IDOT contract 80C87 bid tabulation
Section 2025-2119-RS,DR. Let by Illinois DOT on July 31, 2026, Cook, District 01. 3 bids received; low bid $288,498 by Gallagher Asphalt Corporation.
- Owner
- Illinois DOT
- Letting
- 31 JUL 2026
- Pay items
- 48
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Gallagher Asphalt Corporation | $288,498 | Low |
| 2 | D. Construction, Inc. | $316,088 | +10% |
| 3 | K-Five Construction Corporation | $344,389 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gallagher Asphalt Corporation | 2. D. Construction, Inc. | 3. K-Five Construction Corporation |
|---|---|---|---|---|---|---|
| 1 | PCC surf rem var DP (X4400100) | SY | 2,055 | $9.00 | $7.00 | $10.45 |
| 2 | CC&G RMVL repl < = 10 (X4400501) | LF | 200 | $77.00 | $70.00 | $75.00 |
| 3 | CC&G RMVL repl > 10FT (X4400503) | LF | 50 | $77.00 | $65.00 | $65.00 |
| 4 | SS cleaned 12 (X5537800) | LF | 300 | $7.00 | $1.10 | $1.00 |
| 5 | FR & lids adjust SPL (X6030310) | EACH | 5 | $1,600.00 | $1,000.00 | $1,250.00 |
| 6 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 6 | $500.00 | $5,000.00 | $3,500.00 |
| 7 | TR C-prot expressways (X7011015) | LS | 1 | $3,200.00 | $29,560 | $2,700.00 |
| 8 | Temp info signing (X7200061) | SF | 104 | $18.00 | $30.00 | $15.00 |
| 9 | Drainage STR cleaned (Z0018500) | EACH | 20 | $440.00 | $385.00 | $350.00 |
| 10 | Topsoil F & P 4 (21101615) | SY | 425 | $12.50 | $9.90 | $9.00 |
| 11 | Sodding salt tolerant (25200110) | SY | 425 | $12.50 | $33.00 | $30.00 |
| 12 | Bit matls tack CT (40600290) | LB | 3,140 | $0.01 | $0.01 | $0.01 |
| 13 | Long joint sealant (40600370) | LF | 1,975 | $4.45 | $5.60 | $3.10 |
| 14 | Mix CR JTS flangewys (40600400) | TON | 7 | $240.00 | $0.01 | $500.00 |
| 15 | HMA surf rem butt JT (40600982) | SY | 40 | $30.45 | $0.01 | $0.01 |
| 16 | P HMA BC IL-4.75 N50 (40603200) | TON | 260 | $150.00 | $115.00 | $170.00 |
| 17 | P HMA SC SMA 9.5 F N80 (40605026) | TON | 460 | $160.00 | $136.00 | $160.00 |
| 18 | Protective coat (42001300) | SY | 75 | $0.01 | $1.00 | $5.00 |
| 19 | Pavement rem (44000100) | SY | 390 | $15.50 | $20.00 | $30.00 |
| 20 | CL D patch T1 10 (44201761) | SY | 10 | $176.00 | $200.00 | $175.00 |
| 21 | CL D patch T2 10 (44201765) | SY | 40 | $176.00 | $130.00 | $175.00 |
| 22 | CL D patch T3 10 (44201769) | SY | 40 | $160.00 | $130.00 | $175.00 |
| 23 | CL D patch T4 10 (44201771) | SY | 80 | $163.00 | $130.00 | $175.00 |
| 24 | VV reconst new T1F CL (60266300) | EACH | 1 | $3,000.00 | $1,600.00 | $1,850.00 |
| 25 | FR & grates adjust (60300105) | EACH | 15 | $500.00 | $700.00 | $475.00 |
| 26 | FR & grates T4 (60404400) | EACH | 3 | $500.00 | $600.00 | $800.00 |
| 27 | FR & grates T11 (60404800) | EACH | 10 | $500.00 | $600.00 | $650.00 |
| 28 | FR & lids T1 CL (60406100) | EACH | 5 | $500.00 | $600.00 | $460.00 |
| 29 | Mobilization (67100100) | LS | 1 | $19,250 | $18,950 | $20,500 |
| 30 | TR cont & prot 701601 (70102630) | LS | 1 | $6,000.00 | $0.01 | $4,986.73 |
| 31 | TR cont & prot 701602 (70102632) | LS | 1 | $1.00 | $0.01 | $4,986.73 |
| 32 | TR cont & prot 701701 (70102635) | LS | 1 | $1.00 | $0.01 | $4,986.73 |
| 33 | TR cont & prot 701801 (70102640) | LS | 1 | $500.00 | $0.01 | $4,986.73 |
| 34 | Short term pavt mking (70300100) | LF | 6,320 | $0.01 | $0.50 | $1.00 |
| 35 | SHRT TRM pavt MK rem (70300150) | SF | 1,265 | $0.01 | $2.00 | $2.00 |
| 36 | Temp PVT MK LTR & sym paint (70300211) | SF | 210 | $0.01 | $1.50 | $1.75 |
| 37 | Temp PVT MK line 4 - paint (70300221) | LF | 1,740 | $0.01 | $0.25 | $0.40 |
| 38 | Temp PVT MK line 6 - paint (70300241) | LF | 1,230 | $0.01 | $0.50 | $0.60 |
| 39 | Temp PVT MK line 8 - paint (70300251) | LF | 150 | $0.01 | $0.75 | $0.75 |
| 40 | Temp PVT MK line 12 - paint (70300261) | LF | 40 | $0.01 | $1.00 | $1.10 |
| 41 | Temp PVT MK L4 T4 tape (70307120) | LF | 1,580 | $0.01 | $0.01 | $1.25 |
| 42 | Sign panel T2 (72000200) | SF | 20 | $75.00 | $35.20 | $45.00 |
| 43 | Teles STL sin support (72800100) | LF | 30 | $42.00 | $17.60 | $18.00 |
| 44 | THPL PVT MK LTR & sym (78000100) | SF | 105 | $12.00 | $17.60 | $7.00 |
| 45 | THPL PVT MK line 4 (78000200) | LF | 870 | $2.75 | $2.09 | $2.10 |
| 46 | THPL PVT MK line 6 (78000400) | LF | 615 | $3.50 | $3.08 | $3.10 |
| 47 | THPL PVT MK line 8 (78000500) | LF | 75 | $6.00 | $3.96 | $6.75 |
| 48 | THPL PVT MK line 12 (78000600) | LF | 20 | $8.00 | $6.05 | $9.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of July 31, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.