IDOT contract 61M68 bid tabulation
Montgomery, section 25-00064-00-RS. Let by Illinois DOT on September 18, 2026, Kane, District 01. 3 bids received; low bid $1,466,728 by D. Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 18 SEP 2026
- Pay items
- 57
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | D. Construction, Inc. | $1,466,728 | Low |
| 2 | Geneva Construction Company | $1,532,393 | +4.0% |
| 3 | Builders Paving, LLC | $1,597,888 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. D. Construction, Inc. | 2. Geneva Construction Company | 3. Builders Paving, LLC |
|---|---|---|---|---|---|---|
| 1 | Prun safety/equip CLR (K1004595) | LS | 1 | $16,720 | $3,300.00 | $5,000.00 |
| 2 | HMA drive rem & rep (XX006947) | SY | 605 | $45.00 | $46.00 | $85.00 |
| 3 | HMA surf rem var DP (X4401198) | SY | 36,335 | $2.90 | $3.15 | $4.15 |
| 4 | Sanitary manhole adj (X6026050) | EACH | 18 | $1,250.00 | $2,150.00 | $2,150.00 |
| 5 | FR & lids adjust SPL (X6030310) | EACH | 26 | $900.00 | $1,550.00 | $1,450.00 |
| 6 | Temp info signing (X7200061) | SF | 102.80 | $30.00 | $18.00 | $18.00 |
| 7 | RCSD refl pavt marker (X7810300) | EACH | 219 | $38.78 | $35.00 | $35.25 |
| 8 | Det loop repl (X8860105) | LF | 747 | $24.15 | $21.95 | $22.00 |
| 9 | Tree trunk protection (20101100) | EACH | 16 | $165.00 | $100.00 | $100.00 |
| 10 | Tree root pruning (20101200) | EACH | 16 | $93.50 | $105.00 | $75.00 |
| 11 | Topsoil F & P 4 (21101615) | SY | 1,560 | $6.60 | $8.50 | $8.50 |
| 12 | Sodding salt tolerant (25200110) | SY | 1,560 | $22.00 | $12.50 | $12.50 |
| 13 | Supple watering (25200200) | UNIT | 50 | $0.01 | $1.00 | $1.00 |
| 14 | Temp eros contr seed (28000250) | LB | 35 | $4.40 | $20.00 | $20.00 |
| 15 | Inlet filters (28000510) | EACH | 80 | $258.50 | $200.00 | $150.00 |
| 16 | Bit matls tack CT (40600290) | LB | 24,530 | $0.01 | $0.01 | $0.01 |
| 17 | Long joint sealant (40600370) | LF | 17,260 | $3.41 | $3.00 | $3.25 |
| 18 | Mix CR JTS flangewys (40600400) | TON | 15 | $250.00 | $100.00 | $780.00 |
| 19 | HMA surf rem butt JT (40600982) | SY | 400 | $20.00 | $15.00 | $20.00 |
| 20 | P HMA BC IL-4.75 N50 (40603200) | TON | 2,000 | $104.50 | $121.00 | $105.00 |
| 21 | HMA SC IL-9.5 D N70 (40604062) | TON | 4,070 | $79.00 | $93.00 | $88.00 |
| 22 | PC conc sidewalk 5 (42400200) | SF | 9,490 | $10.45 | $9.50 | $9.00 |
| 23 | Detectable warnings (42400800) | SF | 585 | $39.60 | $45.00 | $45.00 |
| 24 | Comb curb gutter rem (44000500) | LF | 2,871 | $11.00 | $10.00 | $10.00 |
| 25 | Sidewalk rem (44000600) | SF | 9,490 | $3.30 | $4.00 | $4.00 |
| 26 | CL D patch T3 9 (44201757) | SY | 545 | $90.00 | $50.00 | $70.00 |
| 27 | CL D patch T4 9 (44201759) | SY | 545 | $90.00 | $50.00 | $70.00 |
| 28 | Dom wat ser box adj (56500600) | EACH | 1 | $400.00 | $1,550.00 | $350.00 |
| 29 | Inlets adjust (60260100) | EACH | 34 | $500.00 | $465.00 | $465.00 |
| 30 | FR & grates T3 (60404300) | EACH | 1 | $600.00 | $685.00 | $685.00 |
| 31 | FR & lids T1 OL (60406000) | EACH | 3 | $600.00 | $460.00 | $460.00 |
| 32 | FR & lids T1 CL (60406100) | EACH | 1 | $600.00 | $460.00 | $460.00 |
| 33 | Comb CC&G TB6.12 (60603800) | LF | 2,871 | $44.00 | $47.00 | $48.00 |
| 34 | Mobilization (67100100) | LS | 1 | $58,500 | $92,000 | $108,530 |
| 35 | TR cont & prot 701501 (70102620) | LS | 1 | $0.01 | $5,244.72 | $5,000.00 |
| 36 | TR cont & prot 701502 (70102622) | LS | 1 | $0.01 | $3,599.00 | $5,000.00 |
| 37 | TR cont & prot 701602 (70102632) | LS | 1 | $35,700 | $3,599.00 | $5,000.00 |
| 38 | TR cont & prot 701701 (70102635) | LS | 1 | $0.01 | $3,599.00 | $5,000.00 |
| 39 | TR cont & prot 701801 (70102640) | LS | 1 | $0.01 | $3,599.00 | $5,000.00 |
| 40 | Changeable message SN (70107025) | CAL DAY | 240 | $50.00 | $30.00 | $30.00 |
| 41 | Short term pavt mking (70300100) | LF | 4,200 | $0.01 | $0.01 | $1.15 |
| 42 | SHRT TRM pavt MK rem (70300150) | SF | 1,400 | $0.01 | $0.01 | $2.30 |
| 43 | Temp PVT MK LTR & sym paint (70300211) | SF | 300 | $0.01 | $1.75 | $1.75 |
| 44 | Temp PVT MK line 4 - paint (70300221) | LF | 4,200 | $0.01 | $0.35 | $0.35 |
| 45 | Temp PVT MK line 24 - paint (70300281) | LF | 200 | $0.01 | $1.60 | $1.60 |
| 46 | THPL PVT MK LTR & sym (78000100) | SF | 717.80 | $5.78 | $5.00 | $5.25 |
| 47 | THPL PVT MK line 4 (78000200) | LF | 14,833 | $0.85 | $0.88 | $0.77 |
| 48 | THPL PVT MK line 6 (78000400) | LF | 2,029 | $1.32 | $1.25 | $1.20 |
| 49 | THPL PVT MK line 12 (78000600) | LF | 1,090 | $2.59 | $2.50 | $2.35 |
| 50 | THPL PVT MK line 24 (78000650) | LF | 284 | $5.78 | $5.00 | $5.25 |
| 51 | GRV RCSD PM LTR & sym (78011000) | SF | 22 | $7.70 | $20.00 | $7.00 |
| 52 | GRV RCSD PVT MRKG 5 (78011025) | LF | 2,140 | $1.43 | $0.70 | $1.30 |
| 53 | GRV RCSD PVT MRKG 7 (78011035) | LF | 382 | $1.98 | $1.25 | $1.80 |
| 54 | GRV RCSD PVT MRKG 13 (78011065) | LF | 400 | $3.30 | $8.00 | $3.00 |
| 55 | GRV RCSD PVT MRKG 25 (78011125) | LF | 29 | $7.70 | $20.00 | $7.00 |
| 56 | Raised ref PVT MK rem (78300200) | EACH | 222 | $10.00 | $14.49 | $18.50 |
| 57 | Rebuild EX handhole (89502376) | EACH | 1 | $2,915.67 | $2,650.61 | $2,655.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of September 18, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.