | $855.00 |
| 184 | Pref PL PM TB STNRD LTR-sym (78003101) | SF | 63 | $48.00 | $48.00 |
| 185 | Pref PL PM TB STD L4 (78003111) | LF | 1,767 | $4.50 | $4.50 |
| 186 | Pref PL PM TB STD L6 (78003131) | LF | 21,831 | $6.75 | $6.75 |
| 187 | Pref PL PM TB STD L8 (78003141) | LF | 9,837 | $9.90 | $9.90 |
| 188 | Pref PL PM TB STD L12 (78003151) | LF | 3,094 | $13.75 | $13.75 |
| 189 | Mod ureth PM LTR-sym (78009000) | SF | 156 | $20.00 | $20.00 |
| 190 | Mod ureth PM line 4 (78009004) | LF | 6,659 | $1.00 | $1.00 |
| 191 | Mod ureth PM line 6 (78009006) | LF | 12,714 | $1.35 | $1.35 |
| 192 | Mod ureth PM line 8 (78009008) | LF | 2,680 | $3.25 | $3.25 |
| 193 | Mod ureth PM line 12 (78009012) | LF | 1,068 | $7.15 | $7.15 |
| 194 | Mod ureth PM line 24 (78009024) | LF | 90 | $20.00 | $20.00 |
| 195 | GRV RCSD PVT MRKG 5 (78011025) | LF | 8,425 | $0.70 | $0.70 |
| 196 | GRV RCSD PVT MRKG 7 (78011035) | LF | 34,545 | $0.90 | $0.90 |
| 197 | GRV RCSD PVT MRKG 9 (78011045) | LF | 12,517 | $2.00 | $2.00 |
| 198 | GRV RCSD PVT MRKG 13 (78011065) | LF | 4,162 | $5.00 | $5.00 |
| 199 | GRV RCSD PVT MRKG 25 (78011125) | LF | 90 | $15.00 | $15.00 |
| 200 | Raised refl pavt MKR (78100100) | EACH | 20 | $425.00 | $375.00 |
| 201 | Replacement reflector (78100300) | EACH | 585 | $20.00 | $20.00 |
| 202 | Raised ref PVT MK rem (78300200) | EACH | 20 | $126.34 | $65.00 |
| 203 | PVT MKG rem WTR blast (78300202) | SF | 32,988 | $1.00 | $1.40 |
| 204 | Undrgrd C PVC 2 (81028350) | LF | 720 | $53.84 | $53.84 |
| 205 | Con at ST 1 galvs (81100300) | LF | 615 | $123.97 | $123.97 |
| 206 | Con emb STR 1.5 PVC (81200220) | LF | 4,843 | $64.83 | $64.83 |
| 207 | Jun BX SS as 6X6X4 (81300220) | EACH | 7 | $2,131.79 | $2,131.79 |
| 208 | Jun BX SS as 8X8X6 (81300320) | EACH | 7 | $2,754.55 | $2,754.55 |
| 209 | Jun BX SS as 14X8X6 (81300600) | EACH | 7 | $3,798.13 | $3,798.13 |
| 210 | UD 2#6 #6G xlpuse 1 (81603035) | LF | 1,121 | $40.89 | $40.89 |
| 211 | EC C XLP use 1C 8 (81702120) | LF | 6,572 | $5.62 | $5.62 |
| 212 | EC C XLP use 1C 6 (81702130) | LF | 16,322 | $6.47 | $6.47 |
| 213 | Lum LED rdwy G (82110007) | EACH | 26 | $1,759.61 | $1,759.61 |
| 214 | Wwowl LED 180 D R (82200608) | EACH | 4 | $57,698 | $57,698 |
| 215 | Wwowl LED 360 D G (82200609) | EACH | 2 | $57,698 | $57,698 |
| 216 | LT P GS 45MH 15MA (83060450) | EACH | 16 | $12,075 | $12,075 |
| 217 | LT P GS 50MH 15MA (83060550) | EACH | 3 | $12,051 | $12,051 |
| 218 | LP F M 15BC 8 5/8X6 (83600356) | EACH | 2 | $2,547.91 | $2,547.81 |
| 219 | LP F M 15BC 8 5/8X8 (83600358) | EACH | 3 | $2,690.91 | $2,690.91 |
| 220 | Drill EX foundation (87900100) | EACH | 1 | $2,640.72 | $2,640.72 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.