IDOT contract 72540 bid tabulation
Section D6. Let by Illinois DOT on February 27, 2026, Various, District 06. 4 bids received; low bid $2,066,290 by Collins & Hermann, Inc..
- Owner
- Illinois DOT
- Letting
- 27 FEB 2026
- Pay items
- 40
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Collins & Hermann, Inc. | $2,066,290 | Low |
| 2 | Kujo, Inc. | $2,160,821 | +5.0% |
| 3 | CSD Environmental Services, Inc. | $2,360,401 | +14% |
| 4 | RoadSafe Traffic Systems, Inc. | $3,000,000 | +45% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Collins & Hermann, Inc. | 2. Kujo, Inc. | 3. CSD Environmental Services, Inc. | 4. RoadSafe Traffic Systems, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | SPBGR att to STR SPL (X6300155) | LF | 90 | $3.09 | $45.00 | $3.03 | $6.00 |
| 2 | Repair SPBGR TY A (X6300160) | LF | 1,825 | $24.99 | $22.00 | $22.10 | $30.00 |
| 3 | Repair TRBT T1 SP tan (X6310302) | EACH | 95 | $3,688.20 | $3,600.00 | $3,901.00 | $4,250.00 |
| 4 | Repair TRBT T1 SP FLR (X6310304) | EACH | 4 | $1,678.93 | $2,100.00 | $1,677.00 | $3,000.00 |
| 5 | Repair TR bar term T2 (X6310316) | EACH | 6 | $1,171.84 | $2,730.00 | $1,155.00 | $2,000.00 |
| 6 | Repair TR bar term T5 (X6310326) | EACH | 4 | $712.99 | $999.00 | $648.40 | $1,500.00 |
| 7 | Repair TR bar term T6 (X6310330) | EACH | 6 | $1,923.15 | $3,850.00 | $1,877.60 | $4,250.00 |
| 8 | GDRL post repair (X6330801) | EACH | 50 | $61.94 | $100.00 | $61.68 | $125.00 |
| 9 | Rem repl imp atten SM (X6431220) | EACH | 110 | $356.46 | $781.00 | $355.87 | $500.00 |
| 10 | Rep HTC (gibraltar) (X6440130) | LF | 25 | $0.99 | $23.00 | $0.99 | $2.00 |
| 11 | R HT term (gibraltar) (X6440131) | EACH | 10 | $286.00 | $1,345.00 | $285.70 | $500.00 |
| 12 | Rep posts (gibraltar) (X6440133) | EACH | 280 | $123.42 | $334.00 | $123.16 | $250.00 |
| 13 | R&R posts (gibraltar) (X6440134) | EACH | 240 | $488.86 | $125.00 | $495.95 | $500.00 |
| 14 | Rep high TC nucable (X6440140) | LF | 25 | $6.49 | $40.00 | $6.48 | $20.00 |
| 15 | Rep HT B term nucable (X6440141) | EACH | 5 | $1,097.91 | $1,500.00 | $1,097.00 | $2,000.00 |
| 16 | Repair post nucable (X6440143) | EACH | 25 | $39.86 | $335.00 | $39.73 | $100.00 |
| 17 | Rem repl post nucable (X6440144) | EACH | 550 | $155.33 | $140.00 | $155.00 | $250.00 |
| 18 | TC-prot call out work (X7011834) | EACH | 115 | $2,397.00 | $1,500.00 | $2,386.97 | $3,250.00 |
| 19 | TC-prot xpwy call out (X7011836) | EACH | 95 | $673.25 | $2,500.00 | $1,553.00 | $3,750.00 |
| 20 | Cable guard marker (X7250002) | EACH | 250 | $6.65 | $20.00 | $6.60 | $5.00 |
| 21 | Call out (Z0008759) | EACH | 66 | $3,359.52 | $1,200.00 | $5,672.99 | $6,750.00 |
| 22 | Emer work call out (Z0008760) | EACH | 60 | $3,359.52 | $2,625.00 | $5,730.99 | $7,500.00 |
| 23 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 | $15.00 | $15.00 |
| 24 | SPBGR TY A 6FT posts (63000001) | LF | 2,800 | $19.53 | $32.00 | $17.67 | $22.50 |
| 25 | SPBGR TY A 9FT posts (63000003) | LF | 175 | $19.42 | $35.00 | $17.95 | $50.00 |
| 26 | SPGR att to culvert (63000030) | LF | 50 | $13.40 | $40.00 | $15.15 | $100.00 |
| 27 | Traf bar term T2 (63100045) | EACH | 12 | $128.14 | $3,465.00 | $126.20 | $1,000.00 |
| 28 | Traf bar term T5 (63100070) | EACH | 12 | $115.95 | $1,890.00 | $106.34 | $1,000.00 |
| 29 | Traf bar term T6 (63100085) | EACH | 12 | $324.76 | $6,300.00 | $318.00 | $1,000.00 |
| 30 | TR bar TRM T1 SPL tan (63100167) | EACH | 40 | $6,400.55 | $5,565.00 | $4,259.00 | $4,500.00 |
| 31 | TR bar TRM T1 SPL FLR (63100169) | EACH | 5 | $2,879.13 | $4,515.00 | $2,809.50 | $4,500.00 |
| 32 | Guardrail remov (63200310) | LF | 3,250 | $3.72 | $7.00 | $3.69 | $5.00 |
| 33 | Imp atten NRD TL3 (64300450) | EACH | 1 | $8,413.64 | $15,000 | $8,408.40 | $20,000 |
| 34 | HT CBL med bar term (64401300) | EACH | 2 | $3,509.11 | $8,100.00 | $3,506.70 | $5,000.00 |
| 35 | CH LK fence 4 (66400105) | LF | 100 | $1.92 | $45.00 | $1.90 | $5.00 |
| 36 | Wov W fence 4 (66500105) | LF | 1,300 | $19.98 | $31.50 | $19.90 | $25.00 |
| 37 | Mobilization (67100100) | LS | 1 | $182,098 | $124,220 | $175,000 | $29,560 |
| 38 | Traf cont-prot 701411 (70100420) | EACH | 7 | $71.25 | $3,000.00 | $71.12 | $1,500.00 |
| 39 | Terminal marker - DA (72501000) | EACH | 45 | $18.13 | $63.00 | $18.00 | $50.00 |
| 40 | Grdrail ref type A (78200005) | EACH | 100 | $0.60 | $35.00 | $0.55 | $1.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.