IDOT contract 62T82 bid tabulation

Section FAP. Let by Illinois DOT on February 27, 2026, Lake, District 01. 2 bids received; low bid $1,524,058 by Martam Construction Incorporated.

Owner
Illinois DOT
Letting
27 FEB 2026
Pay items
102
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Martam Construction Incorporated$1,524,058Low
2Lorig Construction Company$1,711,138+12%
IDOT contract 62T82: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Martam Construction Incorporated2. Lorig Construction Company
1Temp LGHT SNGL LN STG (X0326276)LS1$134,179$25,000
2Sanitary force main 8 (X0328048)LF486$206.69$390.00
3Rem/DSP FRCMN & WTRMN (X1200276)LS1$10,075$9,600.00
4Rem & rein pipe culv (X5000015)LF30$147.44$325.00
5Cofferdam typ 1 IS WW (X5021512)EACH2$36,008$500.00
6SS D I T2 18 (X5504020)LF25$356.83$275.00
7Memb WTRPRF sys B STR (X5810103)SY89$56.00$70.00
8Engrs FLD ofc TY A D1 (X6700407)CAL MO12$5,248.52$3,500.00
9Traf cont & prot SPL (X7010216)LS1$111,616$235,000
10Temp info signing (X7200061)SF240$16.64$17.00
11RRPM reflector removl (X7830050)EACH73$15.80$12.00
12RRPM reflector replac (X7830052)EACH73$12.48$14.00
13Temp TR signal timing (X8900104)EACH3$2,267.20$2,200.00
14Construction layout (Z0013798)LS1$10,337$75,000
15Lum sfty CBL assembly (Z0033020)EACH1$554.32$600.00
16Rock fill - foundatn (Z0054406)CY34.80$125.93$250.00
17Trainees (Z0076600)HR500$0.80$0.80
18Trainees TPG (Z0076604)HR500$15.00$15.00
19Tree remov over 15 (20100210)UNIT38$93.60$90.00
20Earth excavation (20200100)CY824$51.79$60.00
21Furnished excavation (20400800)CY460$44.34$60.00
22Porous gran embank (20700220)CY90$81.59$200.00
23Trench backfill (20800150)CY50$82.69$90.00
24Geotech fab F/GR stab (21001000)SY61$6.70$6.00
25Topsoil exc & plac (21101505)CY76$64.65$95.00
26Topsoil F & P var DP (21101600)SY140$19.40$20.00
27Seeding CL 1A (25000110)ACRE0.03$16,640$16,000
28Seeding CL 2A (25000210)ACRE0.25$6,032.00$6,000.00
29Seeding CL 5B (25000324)ACRE0.25$6,032.00$6,000.00
30Nitrogen fert nutr (25000400)LB23$2.60$3.00
31Phosphorus fert nutr (25000500)LB23$2.60$3.00
32Potassium fert nutr (25000600)LB23$2.60$3.00
33Mulch method 2 (25100115)ACRE0.25$4,992.00$4,800.00
34Erosion contr blanket (25100630)SY2,582$1.77$1.75
35Temp eros contr seed (28000250)LB26$10.40$10.00
36Temp ditch checks (28000305)LF235$16.64$16.00
37Perimeter eros bar (28000400)LF661$3.95$4.00
38Inlet filters (28000510)EACH1$286.00$300.00
39Stone riprap CL A4 (28100107)SY117$111.49$195.00
40Filter fabric (28200200)SY117$6.89$3.50
41Aggregate ditch (28300400)TON47$131.32$71.00
42Agg subgrade improve (30300001)CY25$70.57$180.00
43Agg subgrade impr 12 (30300112)SY501$33.25$45.00
44Bit matls tack CT (40600290)LB858$0.01$0.01
45Long joint sealant (40600370)LF864$15.85$14.00
46HMA BC IL-19.0 N90 (40603090)TON76$250.25$225.00
47HMA SC IL-9.5 D N70 (40604062)TON181$140.98$131.00
48Pavement rem (44000100)SY191$27.36$37.00
49HMA surf rem 2 (44000157)SY1,435$9.06$8.00
50Comb curb gutter rem (44000500)LF309$8.77$21.00
51Paved ditch removal (44004000)LF43$27.96$60.00
52Paved SHLD removal (44004250)SY77$33.95$42.00
53Aggregate SHLDS B 4 (48101498)SY199$25.94$30.00
54HMA shoulders 10 (48203037)SY268$105.88$100.00
55HMA shoulders (48203100)TON12$198.16$175.00
56Rem exist struct (50100100)EACH2$27,741$100.00
57Pipe culvert remov (50105220)LF15$110.51$35.00
58Structure excavation (50200100)CY153$86.30$130.00
59Rem/disp uns matl-STR (50200450)CY52$86.30$150.00
60Protective coat (50300300)SY6$68.75$5.00
61Reinf bars, epoxy CTD (50800205)LB19,920$2.14$2.00
62Bar splicers (50800515)EACH68$39.03$60.00
63Temp SHT piling (52200010)SF1,070$58.44$50.00
64Conc box cul (54003000)CY95.50$2,051.94$2,400.00
65Concrete collar (54248510)CY1$4,438.04$1,600.00
66Storm sewer rem 12 (55100500)LF2$110.62$30.00
67Storm sewer rem 18 (55100900)LF13$110.74$33.00
68Conc HDWL for P drain (60100060)EACH4$441.33$1,100.00
69Pipe underdr T 2 4 (60108204)LF418$29.61$58.00
70Remov inlets (60500060)EACH1$509.39$500.00
71Class SI conc outlet (60600095)CY1.80$1,228.12$1,700.00
72SPBGR TY A 6FT posts (63000001)LF250$33.68$45.00
73LSG OV cul 18'9" span (63000360)LF88$46.08$41.00
74TR bar TRM T1 SPL tan (63100167)EACH4$3,994.34$3,800.00
75Guardrail remov (63200310)LF271$16.96$10.00
76Non SPL waste disposl (66900200)CY565$80.24$90.00
77Soil disposal analy (66900530)EACH1$1,508.00$1,500.00
78Reg sub P-const plan (66901001)LS1$3,224.00$3,200.00
79Reg sub F con report (66901003)LS1$1,248.00$1,200.00
80Reg sub mon (66901006)CAL DAY30$707.20$850.00
81Mobilization (67100100)LS1$91,443$95,000
82Changeable message SN (70107025)CAL DAY158$39.52$38.00
83SHRT TRM pavt MK rem (70300150)SF5,264$0.41$0.40
84Temp PVT MK LTR & sym T4 tape (70307100)SF41$8.32$8.00
85Temp PVT MK L4 T4 tape (70307120)LF7,077$1.40$1.40
86Temp PVT MK L6 T4 tape (70307130)LF91$2.08$2.00
87Temp PVT MK L12 T4 tape (70307160)LF369$4.16$4.00
88Temp PVT MK L24 T4 tape (70307210)LF155$8.11$8.00
89Temp conc barrier (70400100)LF662.50$37.98$34.00
90Rel temp conc barrier (70400200)LF587.50$13.16$7.00
91Imp attn temp FRN TL3 (70600260)EACH2$5,203.27$4,600.00
92Imp attn rel FRN TL2 (70600322)EACH2$3,705.67$2,300.00
93THPL PVT MK LTR & sym (78000100)SF124$6.76$7.00
94THPL PVT MK line 4 (78000200)LF5,360$1.30$1.25
95THPL PVT MK line 6 (78000400)LF965$1.72$1.75
96THPL PVT MK line 12 (78000600)LF107$3.33$3.50
97THPL PVT MK line 24 (78000650)LF73$6.76$7.00
98Raised refl pavt MKR (78100100)EACH4$1,144.00$1,100.00
99Grdrail ref type A (78200005)EACH8$14.62$12.00
100Raised ref PVT MK rem (78300200)EACH4$16.99$10.00
101PVT MKG rem WTR blast (78300202)SF2,295$1.64$1.60
102Temp TR sig install (89000100)EACH1$28,101$100,000
IDOT contract 62T82: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy