IDOT contract 62R51 bid tabulation

. Let by Illinois DOT on November 7, 2025, Will, District 01. 4 bids received; low bid $3,192,530 by Iroquois Paving Corporation.

Owner
Illinois DOT
Letting
07 NOV 2025
Pay items
203
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Iroquois Paving Corporation$3,192,530Low
2Gallagher Asphalt Corporation$3,368,001+5.0%
3P. T. Ferro Construction Co.$3,413,216+7.0%
4Performance Construction and Engineering, LLC$4,848,213+52%
IDOT contract 62R51: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Iroquois Paving Corporation2. Gallagher Asphalt Corporation3. P. T. Ferro Construction Co.4. Performance Construction and Engineering, LLC
1Weed cont aquatic (K0029614)GAL2$1,605.00$2,000.00$900.00$125.00
2EM veh P S LSC 20 3C (X0324085)LF1,577$3.10$3.15$3.00$3.00
3Cellular modem (X0325922)EACH1$6,150.00$6,100.00$6,000.00$5,400.00
4STL cas P bor/JKD 8 (X1200295)LF65$21.00$1,100.00$625.00$1,100.00
5Outdr RTD NTWRK cable (X1400102)LF343$5.25$3.75$5.00$3.30
6Serv instl GR MT MTR (X1400150)EACH2$5,123.75$5,450.00$5,000.00$10,000
7Rem HM lumnrs salvage (X1400190)EACH3$512.50$275.00$500.00$250.00
8Remote contr video SY (X1400215)EACH1$6,150.00$5,050.00$6,000.00$4,500.00
9Lyr II datalink SWTCH (X1400216)EACH2$5,217.00$6,000.00$5,100.00$5,300.00
10Term fiber in cabinet (X1400217)EACH48$154.00$340.00$150.00$230.00
11Rem luminaire salvage (X1400341)EACH8$410.00$275.00$400.00$2,000.00
12LED SF visor heater (X1400454)EACH9$513.00$450.00$500.00$3,600.00
13Selective clearing (X2010516)UNIT32$443.00$380.00$350.00$1,000.00
14Seeding CL 4 mod (X2501800)ACRE0.25$3,228.00$4,400.00$4,000.00$10,000
15Interseed CL 4 mod (X2503314)ACRE0.75$2,310.00$4,400.00$4,000.00$6,500.00
16Eros cont blanket SPL (X2511630)SY4,985$1.75$2.10$2.00$5.00
17Driveway remov & repl (X4400080)SY259$113.00$80.00$90.00$110.00
18Island removal (X4402805)SF977$4.00$6.25$7.00$6.00
19Cur-in-PL pipe LNR 12 (X5430212)LF120$325.00$300.00$315.00$365.00
20SS cleaned 12 (X5537800)LF381$2.25$5.50$2.00$8.00
21Conc med TSM4.06 (X6065701)SF1,213$9.00$17.50$42.00$20.00
22Fence removal (X6640104)LF1,820$9.00$9.00$8.00$9.00
23CH LK gates SPL (X6640308)EACH2$3,600.00$4,000.00$3,486.00$4,000.00
24CH LK fence 6 SPL (X6640560)LF1,820$39.00$40.00$37.50$40.00
25Engrs FLD ofc TY A D1 (X6700407)CAL MO12$0.01$2,500.00$3,000.00$2,500.00
26Traf cont & prot SPL (X7010216)LS1$78,000$95,000$191,000$150,000
27Temp info signing (X7200061)SF304$21.00$13.00$20.00$12.00
28Maint lighting systm (X8000003)CAL MO12$3,100.00$1,450.00$3,000.00$2,000.00
29Rem LT tower no salv (X8420502)EACH1$1,550.00$12,750$15,000$13,000
30Rem tower FDN (X8420510)EACH1$3,075.00$4,800.00$3,000.00$4,200.00
31Fac T super P cab (X8570232)EACH1$31,000$29,000$30,000$26,000
32RR fac TY super R cab (X8571219)EACH1$36,000$32,000$35,000$28,000
33Uninter power sup SPL (X8620200)EACH2$6,360.00$7,650.00$6,200.00$14,000
34Fib opt CBL 24F SM (X8710029)LF913$7.00$9.70$6.00$9.00
35Power OV eth ext (X8710049)EACH1$1,435.00$1,050.00$1,400.00$896.00
36FO interct center 24P (X8710070)EACH2$2,575.00$1,400.00$2,500.00$1,300.00
37LED SF lens cover (X8809005)EACH29$400.00$500.00$380.00$432.00
38Temp TR signal timing (X8900104)EACH2$1,300.00$1,350.00$1,200.00$1,200.00
39Construction layout (Z0013798)LS1$18,000$45,000$60,000$50,000
40Drainage STR cleaned (Z0018500)EACH3$1,660.00$750.00$1,300.00$1,500.00
41Lum sfty CBL assembly (Z0033020)EACH19$154.00$300.00$150.00$300.00
42Optim traf signal sys (Z0033056)EACH1$3,587.00$3,400.00$3,500.00$3,000.00
43RR prot liability ins (Z0048665)LS1$4,100.00$3,900.00$10,000$17,000
44Trainees (Z0076600)HR500$0.80$0.80$0.80$0.80
45Trainees TPG (Z0076604)HR500$15.00$15.00$15.00$15.00
46Tree remov 6-15 (20100110)UNIT122$41.00$44.00$40.00$45.00
47Temporary fence (20101000)LF663$3.00$4.00$3.50$13.00
48Earth excavation (20200100)CY479$75.00$65.00$0.01$70.00
49Rem & disp uns matl (20201200)CY10$300.00$250.00$200.00$150.00
50Furnished excavation (20400800)CY898$48.00$1.00$0.01$65.00
51Geotech fab F/GR stab (21001000)SY2,079$3.50$2.70$3.50$2.00
52Topsoil exc & plac (21101505)CY721$54.50$67.00$40.00$10.00
53Topsoil F & P 4 (21101615)SY57$40.00$8.80$8.00$6.00
54Seeding CL 2A (25000210)ACRE1.25$1,820.00$3,750.00$3,500.00$5,000.00
55Seeding CL 4 (25000310)ACRE0.25$2,205.00$4,250.00$4,000.00$10,000
56Nitrogen fert nutr (25000400)LB113$2.75$3.10$3.00$3.00
57Phosphorus fert nutr (25000500)LB113$2.75$3.10$3.00$3.00
58Potassium fert nutr (25000600)LB113$2.75$3.10$3.00$3.00
59Interseed CL 2A (25003210)ACRE0.25$2,575.00$4,000.00$4,000.00$1,250.00
60Interseed CL 4B (25003314)ACRE0.50$4,100.00$6,000.00$6,000.00$8,000.00
61Mulch method 2 (25100115)ACRE0.80$4,900.00$2,700.00$2,500.00$8,000.00
62Temp eros contr seed (28000250)LB157$7.00$5.25$5.00$5.00
63Temp ditch checks (28000305)LF400$12.25$13.00$12.00$20.00
64Perimeter eros bar (28000400)LF1,530$3.75$3.25$3.00$5.00
65Inlet filters (28000510)EACH11$300.00$275.00$250.00$300.00
66Temp eros contr blank (28001100)SY2,587$1.00$1.30$1.20$4.00
67Stone riprap CL A3 (28100105)SY32$130.00$79.00$80.00$65.00
68Stone riprap CL A4 (28100107)SY67$150.00$105.00$130.00$75.00
69Filter fabric (28200200)SY98$5.00$6.75$4.00$4.00
70Agg subgrade improve (30300001)CY520$0.01$1.00$0.01$65.00
71Agg subgrade impr 12 (30300112)SY2,079$40.00$30.00$30.00$40.00
72Sub gran mat B 4 (31101200)SY7$95.00$60.00$55.00$78.00
73Agg base cse B (35101500)CY39$90.00$55.00$100.00$65.00
74HMA base cse 7 1/2 (35501314)SY1$100.00$100.00$1,000.00$1,100.00
75HMA base cse 8 1/4 (35501317)SY660$69.00$55.00$65.00$55.00
76HMA BC wid 7 1/2 (35600706)SY163$63.00$80.00$100.00$80.00
77HMA BC wid 8 1/4 (35600709)SY1,192$69.00$55.00$65.00$550.00
78Bit matls tack CT (40600290)LB19,141$0.01$0.01$0.01$0.01
79Long joint sealant (40600370)LF10,805$3.50$3.20$3.50$3.50
80HMA surf rem butt JT (40600982)SY214$0.01$0.01$17.00$0.01
81P HMA BC IL-4.75 N50 (40603200)TON947$125.00$115.00$120.00$118.00
82P HMA SC IL-9.5 E N70 (40604172)TON2,208$110.00$105.00$120.00$109.00
83PCC PVT 9 (42000400)SY7$220.00$225.00$300.00$850.00
84Protective coat (42001300)SY1,318$0.01$0.01$1.50$0.30
85Pavement rem (44000100)SY295$60.00$43.00$38.00$65.00
86HMA surf rem 2 1/4 (44000158)SY22,175$3.00$2.75$4.00$3.00
87Comb curb gutter rem (44000500)LF869$28.00$15.00$9.00$8.00
88Median removal (44003100)SF1,319$10.00$3.50$5.00$5.00
89CL D patch T2 11 (44201777)SY1,287$0.01$70.00$0.01$192.00
90CL D patch T3 11 (44201781)SY630$0.01$60.00$110.00$180.00
91CL D patch T4 11 (44201783)SY210$0.01$60.00$110.00$165.00
92Pipe culvert remov (50105220)LF100$47.00$26.50$28.00$50.00
93Reinforcement bars (50800105)LB41$21.00$6.50$10.00$30.00
94P cul CL D 1 12 (542D0217)LF13$117.00$113.00$90.00$115.00
95P cul CL D 1 15 (542D0220)LF139$72.00$96.00$100.00$100.00
96PRC flar end sec 12 (54213657)EACH2$1,235.00$1,100.00$1,200.00$2,000.00
97PRC flar end sec 24 (54213669)EACH2$2,420.00$1,350.00$1,650.00$2,800.00
98PRC flar end sec 27 (54213672)EACH1$3,010.00$2,025.00$1,800.00$3,000.00
99Metal FL end sec 12" (54262712)EACH1$1,710.00$550.00$550.00$1,000.00
100Metal FL end sec 15" (54262715)EACH4$1,735.00$550.00$550.00$1,000.00
101Storm sew CL A 1 12 (550A0050)LF855$78.00$95.00$85.00$130.00
102Storm sew CL A 1 24 (550A0120)LF178$64.00$109.00$110.00$150.00
103Storm sewer rem 12 (55100500)LF686$27.00$19.00$24.00$75.00
104Storm sewer rem 18 (55100900)LF145$42.00$21.00$28.00$75.00
105Storm sewer rem 24 (55101200)LF33$44.00$21.00$34.00$95.00
106Conc HDWL for P drain (60100060)EACH4$1,060.00$1,550.00$650.00$1,500.00
107Pipe underdr T 2 4 (60108204)LF1,825$17.00$17.75$20.00$65.00
108CB TA 4 dia T1F OL (60200105)EACH4$4,205.00$3,850.00$3,900.00$3,500.00
109CB recon new T1F OL (60253000)EACH1$4,100.00$2,000.00$1,400.00$3,900.00
110Remov catch bas (60500050)EACH2$900.00$1,250.00$350.00$1,000.00
111Conc curb TB (60600605)LF119$24.00$26.00$50.00$54.30
112Comb CC&G TB6.06 (60603500)LF498$39.00$26.00$55.00$57.40
113Comb CC&G TB6.12 (60603800)LF231$54.00$26.00$55.00$57.40
114Comb CC&G TM2.06 (60608250)LF117$31.00$26.00$55.00$57.40
115Comb CC&G TM2.12 (60608300)LF206$40.00$26.00$55.00$57.40
116Comb CC&G TM4.12 (60608562)LF420$45.00$26.00$55.00$58.40
117Conc median surf 6 (60618320)SF2,245$13.00$7.00$15.00$10.20
118Pipe culv cleaned 27 (60920027)LF109$5.00$5.75$4.00$30.00
119Non SPL waste disposl (66900200)CY490$125.00$90.00$80.00$65.00
120Soil disposal analy (66900530)EACH4$1,500.00$1,100.00$1,100.00$1,500.00
121Reg sub P-const plan (66901001)LS1$2,300.00$5,100.00$4,600.00$3,500.00
122Reg sub F con report (66901003)LS1$2,300.00$550.00$500.00$1,200.00
123Engineered barrier (66901005)SY500$50.00$22.00$12.50$25.00
124Reg sub mon (66901006)CAL DAY10$1,500.00$800.00$700.00$1,000.00
125Mobilization (67100100)LS1$190,500$203,000$205,000$267,000
126TR cont surveillance (70103815)CAL DAY95$1.00$1.25$1.00$100.00
127Changeable message SN (70107025)CAL DAY372$21.00$36.50$20.00$35.00
128SHRT TRM pavt MK rem (70300150)SF11,381$0.01$0.01$0.01$5.00
129Temp PVT MK LTR & sym paint (70300211)SF1,432$0.01$0.01$0.01$1.30
130Temp PVT MK line 4 - paint (70300221)LF12,916$0.01$0.01$0.01$0.35
131Temp PVT MK line 6 - paint (70300241)LF2,843$0.01$0.01$0.01$0.45
132Temp PVT MK line 8 - paint (70300251)LF846$0.01$0.01$0.01$0.70
133Temp PVT MK line 12 - paint (70300261)LF4,090$0.01$0.01$0.01$1.00
134Temp PVT MK line 24 - paint (70300281)LF261$0.01$0.01$0.01$1.40
135Temp PVT MK LTR & sym T4 tape (70307100)SF553$0.01$4.40$0.01$4.00
136Temp PVT MK L4 T4 tape (70307120)LF23,403$0.01$1.30$0.01$1.30
137Temp PVT MK L6 T4 tape (70307130)LF1,612$0.01$2.00$0.01$2.00
138Temp PVT MK L24 T4 tape (70307210)LF92$0.01$7.50$0.01$8.00
139Sign panel T1 (72000100)SF195.25$44.00$30.00$42.00$30.00
140Sign panel T2 (72000200)SF95.25$44.00$45.00$42.00$45.00
141Remov sin pan assy TA (72400100)EACH3$155.00$82.00$150.00$80.00
142Reloc sin pan assy TA (72400500)EACH3$155.00$110.00$150.00$110.00
143Reloc sin pan assy TB (72400600)EACH1$510.00$220.00$500.00$225.00
144Reloc sign panel T1 (72400710)SF6$155.00$17.00$150.00$200.00
145Teles STL sin support (72800100)LF255$16.00$17.50$15.00$20.00
146THPL PVT MK LTR & sym (78000100)SF835$5.50$5.20$5.20$5.00
147THPL PVT MK line 4 (78000200)LF12,916$0.80$0.80$0.77$1.00
148THPL PVT MK line 6 (78000400)LF1,744$1.40$1.35$1.30$1.30
149THPL PVT MK line 8 (78000500)LF846$1.80$1.75$1.74$2.00
150THPL PVT MK line 12 (78000600)LF4,090$2.70$2.70$2.60$3.00
151THPL PVT MK line 24 (78000650)LF261$5.50$5.25$5.50$5.00
152Pref PL PM TD STD L 6 (78004630)LF1,099$6.00$5.70$5.50$3.00
153GRV RCSD PVT MRKG 7 (78011035)LF1,099$2.00$2.00$1.90$1.00
154Raised refl pavt MKR (78100100)EACH69$52.00$60.00$50.00$80.00
155Raised ref PVT MK rem (78300200)EACH69$0.01$0.01$9.00$55.00
156PVT MKG rem grinding (78300201)SF6,303$0.60$0.01$0.50$1.00
157PVT MKG rem WTR blast (78300202)SF9,437$1.30$0.01$1.25$1.00
158Undrgrd C galvs 2 (81028200)LF2,586$34.00$32.30$33.00$30.00
159Undrgrd C galvs 3 (81028220)LF422$60.00$59.00$58.00$52.00
160Undrgrd C galvs 4 (81028240)LF1,216$72.00$77.30$70.00$80.00
161Handhole (81400100)EACH4$4,100.00$5,200.00$4,000.00$5,000.00
162HD handhole (81400200)EACH13$5,650.00$6,150.00$5,500.00$5,500.00
163DBL handhole (81400300)EACH4$7,200.00$8,200.00$7,000.00$8,000.00
164UD 3#4#6GXLPUSE 1 1/4 (81603090)LF2,320$21.00$25.00$20.00$22.00
165Lum LED rdwy G (82110007)EACH19$925.00$880.00$900.00$775.00
166LT P A 47.5MH 15MA (83050810)EACH11$7,175.00$6,600.00$7,000.00$6,000.00
167LP F M 15BC 10" X 8' (83600365)EACH11$2,570.00$2,550.00$2,500.00$2,200.00
168Bkwy dev TR B 15BC (83800205)EACH11$930.00$842.00$900.00$740.00
169Main EX TR sig instal (85000200)EACH1$3,600.00$11,350$3,500.00$15,000
170Elcbl C tracer 14 1C (87300925)LF913$3.10$3.00$3.00$3.00
171Elcbl C signal 14 3C (87301225)LF1,577$3.20$3.50$3.10$3.25
172Elcbl C signal 14 5C (87301245)LF9,639$3.30$3.90$3.20$3.45
173Elcbl C lead 14 1PR (87301305)LF6,700$3.10$3.50$3.00$4.00
174Elcbl C railrd 14 3C (87301750)LF440$9.25$6.65$9.00$6.00
175Elcbl C serv 6 2C (87301805)LF376$5.75$5.30$6.50$5.00
176Elcbl C egrdc 6 1C (87301900)LF1,880$3.70$5.30$3.50$5.00
177TS post galvs 9 (87502430)EACH1$3,000.00$2,650.00$2,900.00$2,500.00
178TS post galvs 12 (87502460)EACH1$3,330.00$2,950.00$3,250.00$2,600.00
179TS post galvs 16 (87502500)EACH4$3,600.00$3,100.00$3,500.00$2,800.00
180S maa & P 20 (87700140)EACH1$14,550$15,000$14,200$15,000
181S maa & P 22 (87700150)EACH1$15,275$15,150$14,900$15,000
182S maa & P 30 (87700190)EACH1$15,800$18,000$15,400$15,500
183S maa & P 34 (87700210)EACH2$16,900$19,000$16,400$18,000
184S maa & P 48 (87700280)EACH1$24,600$24,250$24,000$23,000
185S maa & P 52 (87700300)EACH1$25,700$25,250$24,900$23,000
186S maa & P 55 (87700320)EACH1$26,000$25,250$25,300$23,000
187STL comb maa&P 32 (87702890)EACH1$25,900$25,250$25,200$23,000
188Conc FDN TY A (87800100)LF32$410.00$430.00$400.00$400.00
189Conc FDN TY C (87800150)LF8$2,300.00$1,550.00$2,200.00$1,600.00
190Conc FDN TY E 30D (87800400)LF74$465.00$475.00$450.00$425.00
191Conc FDN TY E 36D (87800415)LF44$615.00$510.00$600.00$450.00
192SH LED 1F 1S mam (88030010)EACH2$795.00$1,200.00$775.00$1,200.00
193SH LED 1F 3S mam (88030020)EACH23$1,130.00$1,550.00$1,100.00$1,500.00
194SH LED 1F 3S BM (88030050)EACH15$1,025.00$1,450.00$1,000.00$1,300.00
195TS backplate ret-refl (88200510)EACH25$410.00$490.00$400.00$450.00
196Inductive loop detect (88500100)EACH20$308.00$207.00$300.00$200.00
197Det loop T1 (88600100)LF1,538$31.00$50.00$30.00$50.00
198Light detector (88700200)EACH7$2,050.00$1,500.00$2,000.00$1,400.00
199Light detector amp (88700300)EACH2$3,700.00$2,700.00$3,600.00$2,400.00
200Remov EX TS equip (89502375)EACH1$20,500$11,050$20,000$10,000
201Remov EX handhole (89502380)EACH7$1,025.00$1,150.00$1,000.00$1,000.00
202Remov EX DBL handhole (89502382)EACH1$1,540.00$1,750.00$1,500.00$1,600.00
203Remov EX conc FDN (89502385)EACH7$1,025.00$1,750.00$1,000.00$1,500.00
IDOT contract 62R51: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of November 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy