IDOT contract 61M16 bid tabulation
Hoffman Estates, section 23-00114-00-CH. Let by Illinois DOT on February 27, 2026, Cook, District 01. 6 bids received; low bid $838,719 by A Lamp Concrete Contractors, Inc..
- Owner
- Illinois DOT
- Letting
- 27 FEB 2026
- Pay items
- 98
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | A Lamp Concrete Contractors, Inc. | $838,719 | Low |
| 2 | Landmark Contractors, Inc. | $946,799 | +13% |
| 3 | D'Land Construction, LLC | $958,224 | +14% |
| 4 | K-Five Construction Corporation | $982,954 | +17% |
| 5 | Schroeder Asphalt Services, Inc. | $994,781 | +19% |
| 6 | Alliance Contractors, Inc. | $1,158,005 | +38% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. A Lamp Concrete Contractors, Inc. | 2. Landmark Contractors, Inc. | 3. D'Land Construction, LLC | 4. K-Five Construction Corporation | 5. Schroeder Asphalt Services, Inc. | 6. Alliance Contractors, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | T-acer miy mor 2-1/2 (A2000320) | EACH | 3 | $500.00 | $525.00 | $603.75 | $525.00 | $589.00 | $525.00 |
| 2 | T-carp carol 2-1/2 (A2002520) | EACH | 4 | $500.00 | $550.00 | $632.50 | $550.00 | $615.00 | $550.00 |
| 3 | T-celtis occid 2-1/2 (A2002920) | EACH | 4 | $600.00 | $550.00 | $632.50 | $550.00 | $615.00 | $550.00 |
| 4 | T-ulmus X FRNTR 2.5 (A2008745) | EACH | 2 | $600.00 | $500.00 | $575.00 | $500.00 | $575.00 | $500.00 |
| 5 | T-syring ret TF 2-1/2 (B2006220) | EACH | 2 | $600.00 | $500.00 | $575.00 | $500.00 | $575.00 | $500.00 |
| 6 | Temp access- com ent (X4022000) | EACH | 9 | $250.00 | $670.72 | $300.00 | $550.00 | $200.00 | $1.00 |
| 7 | Temporary sidewalk (X4240114) | SF | 300 | $5.00 | $10.50 | $15.00 | $20.00 | $20.00 | $9.50 |
| 8 | CC&G RMVL repl > 10FT (X4400503) | LF | 868 | $36.00 | $78.15 | $45.00 | $45.00 | $51.50 | $80.00 |
| 9 | CB TA 4 dia W/SPL F&G (X6022712) | EACH | 3 | $3,750.00 | $5,172.00 | $5,400.00 | $4,950.00 | $3,750.00 | $8,000.00 |
| 10 | Inlets TA T3F&G SPL (X6023206) | EACH | 3 | $2,075.00 | $2,500.00 | $3,800.00 | $2,550.00 | $2,075.00 | $7,000.00 |
| 11 | San MH adj new T1F CL (X6026056) | EACH | 6 | $1,365.00 | $1,155.15 | $1,250.00 | $1,550.00 | $1,365.00 | $1,500.00 |
| 12 | Comb CC&G TB6.12 SPL (X6064200) | LF | 1,549 | $31.00 | $42.70 | $36.00 | $40.00 | $44.00 | $50.00 |
| 13 | Traf cont & prot SPL (X7010216) | LS | 1 | $82,000 | $16,000 | $56,000 | $137,678 | $32,000 | $16,000 |
| 14 | Temp info signing (X7200061) | SF | 192 | $12.00 | $15.00 | $17.25 | $15.00 | $15.00 | $15.00 |
| 15 | Rebld EX DBL handhole (X8140238) | EACH | 1 | $4,014.00 | $4,010.00 | $4,625.00 | $4,014.00 | $4,500.00 | $9,155.00 |
| 16 | Temp TR signal timing (X8900104) | EACH | 2 | $680.00 | $680.00 | $785.00 | $680.00 | $800.00 | $2,123.00 |
| 17 | Tree remov 6-15 (20100110) | UNIT | 23 | $31.00 | $30.00 | $40.00 | $30.00 | $50.00 | $30.00 |
| 18 | Tree remov over 15 (20100210) | UNIT | 34 | $41.00 | $40.00 | $50.00 | $40.00 | $79.00 | $40.00 |
| 19 | Temporary fence (20101000) | LF | 25 | $10.00 | $5.00 | $5.75 | $5.00 | $6.50 | $5.00 |
| 20 | Earth excavation (20200100) | CY | 460 | $44.00 | $47.20 | $30.00 | $62.10 | $55.00 | $40.00 |
| 21 | Rem & disp uns matl (20201200) | CY | 260 | $5.00 | $53.65 | $45.00 | $69.31 | $60.00 | $40.00 |
| 22 | Furnished excavation (20400800) | CY | 430 | $5.00 | $64.70 | $45.00 | $58.10 | $48.00 | $10.00 |
| 23 | Trench backfill (20800150) | CY | 5 | $200.00 | $58.35 | $75.00 | $60.00 | $220.00 | $100.00 |
| 24 | Geotech fab F/GR stab (21001000) | SY | 500 | $2.00 | $3.70 | $4.00 | $0.01 | $2.50 | $1.00 |
| 25 | Topsoil F & P var DP (21101600) | SY | 912 | $18.00 | $5.00 | $5.75 | $5.00 | $5.75 | $5.00 |
| 26 | Topsoil F & P 6 (21101625) | SY | 1,465 | $6.50 | $5.00 | $5.75 | $5.00 | $5.75 | $5.00 |
| 27 | Seeding CL 1 (25000100) | ACRE | 0.50 | $4,840.00 | $3,500.00 | $4,025.00 | $3,500.00 | $4,300.00 | $3,500.00 |
| 28 | Nitrogen fert nutr (25000400) | LB | 49 | $1.00 | $1.00 | $1.15 | $1.00 | $2.00 | $1.00 |
| 29 | Phosphorus fert nutr (25000500) | LB | 49 | $1.00 | $1.00 | $1.15 | $1.00 | $2.00 | $1.00 |
| 30 | Potassium fert nutr (25000600) | LB | 49 | $1.00 | $1.00 | $1.15 | $1.00 | $2.00 | $1.00 |
| 31 | Erosion contr blanket (25100630) | SY | 2,377 | $2.00 | $2.00 | $2.30 | $2.00 | $2.40 | $2.00 |
| 32 | Supple watering (25200200) | UNIT | 2 | $200.00 | $0.01 | $0.01 | $0.01 | $1.00 | $0.01 |
| 33 | Temp eros contr seed (28000250) | LB | 53 | $0.10 | $1.00 | $1.15 | $1.00 | $2.00 | $1.00 |
| 34 | Perimeter eros bar (28000400) | LF | 1,959 | $1.00 | $2.75 | $3.16 | $2.75 | $3.50 | $2.75 |
| 35 | Inlet filters (28000510) | EACH | 14 | $15.00 | $233.30 | $250.00 | $175.00 | $250.00 | $50.00 |
| 36 | Temp eros contr blank (28001100) | SY | 2,377 | $0.10 | $1.00 | $1.15 | $1.00 | $2.00 | $1.00 |
| 37 | Agg base cse B 4 (35101600) | SY | 2,363 | $7.50 | $9.95 | $8.00 | $5.50 | $9.60 | $5.75 |
| 38 | Agg base cse B 6 (35101800) | SY | 815 | $10.25 | $11.75 | $12.00 | $6.50 | $11.25 | $8.75 |
| 39 | PCC bse cse 7 1/2 (35300210) | SY | 193 | $68.25 | $58.50 | $20.00 | $90.00 | $123.00 | $90.00 |
| 40 | Bit matls tack CT (40600290) | LB | 2,857 | $0.01 | $0.10 | $0.01 | $0.01 | $0.01 | $0.01 |
| 41 | HMA surf rem butt JT (40600982) | SY | 45 | $20.00 | $50.00 | $28.75 | $25.00 | $20.00 | $25.00 |
| 42 | P HMA BC IL-4.75 N50 (40603200) | TON | 176 | $138.00 | $140.00 | $172.50 | $174.00 | $130.00 | $150.00 |
| 43 | HMA SC IL-9.5 D N50 (40604060) | TON | 357 | $100.00 | $125.00 | $130.00 | $108.00 | $95.00 | $113.00 |
| 44 | Protective coat (42001300) | SY | 3,035 | $0.01 | $1.80 | $0.50 | $0.01 | $1.40 | $0.01 |
| 45 | PCC driveway pavt 8 (42300400) | SY | 815 | $110.00 | $85.70 | $95.00 | $90.00 | $123.00 | $97.00 |
| 46 | PC conc sidewalk 5 (42400200) | SF | 14,943 | $8.25 | $8.60 | $9.50 | $7.65 | $10.30 | $9.50 |
| 47 | Detectable warnings (42400800) | SF | 366 | $27.00 | $31.50 | $35.00 | $24.00 | $41.00 | $20.00 |
| 48 | Pavement rem (44000100) | SY | 1,338 | $15.00 | $13.10 | $16.00 | $15.00 | $16.00 | $40.00 |
| 49 | HMA surf rem 2 1/4 (44000158) | SY | 3,992 | $4.85 | $6.00 | $7.00 | $5.31 | $5.00 | $6.00 |
| 50 | Drive pavement rem (44000200) | SY | 523 | $12.00 | $13.75 | $15.00 | $15.50 | $17.00 | $30.00 |
| 51 | Comb curb gutter rem (44000500) | LF | 2,320 | $6.50 | $12.65 | $8.00 | $9.50 | $9.00 | $30.00 |
| 52 | Sidewalk rem (44000600) | SF | 8,941 | $1.35 | $1.50 | $1.15 | $1.60 | $2.90 | $3.00 |
| 53 | CL D patch T1 8 (44201737) | SY | 50 | $40.00 | $160.00 | $114.00 | $42.00 | $90.00 | $99.00 |
| 54 | CL D patch T2 8 (44201741) | SY | 50 | $40.00 | $150.00 | $114.00 | $42.00 | $90.00 | $99.00 |
| 55 | CL D patch T3 8 (44201745) | SY | 50 | $40.00 | $130.00 | $114.00 | $42.00 | $90.00 | $99.00 |
| 56 | CL D patch T4 8 (44201747) | SY | 50 | $40.00 | $120.00 | $114.00 | $42.00 | $90.00 | $99.00 |
| 57 | Storm sew CL A 1 12 (550A0050) | LF | 10 | $78.00 | $311.30 | $115.00 | $150.00 | $78.00 | $500.00 |
| 58 | Storm sewer rem 12 (55100500) | LF | 53 | $58.00 | $20.30 | $15.00 | $10.00 | $58.00 | $10.00 |
| 59 | CB adjust (60250200) | EACH | 1 | $450.00 | $270.15 | $450.00 | $395.00 | $450.00 | $500.00 |
| 60 | CB adj new T1F OL (60250400) | EACH | 2 | $895.00 | $707.90 | $750.00 | $705.00 | $900.00 | $750.00 |
| 61 | CB adj new T1F CL (60250500) | EACH | 2 | $895.00 | $707.90 | $750.00 | $705.00 | $900.00 | $750.00 |
| 62 | CB adj new T3F&G (60250600) | EACH | 2 | $1,030.00 | $906.20 | $950.00 | $725.00 | $1,030.00 | $750.00 |
| 63 | Man adj new T1F CL (60255800) | EACH | 5 | $915.00 | $707.80 | $750.00 | $705.00 | $915.00 | $750.00 |
| 64 | Man recon new T1F CL (60258200) | EACH | 1 | $1,575.00 | $1,507.00 | $1,850.00 | $1,750.00 | $1,575.00 | $2,000.00 |
| 65 | VV adj new T1F CL (60265900) | EACH | 4 | $915.00 | $707.80 | $750.00 | $705.00 | $915.00 | $1,000.00 |
| 66 | FR & grates adjust (60300105) | EACH | 1 | $450.00 | $270.15 | $450.00 | $395.00 | $450.00 | $500.00 |
| 67 | Remov catch bas (60500050) | EACH | 1 | $1,400.00 | $500.00 | $500.00 | $450.00 | $450.00 | $500.00 |
| 68 | Remov inlets (60500060) | EACH | 4 | $1,285.00 | $335.00 | $500.00 | $250.00 | $1,285.00 | $300.00 |
| 69 | Non SPL waste disposl (66900200) | CY | 35 | $100.00 | $117.20 | $105.00 | $139.75 | $105.00 | $171.00 |
| 70 | Soil disposal analy (66900530) | EACH | 2 | $865.00 | $850.00 | $1,668.00 | $1,450.00 | $950.00 | $1,450.00 |
| 71 | Reg sub P-const plan (66901001) | LS | 1 | $5,200.00 | $5,000.00 | $3,565.00 | $3,100.00 | $5,700.00 | $3,100.00 |
| 72 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $500.00 | $1,380.00 | $1,200.00 | $565.00 | $1,200.00 |
| 73 | Reg sub mon (66901006) | CAL DAY | 30 | $100.00 | $750.00 | $782.00 | $680.00 | $850.00 | $680.00 |
| 74 | Mobilization (67100100) | LS | 1 | $50,000 | $55,500 | $55,000 | $51,000 | $32,000 | $48,389 |
| 75 | Changeable message SN (70107025) | CAL DAY | 120 | $1.00 | $35.00 | $34.50 | $35.00 | $32.00 | $35.00 |
| 76 | Short term pavt mking (70300100) | LF | 1,534 | $0.01 | $1.00 | $3.00 | $0.01 | $3.00 | $1.00 |
| 77 | SHRT TRM pavt MK rem (70300150) | SF | 385 | $0.01 | $3.00 | $2.00 | $8.16 | $3.00 | $1.00 |
| 78 | Temp PVT MK LTR & sym paint (70300211) | SF | 126 | $0.01 | $1.75 | $2.00 | $1.75 | $1.45 | $1.75 |
| 79 | Temp PVT MK line 4 - paint (70300221) | LF | 4,331 | $0.01 | $0.50 | $0.40 | $0.50 | $0.45 | $0.50 |
| 80 | Temp PVT MK line 6 - paint (70300241) | LF | 294 | $0.01 | $0.75 | $0.61 | $0.75 | $0.50 | $0.75 |
| 81 | Temp PVT MK line 24 - paint (70300281) | LF | 44 | $0.01 | $3.00 | $1.84 | $3.00 | $2.40 | $3.00 |
| 82 | Temp PVT MK L4 T4 tape (70307120) | LF | 1,534 | $0.01 | $1.30 | $1.38 | $1.30 | $3.00 | $1.30 |
| 83 | Sign panel T1 (72000100) | SF | 29 | $25.00 | $37.50 | $34.50 | $37.50 | $32.00 | $37.50 |
| 84 | Sign panel T2 (72000200) | SF | 20 | $30.00 | $45.00 | $51.75 | $45.00 | $40.00 | $45.00 |
| 85 | Remov sin pan assy TA (72400100) | EACH | 3 | $150.00 | $175.00 | $120.75 | $175.00 | $60.00 | $175.00 |
| 86 | Remov sin pan assy TB (72400200) | EACH | 2 | $150.00 | $175.00 | $120.75 | $175.00 | $138.00 | $175.00 |
| 87 | Remov sign panel T2 (72400320) | SF | 10 | $20.00 | $25.00 | $31.62 | $25.00 | $25.00 | $25.00 |
| 88 | Teles STL sin support (72800100) | LF | 92 | $20.00 | $25.00 | $21.00 | $25.00 | $23.00 | $25.00 |
| 89 | Mod ureth PM LTR-sym (78009000) | SF | 352 | $6.25 | $6.00 | $7.00 | $8.50 | $8.00 | $6.95 |
| 90 | Mod ureth PM line 4 (78009004) | LF | 3,179 | $0.95 | $0.90 | $1.04 | $1.05 | $1.25 | $1.05 |
| 91 | Mod ureth PM line 6 (78009006) | LF | 703 | $1.50 | $1.50 | $3.50 | $1.57 | $2.00 | $1.75 |
| 92 | Mod ureth PM line 12 (78009012) | LF | 372 | $3.00 | $3.00 | $5.75 | $4.25 | $3.85 | $3.45 |
| 93 | Mod ureth PM line 24 (78009024) | LF | 72 | $6.25 | $6.00 | $11.00 | $8.50 | $7.90 | $6.95 |
| 94 | PVT MKG rem grinding (78300201) | SF | 2,509 | $1.00 | $1.12 | $1.73 | $1.25 | $1.00 | $1.25 |
| 95 | PVT MKG rem WTR blast (78300202) | SF | 1,268 | $5.00 | $3.85 | $4.31 | $2.40 | $1.00 | $2.40 |
| 96 | Det loop T1 (88600100) | LF | 536 | $29.76 | $29.76 | $34.25 | $29.76 | $35.00 | $85.20 |
| 97 | Temp TR sig install (89000100) | EACH | 2 | $16,397 | $16,397 | $18,950 | $16,397 | $19,250 | $58,625 |
| 98 | Rebuild EX handhole (89502376) | EACH | 1 | $3,650.00 | $3,650.00 | $4,198.00 | $3,650.00 | $4,250.00 | $8,327.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.