IDOT contract 80D33 bid tabulation
Section (0909.1). Let by Illinois DOT on September 18, 2026, Cook, District 01. 3 bids received; low bid $6,437,242 by K-Five Construction Corporation.
- Owner
- Illinois DOT
- Letting
- 18 SEP 2026
- Pay items
- 144
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | K-Five Construction Corporation | $6,437,242 | Low |
| 2 | D. Construction, Inc. | $6,692,099 | +4.0% |
| 3 | Gallagher Asphalt Corporation | $6,727,018 | +5.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. K-Five Construction Corporation | 2. D. Construction, Inc. | 3. Gallagher Asphalt Corporation |
|---|---|---|---|---|---|---|
| 1 | Constructn layout SPL (X0320050) | LS | 1 | $45,000 | $60,000 | $24,199 |
| 2 | Rem TH epxy B DK olay (X0325499) | SY | 915 | $1.00 | $40.00 | $18.50 |
| 3 | Stream gauge (X0327638) | EACH | 1 | $2,800.00 | $2,000.00 | $4,677.00 |
| 4 | Ped signal post 10 FT (X1400367) | EACH | 3 | $1,538.49 | $1,615.76 | $1,520.00 |
| 5 | Ped signal post 5 FT (X1400378) | EACH | 19 | $1,260.84 | $1,324.16 | $1,245.00 |
| 6 | Selective clearing (X2010514) | ACRE | 0.04 | $300,000 | $66,000 | $62,080 |
| 7 | CC&G RMVL repl < = 10 (X4400501) | LF | 122 | $60.00 | $66.00 | $52.20 |
| 8 | CC&G RMVL repl > 10FT (X4400503) | LF | 12,186 | $44.00 | $48.40 | $49.80 |
| 9 | BR deck grooving long (X5030250) | SY | 857 | $9.00 | $6.52 | $9.05 |
| 10 | Floor drains cleaned (X5030539) | EACH | 24 | $425.00 | $250.00 | $321.00 |
| 11 | Struct steel remov (X5051204) | LB | 890 | $18.00 | $10.00 | $28.00 |
| 12 | Repair bridge rail (X5091732) | LF | 10 | $655.00 | $846.56 | $620.00 |
| 13 | SS cleaned 12 (X5537800) | LF | 2,295 | $2.00 | $2.20 | $2.10 |
| 14 | FR & lids adjust SPL (X6030310) | EACH | 146 | $1,000.00 | $850.00 | $750.00 |
| 15 | Rem imp atten no salv (X6430120) | EACH | 2 | $1,390.00 | $1,529.00 | $1,438.00 |
| 16 | CH LK fence rem & RE (X6640304) | LF | 48 | $157.00 | $172.93 | $162.00 |
| 17 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $3,000.00 | $5,000.00 | $1,000.00 |
| 18 | Traf cont & prot SPL (X7010216) | LS | 1 | $37,400 | $0.01 | $20,700 |
| 19 | Temp info signing (X7200061) | SF | 225 | $16.00 | $30.00 | $16.50 |
| 20 | Accessible ped signal (X8760200) | EACH | 44 | $1,766.98 | $1,855.72 | $1,745.00 |
| 21 | Conc FDN TY A 12D (X8780012) | LF | 96 | $372.17 | $390.86 | $368.00 |
| 22 | Temp TR signal timing (X8900104) | EACH | 4 | $904.95 | $950.40 | $893.00 |
| 23 | Gas valve adjusted (Z0001110) | EACH | 3 | $300.00 | $330.00 | $260.00 |
| 24 | Appr slab repair (FD) (Z0001700) | SY | 39 | $1,550.00 | $900.00 | $1,676.00 |
| 25 | Conc BR deck scar 3/8 (Z0012102) | SY | 915 | $65.00 | $65.00 | $124.00 |
| 26 | Debris removal (Z0015550) | CY | 40 | $122.00 | $100.00 | $598.00 |
| 27 | Drainage STR adj (Z0018400) | EACH | 4 | $500.00 | $0.01 | $2,922.00 |
| 28 | Drainage STR cleaned (Z0018500) | EACH | 153 | $335.00 | $368.50 | $347.00 |
| 29 | Diamond grind BR sec (Z0029090) | SY | 857 | $12.00 | $16.58 | $18.20 |
| 30 | RE-optimize TR sig sys 1 (Z0033044) | EACH | 8 | $754.13 | $792.00 | $745.00 |
| 31 | RR prot liability ins (Z0048665) | LS | 1 | $13,000 | $12,138 | $12,005 |
| 32 | Temp shoring & crib (Z0073200) | EACH | 1 | $15,600 | $10,000 | $20,690 |
| 33 | Trainees (Z0076600) | HR | 1,000 | $0.80 | $0.80 | $0.80 |
| 34 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 | $15.00 |
| 35 | Earth excavation (20200100) | CY | 581 | $60.00 | $66.00 | $159.00 |
| 36 | Topsoil F & P 4 (21101615) | SY | 2,206 | $10.00 | $11.00 | $10.35 |
| 37 | Nitrogen fert nutr (25000400) | LB | 41.10 | $5.00 | $5.50 | $5.15 |
| 38 | Phosphorus fert nutr (25000500) | LB | 41.10 | $5.00 | $5.50 | $5.15 |
| 39 | Potassium fert nutr (25000600) | LB | 41 | $5.00 | $5.50 | $5.15 |
| 40 | Sodding salt tolerant (25200110) | SY | 2,206 | $12.65 | $13.92 | $13.10 |
| 41 | Supple watering (25200200) | UNIT | 111 | $1.00 | $1.10 | $1.05 |
| 42 | Inlet filters (28000510) | EACH | 28 | $200.00 | $220.00 | $255.00 |
| 43 | Agg base cse B (35101500) | CY | 289 | $40.00 | $44.00 | $51.00 |
| 44 | HMA base cse 6 (35501308) | SY | 289 | $21.00 | $50.00 | $69.00 |
| 45 | Bit matls tack CT (40600290) | LB | 49,848 | $0.01 | $0.01 | $1.25 |
| 46 | Long joint sealant (40600370) | LF | 63,641 | $2.45 | $2.70 | $2.90 |
| 47 | Mix CR JTS flangewys (40600400) | TON | 161 | $50.00 | $0.01 | $200.00 |
| 48 | Matl transfer device (40600405) | TON | 10,534 | $4.00 | $2.75 | $0.01 |
| 49 | HMA surf rem butt JT (40600982) | SY | 1,493 | $0.01 | $0.01 | $0.01 |
| 50 | P HMA BC IL-4.75 N50 (40603200) | TON | 352 | $150.00 | $109.00 | $130.00 |
| 51 | HMA SC IL-9.5 D N50 (40604060) | TON | 4 | $1,000.00 | $250.00 | $400.00 |
| 52 | P HMA SC SMA 9.5 F N80 (40605026) | TON | 10,534 | $141.00 | $122.00 | $137.00 |
| 53 | Protective coat (42001300) | SY | 15,947 | $0.60 | $0.66 | $0.01 |
| 54 | PC conc sidewalk 5 (42400200) | SF | 106,596 | $7.00 | $7.70 | $7.50 |
| 55 | Detectable warnings (42400800) | SF | 1,778 | $40.00 | $44.00 | $20.00 |
| 56 | HMA surf rem 1 3/4 (44000156) | SY | 101,015 | $3.00 | $1.70 | $2.00 |
| 57 | HMA surf rem 2 3/4 (44000160) | SY | 6,385 | $4.00 | $3.10 | $2.70 |
| 58 | Sidewalk rem (44000600) | SF | 105,159 | $2.00 | $2.20 | $2.90 |
| 59 | Median removal (PD) (44003510) | SF | 2,250 | $1.00 | $3.00 | $0.40 |
| 60 | CL D patch T1 11 (44201773) | SY | 86 | $35.00 | $110.00 | $80.00 |
| 61 | CL D patch T2 11 (44201777) | SY | 2,310 | $35.00 | $110.00 | $56.00 |
| 62 | CL D patch T3 11 (44201781) | SY | 603 | $35.00 | $110.00 | $43.00 |
| 63 | CL D patch T4 11 (44201783) | SY | 1,779 | $35.00 | $110.00 | $36.00 |
| 64 | Conc rem (50102400) | CY | 19.90 | $2,600.00 | $2,500.00 | $4,138.00 |
| 65 | Conc sup-STR (50300255) | CY | 21.60 | $3,800.00 | $3,000.00 | $5,172.00 |
| 66 | Protective coat (50300300) | SY | 967 | $1.00 | $1.00 | $5.30 |
| 67 | F & E struct steel (50500405) | LB | 890 | $69.00 | $45.50 | $35.75 |
| 68 | Reinf bars, epoxy CTD (50800205) | LB | 2,230 | $6.00 | $3.50 | $6.20 |
| 69 | Bar splicers (50800515) | EACH | 28 | $65.00 | $80.00 | $101.00 |
| 70 | Pref JT strip seal (52000110) | LF | 115 | $365.00 | $295.00 | $620.00 |
| 71 | Deck slab rep (FD-T2) (53016002) | SY | 1 | $5,400.00 | $3,500.00 | $6,410.00 |
| 72 | BR DK LTX C oly 2 3/4 (53101410) | SY | 915 | $156.00 | $177.92 | $228.00 |
| 73 | STR rep con DP = < 5 (53212754) | SF | 376 | $225.00 | $185.00 | $291.00 |
| 74 | STR rep con DP over 5 (53212755) | SF | 6 | $250.00 | $400.00 | $354.00 |
| 75 | Water valves adjust (56109210) | EACH | 8 | $650.00 | $715.00 | $260.00 |
| 76 | Inlets TA T1F OL (60234200) | EACH | 2 | $1,500.00 | $1,650.00 | $1,550.00 |
| 77 | Inlets TA T24F&G (60237470) | EACH | 2 | $1,600.00 | $1,760.00 | $1,610.00 |
| 78 | CB adjust (60250200) | EACH | 28 | $450.00 | $495.00 | $385.00 |
| 79 | CB reconst (60252800) | EACH | 6 | $2,000.00 | $2,200.00 | $1,440.00 |
| 80 | Man adjust (60255500) | EACH | 3 | $650.00 | $715.00 | $352.00 |
| 81 | Man reconst (60257900) | EACH | 7 | $2,000.00 | $2,200.00 | $1,440.00 |
| 82 | FR & grates adjust (60300105) | EACH | 48 | $500.00 | $550.00 | $352.00 |
| 83 | FR & lids adjust (60300305) | EACH | 5 | $450.00 | $495.00 | $370.00 |
| 84 | Pipe culv cleaned 12 (60920012) | LF | 1,230 | $3.00 | $4.40 | $4.15 |
| 85 | Pipe culv cleaned 15 (60920015) | LF | 300 | $4.00 | $5.50 | $5.15 |
| 86 | Non SPL waste disposl (66900200) | CY | 582 | $90.00 | $99.00 | $0.01 |
| 87 | Soil disposal analy (66900530) | EACH | 6 | $995.00 | $1,750.00 | $1,030.00 |
| 88 | Reg sub P-const plan (66901001) | LS | 1 | $10,000 | $2,750.00 | $6,620.00 |
| 89 | Reg sub F con report (66901003) | LS | 1 | $1,000.00 | $2,750.00 | $518.00 |
| 90 | Reg sub mon (66901006) | CAL DAY | 69 | $650.00 | $800.00 | $673.00 |
| 91 | Mobilization (67100100) | LS | 1 | $385,000 | $213,500 | $340,000 |
| 92 | TR cont & prot 701606 (70102625) | LS | 1 | $1.00 | $0.01 | $1.00 |
| 93 | TR cont & prot 701601 (70102630) | LS | 1 | $126,000 | $0.01 | $183,000 |
| 94 | TR cont & prot 701602 (70102632) | LS | 1 | $1.00 | $355,905 | $1.00 |
| 95 | TR cont & prot 701611 (70102634) | LS | 1 | $1.00 | $0.01 | $1.00 |
| 96 | TR cont & prot 701701 (70102635) | LS | 1 | $1.00 | $0.01 | $1.00 |
| 97 | TR cont & prot 701801 (70102640) | LS | 1 | $1.00 | $0.01 | $1.00 |
| 98 | TR cont surveillance (70103815) | CAL DAY | 50 | $25.00 | $0.01 | $25.90 |
| 99 | Changeable message SN (70107025) | CAL DAY | 84 | $28.00 | $75.00 | $29.00 |
| 100 | Short term pavt mking (70300100) | LF | 54,944 | $0.01 | $0.01 | $0.01 |
| 101 | SHRT TRM pavt MK rem (70300150) | SF | 20,809 | $0.01 | $0.01 | $0.01 |
| 102 | Temp PVT MK LTR & sym paint (70300211) | SF | 6,957 | $0.01 | $0.01 | $0.01 |
| 103 | Temp PVT MK line 4 - paint (70300221) | LF | 92,005 | $0.01 | $0.01 | $0.01 |
| 104 | Temp PVT MK line 6 - paint (70300241) | LF | 11,400 | $0.01 | $0.01 | $0.01 |
| 105 | Temp PVT MK line 12 - paint (70300261) | LF | 17,544 | $0.01 | $0.01 | $0.01 |
| 106 | Temp PVT MK line 24 - paint (70300281) | LF | 4,244 | $0.01 | $0.01 | $0.01 |
| 107 | Temp PVT MK LTR & sym T4 tape (70307100) | SF | 16 | $8.00 | $10.00 | $8.30 |
| 108 | Temp PVT MK L4 T4 tape (70307120) | LF | 7,217 | $1.20 | $2.26 | $1.25 |
| 109 | Temp PVT MK L6 T4 tape (70307130) | LF | 148 | $1.80 | $2.75 | $1.85 |
| 110 | Temp conc barrier (70400100) | LF | 487.50 | $69.00 | $30.00 | $60.00 |
| 111 | Rel temp conc barrier (70400200) | LF | 462.50 | $12.50 | $15.00 | $8.30 |
| 112 | Imp attn temp NRN TL2 (70600241) | EACH | 2 | $3,500.00 | $6,500.00 | $3,620.00 |
| 113 | Imp attn rel NRN TL2 (70600341) | EACH | 2 | $2,000.00 | $2,000.00 | $2,070.00 |
| 114 | Sign panel T1 (72000100) | SF | 64 | $55.00 | $27.50 | $56.90 |
| 115 | Rem & rel sign panel asmbly TB (72400210) | EACH | 1 | $350.00 | $440.00 | $362.10 |
| 116 | Teles STL sin support (72800100) | LF | 65 | $24.00 | $16.50 | $24.80 |
| 117 | THPL PVT MK LTR & sym (78000100) | SF | 3,478 | $5.00 | $5.50 | $5.20 |
| 118 | THPL PVT MK line 4 (78000200) | LF | 46,002 | $0.70 | $0.77 | $0.72 |
| 119 | THPL PVT MK line 6 (78000400) | LF | 5,700 | $0.85 | $0.94 | $0.88 |
| 120 | THPL PVT MK line 12 (78000600) | LF | 8,772 | $2.50 | $2.75 | $2.60 |
| 121 | THPL PVT MK line 24 (78000650) | LF | 1,661 | $5.00 | $5.50 | $5.15 |
| 122 | Pref PL PM TB STD L7 (78003137) | LF | 77 | $45.00 | $49.50 | $46.50 |
| 123 | Mod ureth PM line 4 (78009004) | LF | 614 | $6.60 | $7.26 | $6.80 |
| 124 | GRV RCSD PVT MRKG 8 (78011040) | LF | 77 | $16.00 | $17.60 | $16.50 |
| 125 | Raised refl pavt MKR (78100100) | EACH | 1,748 | $35.00 | $38.50 | $36.20 |
| 126 | Raised ref PVT MK rem (78300200) | EACH | 1,748 | $13.74 | $9.00 | $0.01 |
| 127 | PVT MKG rem WTR blast (78300202) | SF | 13,455 | $0.95 | $3.30 | $0.01 |
| 128 | Undrgrd C galvs 2 (81028200) | LF | 510 | $82.31 | $86.45 | $81.00 |
| 129 | Undrgrd C galvs 3 (81028220) | LF | 4 | $136.94 | $143.81 | $135.00 |
| 130 | Main EX TR sig instal (85000200) | EACH | 6 | $3,506.00 | $3,682.07 | $3,464.00 |
| 131 | Elcbl C signal 14 2C (87301215) | LF | 3,714 | $6.85 | $7.19 | $6.75 |
| 132 | Elcbl C signal 14 3C (87301225) | LF | 540 | $7.10 | $7.46 | $7.00 |
| 133 | Elcbl C signal 14 7C (87301255) | LF | 122 | $8.10 | $8.50 | $8.00 |
| 134 | Elcbl C egrdc 6 1C (87301900) | LF | 441 | $7.81 | $8.21 | $7.70 |
| 135 | TS post 16 (87501200) | EACH | 1 | $2,380.91 | $2,500.49 | $2,350.00 |
| 136 | Conc FDN TY A (87800100) | LF | 3 | $479.77 | $503.87 | $474.00 |
| 137 | Drill EX handhole (87900200) | EACH | 23 | $472.29 | $496.01 | $465.00 |
| 138 | Ped SH LED 1F BM CDT (88102717) | EACH | 4 | $772.50 | $811.29 | $764.00 |
| 139 | Det loop T1 (88600100) | LF | 4,281 | $27.66 | $31.35 | $27.30 |
| 140 | Mod EX contr (89502200) | EACH | 5 | $1,286.70 | $1,351.32 | $1,270.00 |
| 141 | Rem elcbl FR con (89502300) | LF | 1,113 | $6.20 | $6.51 | $6.10 |
| 142 | Remov EX TS equip (89502375) | EACH | 6 | $142.08 | $149.22 | $140.00 |
| 143 | Rebuild EX handhole (89502376) | EACH | 27 | $2,465.87 | $2,589.71 | $2,435.00 |
| 144 | Remov EX conc FDN (89502385) | EACH | 9 | $493.26 | $518.03 | $487.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of September 18, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.