IDOT contract 80D33 bid tabulation

Section (0909.1). Let by Illinois DOT on September 18, 2026, Cook, District 01. 3 bids received; low bid $6,437,242 by K-Five Construction Corporation.

Owner
Illinois DOT
Letting
18 SEP 2026
Pay items
144
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1K-Five Construction Corporation$6,437,242Low
2D. Construction, Inc.$6,692,099+4.0%
3Gallagher Asphalt Corporation$6,727,018+5.0%
IDOT contract 80D33: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. K-Five Construction Corporation2. D. Construction, Inc.3. Gallagher Asphalt Corporation
1Constructn layout SPL (X0320050)LS1$45,000$60,000$24,199
2Rem TH epxy B DK olay (X0325499)SY915$1.00$40.00$18.50
3Stream gauge (X0327638)EACH1$2,800.00$2,000.00$4,677.00
4Ped signal post 10 FT (X1400367)EACH3$1,538.49$1,615.76$1,520.00
5Ped signal post 5 FT (X1400378)EACH19$1,260.84$1,324.16$1,245.00
6Selective clearing (X2010514)ACRE0.04$300,000$66,000$62,080
7CC&G RMVL repl < = 10 (X4400501)LF122$60.00$66.00$52.20
8CC&G RMVL repl > 10FT (X4400503)LF12,186$44.00$48.40$49.80
9BR deck grooving long (X5030250)SY857$9.00$6.52$9.05
10Floor drains cleaned (X5030539)EACH24$425.00$250.00$321.00
11Struct steel remov (X5051204)LB890$18.00$10.00$28.00
12Repair bridge rail (X5091732)LF10$655.00$846.56$620.00
13SS cleaned 12 (X5537800)LF2,295$2.00$2.20$2.10
14FR & lids adjust SPL (X6030310)EACH146$1,000.00$850.00$750.00
15Rem imp atten no salv (X6430120)EACH2$1,390.00$1,529.00$1,438.00
16CH LK fence rem & RE (X6640304)LF48$157.00$172.93$162.00
17Engrs FLD ofc TY A D1 (X6700407)CAL MO12$3,000.00$5,000.00$1,000.00
18Traf cont & prot SPL (X7010216)LS1$37,400$0.01$20,700
19Temp info signing (X7200061)SF225$16.00$30.00$16.50
20Accessible ped signal (X8760200)EACH44$1,766.98$1,855.72$1,745.00
21Conc FDN TY A 12D (X8780012)LF96$372.17$390.86$368.00
22Temp TR signal timing (X8900104)EACH4$904.95$950.40$893.00
23Gas valve adjusted (Z0001110)EACH3$300.00$330.00$260.00
24Appr slab repair (FD) (Z0001700)SY39$1,550.00$900.00$1,676.00
25Conc BR deck scar 3/8 (Z0012102)SY915$65.00$65.00$124.00
26Debris removal (Z0015550)CY40$122.00$100.00$598.00
27Drainage STR adj (Z0018400)EACH4$500.00$0.01$2,922.00
28Drainage STR cleaned (Z0018500)EACH153$335.00$368.50$347.00
29Diamond grind BR sec (Z0029090)SY857$12.00$16.58$18.20
30RE-optimize TR sig sys 1 (Z0033044)EACH8$754.13$792.00$745.00
31RR prot liability ins (Z0048665)LS1$13,000$12,138$12,005
32Temp shoring & crib (Z0073200)EACH1$15,600$10,000$20,690
33Trainees (Z0076600)HR1,000$0.80$0.80$0.80
34Trainees TPG (Z0076604)HR1,000$15.00$15.00$15.00
35Earth excavation (20200100)CY581$60.00$66.00$159.00
36Topsoil F & P 4 (21101615)SY2,206$10.00$11.00$10.35
37Nitrogen fert nutr (25000400)LB41.10$5.00$5.50$5.15
38Phosphorus fert nutr (25000500)LB41.10$5.00$5.50$5.15
39Potassium fert nutr (25000600)LB41$5.00$5.50$5.15
40Sodding salt tolerant (25200110)SY2,206$12.65$13.92$13.10
41Supple watering (25200200)UNIT111$1.00$1.10$1.05
42Inlet filters (28000510)EACH28$200.00$220.00$255.00
43Agg base cse B (35101500)CY289$40.00$44.00$51.00
44HMA base cse 6 (35501308)SY289$21.00$50.00$69.00
45Bit matls tack CT (40600290)LB49,848$0.01$0.01$1.25
46Long joint sealant (40600370)LF63,641$2.45$2.70$2.90
47Mix CR JTS flangewys (40600400)TON161$50.00$0.01$200.00
48Matl transfer device (40600405)TON10,534$4.00$2.75$0.01
49HMA surf rem butt JT (40600982)SY1,493$0.01$0.01$0.01
50P HMA BC IL-4.75 N50 (40603200)TON352$150.00$109.00$130.00
51HMA SC IL-9.5 D N50 (40604060)TON4$1,000.00$250.00$400.00
52P HMA SC SMA 9.5 F N80 (40605026)TON10,534$141.00$122.00$137.00
53Protective coat (42001300)SY15,947$0.60$0.66$0.01
54PC conc sidewalk 5 (42400200)SF106,596$7.00$7.70$7.50
55Detectable warnings (42400800)SF1,778$40.00$44.00$20.00
56HMA surf rem 1 3/4 (44000156)SY101,015$3.00$1.70$2.00
57HMA surf rem 2 3/4 (44000160)SY6,385$4.00$3.10$2.70
58Sidewalk rem (44000600)SF105,159$2.00$2.20$2.90
59Median removal (PD) (44003510)SF2,250$1.00$3.00$0.40
60CL D patch T1 11 (44201773)SY86$35.00$110.00$80.00
61CL D patch T2 11 (44201777)SY2,310$35.00$110.00$56.00
62CL D patch T3 11 (44201781)SY603$35.00$110.00$43.00
63CL D patch T4 11 (44201783)SY1,779$35.00$110.00$36.00
64Conc rem (50102400)CY19.90$2,600.00$2,500.00$4,138.00
65Conc sup-STR (50300255)CY21.60$3,800.00$3,000.00$5,172.00
66Protective coat (50300300)SY967$1.00$1.00$5.30
67F & E struct steel (50500405)LB890$69.00$45.50$35.75
68Reinf bars, epoxy CTD (50800205)LB2,230$6.00$3.50$6.20
69Bar splicers (50800515)EACH28$65.00$80.00$101.00
70Pref JT strip seal (52000110)LF115$365.00$295.00$620.00
71Deck slab rep (FD-T2) (53016002)SY1$5,400.00$3,500.00$6,410.00
72BR DK LTX C oly 2 3/4 (53101410)SY915$156.00$177.92$228.00
73STR rep con DP = < 5 (53212754)SF376$225.00$185.00$291.00
74STR rep con DP over 5 (53212755)SF6$250.00$400.00$354.00
75Water valves adjust (56109210)EACH8$650.00$715.00$260.00
76Inlets TA T1F OL (60234200)EACH2$1,500.00$1,650.00$1,550.00
77Inlets TA T24F&G (60237470)EACH2$1,600.00$1,760.00$1,610.00
78CB adjust (60250200)EACH28$450.00$495.00$385.00
79CB reconst (60252800)EACH6$2,000.00$2,200.00$1,440.00
80Man adjust (60255500)EACH3$650.00$715.00$352.00
81Man reconst (60257900)EACH7$2,000.00$2,200.00$1,440.00
82FR & grates adjust (60300105)EACH48$500.00$550.00$352.00
83FR & lids adjust (60300305)EACH5$450.00$495.00$370.00
84Pipe culv cleaned 12 (60920012)LF1,230$3.00$4.40$4.15
85Pipe culv cleaned 15 (60920015)LF300$4.00$5.50$5.15
86Non SPL waste disposl (66900200)CY582$90.00$99.00$0.01
87Soil disposal analy (66900530)EACH6$995.00$1,750.00$1,030.00
88Reg sub P-const plan (66901001)LS1$10,000$2,750.00$6,620.00
89Reg sub F con report (66901003)LS1$1,000.00$2,750.00$518.00
90Reg sub mon (66901006)CAL DAY69$650.00$800.00$673.00
91Mobilization (67100100)LS1$385,000$213,500$340,000
92TR cont & prot 701606 (70102625)LS1$1.00$0.01$1.00
93TR cont & prot 701601 (70102630)LS1$126,000$0.01$183,000
94TR cont & prot 701602 (70102632)LS1$1.00$355,905$1.00
95TR cont & prot 701611 (70102634)LS1$1.00$0.01$1.00
96TR cont & prot 701701 (70102635)LS1$1.00$0.01$1.00
97TR cont & prot 701801 (70102640)LS1$1.00$0.01$1.00
98TR cont surveillance (70103815)CAL DAY50$25.00$0.01$25.90
99Changeable message SN (70107025)CAL DAY84$28.00$75.00$29.00
100Short term pavt mking (70300100)LF54,944$0.01$0.01$0.01
101SHRT TRM pavt MK rem (70300150)SF20,809$0.01$0.01$0.01
102Temp PVT MK LTR & sym paint (70300211)SF6,957$0.01$0.01$0.01
103Temp PVT MK line 4 - paint (70300221)LF92,005$0.01$0.01$0.01
104Temp PVT MK line 6 - paint (70300241)LF11,400$0.01$0.01$0.01
105Temp PVT MK line 12 - paint (70300261)LF17,544$0.01$0.01$0.01
106Temp PVT MK line 24 - paint (70300281)LF4,244$0.01$0.01$0.01
107Temp PVT MK LTR & sym T4 tape (70307100)SF16$8.00$10.00$8.30
108Temp PVT MK L4 T4 tape (70307120)LF7,217$1.20$2.26$1.25
109Temp PVT MK L6 T4 tape (70307130)LF148$1.80$2.75$1.85
110Temp conc barrier (70400100)LF487.50$69.00$30.00$60.00
111Rel temp conc barrier (70400200)LF462.50$12.50$15.00$8.30
112Imp attn temp NRN TL2 (70600241)EACH2$3,500.00$6,500.00$3,620.00
113Imp attn rel NRN TL2 (70600341)EACH2$2,000.00$2,000.00$2,070.00
114Sign panel T1 (72000100)SF64$55.00$27.50$56.90
115Rem & rel sign panel asmbly TB (72400210)EACH1$350.00$440.00$362.10
116Teles STL sin support (72800100)LF65$24.00$16.50$24.80
117THPL PVT MK LTR & sym (78000100)SF3,478$5.00$5.50$5.20
118THPL PVT MK line 4 (78000200)LF46,002$0.70$0.77$0.72
119THPL PVT MK line 6 (78000400)LF5,700$0.85$0.94$0.88
120THPL PVT MK line 12 (78000600)LF8,772$2.50$2.75$2.60
121THPL PVT MK line 24 (78000650)LF1,661$5.00$5.50$5.15
122Pref PL PM TB STD L7 (78003137)LF77$45.00$49.50$46.50
123Mod ureth PM line 4 (78009004)LF614$6.60$7.26$6.80
124GRV RCSD PVT MRKG 8 (78011040)LF77$16.00$17.60$16.50
125Raised refl pavt MKR (78100100)EACH1,748$35.00$38.50$36.20
126Raised ref PVT MK rem (78300200)EACH1,748$13.74$9.00$0.01
127PVT MKG rem WTR blast (78300202)SF13,455$0.95$3.30$0.01
128Undrgrd C galvs 2 (81028200)LF510$82.31$86.45$81.00
129Undrgrd C galvs 3 (81028220)LF4$136.94$143.81$135.00
130Main EX TR sig instal (85000200)EACH6$3,506.00$3,682.07$3,464.00
131Elcbl C signal 14 2C (87301215)LF3,714$6.85$7.19$6.75
132Elcbl C signal 14 3C (87301225)LF540$7.10$7.46$7.00
133Elcbl C signal 14 7C (87301255)LF122$8.10$8.50$8.00
134Elcbl C egrdc 6 1C (87301900)LF441$7.81$8.21$7.70
135TS post 16 (87501200)EACH1$2,380.91$2,500.49$2,350.00
136Conc FDN TY A (87800100)LF3$479.77$503.87$474.00
137Drill EX handhole (87900200)EACH23$472.29$496.01$465.00
138Ped SH LED 1F BM CDT (88102717)EACH4$772.50$811.29$764.00
139Det loop T1 (88600100)LF4,281$27.66$31.35$27.30
140Mod EX contr (89502200)EACH5$1,286.70$1,351.32$1,270.00
141Rem elcbl FR con (89502300)LF1,113$6.20$6.51$6.10
142Remov EX TS equip (89502375)EACH6$142.08$149.22$140.00
143Rebuild EX handhole (89502376)EACH27$2,465.87$2,589.71$2,435.00
144Remov EX conc FDN (89502385)EACH9$493.26$518.03$487.00
IDOT contract 80D33: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of September 18, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy