IDOT contract 62T82 bid tabulation
Section FAP. Let by Illinois DOT on February 27, 2026, Lake, District 01. 2 bids received; low bid $1,524,058 by Martam Construction Incorporated.
- Owner
- Illinois DOT
- Letting
- 27 FEB 2026
- Pay items
- 102
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Martam Construction Incorporated | $1,524,058 | Low |
| 2 | Lorig Construction Company | $1,711,138 | +12% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Martam Construction Incorporated | 2. Lorig Construction Company |
|---|---|---|---|---|---|
| 1 | Temp LGHT SNGL LN STG (X0326276) | LS | 1 | $134,179 | $25,000 |
| 2 | Sanitary force main 8 (X0328048) | LF | 486 | $206.69 | $390.00 |
| 3 | Rem/DSP FRCMN & WTRMN (X1200276) | LS | 1 | $10,075 | $9,600.00 |
| 4 | Rem & rein pipe culv (X5000015) | LF | 30 | $147.44 | $325.00 |
| 5 | Cofferdam typ 1 IS WW (X5021512) | EACH | 2 | $36,008 | $500.00 |
| 6 | SS D I T2 18 (X5504020) | LF | 25 | $356.83 | $275.00 |
| 7 | Memb WTRPRF sys B STR (X5810103) | SY | 89 | $56.00 | $70.00 |
| 8 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $5,248.52 | $3,500.00 |
| 9 | Traf cont & prot SPL (X7010216) | LS | 1 | $111,616 | $235,000 |
| 10 | Temp info signing (X7200061) | SF | 240 | $16.64 | $17.00 |
| 11 | RRPM reflector removl (X7830050) | EACH | 73 | $15.80 | $12.00 |
| 12 | RRPM reflector replac (X7830052) | EACH | 73 | $12.48 | $14.00 |
| 13 | Temp TR signal timing (X8900104) | EACH | 3 | $2,267.20 | $2,200.00 |
| 14 | Construction layout (Z0013798) | LS | 1 | $10,337 | $75,000 |
| 15 | Lum sfty CBL assembly (Z0033020) | EACH | 1 | $554.32 | $600.00 |
| 16 | Rock fill - foundatn (Z0054406) | CY | 34.80 | $125.93 | $250.00 |
| 17 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 |
| 18 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 |
| 19 | Tree remov over 15 (20100210) | UNIT | 38 | $93.60 | $90.00 |
| 20 | Earth excavation (20200100) | CY | 824 | $51.79 | $60.00 |
| 21 | Furnished excavation (20400800) | CY | 460 | $44.34 | $60.00 |
| 22 | Porous gran embank (20700220) | CY | 90 | $81.59 | $200.00 |
| 23 | Trench backfill (20800150) | CY | 50 | $82.69 | $90.00 |
| 24 | Geotech fab F/GR stab (21001000) | SY | 61 | $6.70 | $6.00 |
| 25 | Topsoil exc & plac (21101505) | CY | 76 | $64.65 | $95.00 |
| 26 | Topsoil F & P var DP (21101600) | SY | 140 | $19.40 | $20.00 |
| 27 | Seeding CL 1A (25000110) | ACRE | 0.03 | $16,640 | $16,000 |
| 28 | Seeding CL 2A (25000210) | ACRE | 0.25 | $6,032.00 | $6,000.00 |
| 29 | Seeding CL 5B (25000324) | ACRE | 0.25 | $6,032.00 | $6,000.00 |
| 30 | Nitrogen fert nutr (25000400) | LB | 23 | $2.60 | $3.00 |
| 31 | Phosphorus fert nutr (25000500) | LB | 23 | $2.60 | $3.00 |
| 32 | Potassium fert nutr (25000600) | LB | 23 | $2.60 | $3.00 |
| 33 | Mulch method 2 (25100115) | ACRE | 0.25 | $4,992.00 | $4,800.00 |
| 34 | Erosion contr blanket (25100630) | SY | 2,582 | $1.77 | $1.75 |
| 35 | Temp eros contr seed (28000250) | LB | 26 | $10.40 | $10.00 |
| 36 | Temp ditch checks (28000305) | LF | 235 | $16.64 | $16.00 |
| 37 | Perimeter eros bar (28000400) | LF | 661 | $3.95 | $4.00 |
| 38 | Inlet filters (28000510) | EACH | 1 | $286.00 | $300.00 |
| 39 | Stone riprap CL A4 (28100107) | SY | 117 | $111.49 | $195.00 |
| 40 | Filter fabric (28200200) | SY | 117 | $6.89 | $3.50 |
| 41 | Aggregate ditch (28300400) | TON | 47 | $131.32 | $71.00 |
| 42 | Agg subgrade improve (30300001) | CY | 25 | $70.57 | $180.00 |
| 43 | Agg subgrade impr 12 (30300112) | SY | 501 | $33.25 | $45.00 |
| 44 | Bit matls tack CT (40600290) | LB | 858 | $0.01 | $0.01 |
| 45 | Long joint sealant (40600370) | LF | 864 | $15.85 | $14.00 |
| 46 | HMA BC IL-19.0 N90 (40603090) | TON | 76 | $250.25 | $225.00 |
| 47 | HMA SC IL-9.5 D N70 (40604062) | TON | 181 | $140.98 | $131.00 |
| 48 | Pavement rem (44000100) | SY | 191 | $27.36 | $37.00 |
| 49 | HMA surf rem 2 (44000157) | SY | 1,435 | $9.06 | $8.00 |
| 50 | Comb curb gutter rem (44000500) | LF | 309 | $8.77 | $21.00 |
| 51 | Paved ditch removal (44004000) | LF | 43 | $27.96 | $60.00 |
| 52 | Paved SHLD removal (44004250) | SY | 77 | $33.95 | $42.00 |
| 53 | Aggregate SHLDS B 4 (48101498) | SY | 199 | $25.94 | $30.00 |
| 54 | HMA shoulders 10 (48203037) | SY | 268 | $105.88 | $100.00 |
| 55 | HMA shoulders (48203100) | TON | 12 | $198.16 | $175.00 |
| 56 | Rem exist struct (50100100) | EACH | 2 | $27,741 | $100.00 |
| 57 | Pipe culvert remov (50105220) | LF | 15 | $110.51 | $35.00 |
| 58 | Structure excavation (50200100) | CY | 153 | $86.30 | $130.00 |
| 59 | Rem/disp uns matl-STR (50200450) | CY | 52 | $86.30 | $150.00 |
| 60 | Protective coat (50300300) | SY | 6 | $68.75 | $5.00 |
| 61 | Reinf bars, epoxy CTD (50800205) | LB | 19,920 | $2.14 | $2.00 |
| 62 | Bar splicers (50800515) | EACH | 68 | $39.03 | $60.00 |
| 63 | Temp SHT piling (52200010) | SF | 1,070 | $58.44 | $50.00 |
| 64 | Conc box cul (54003000) | CY | 95.50 | $2,051.94 | $2,400.00 |
| 65 | Concrete collar (54248510) | CY | 1 | $4,438.04 | $1,600.00 |
| 66 | Storm sewer rem 12 (55100500) | LF | 2 | $110.62 | $30.00 |
| 67 | Storm sewer rem 18 (55100900) | LF | 13 | $110.74 | $33.00 |
| 68 | Conc HDWL for P drain (60100060) | EACH | 4 | $441.33 | $1,100.00 |
| 69 | Pipe underdr T 2 4 (60108204) | LF | 418 | $29.61 | $58.00 |
| 70 | Remov inlets (60500060) | EACH | 1 | $509.39 | $500.00 |
| 71 | Class SI conc outlet (60600095) | CY | 1.80 | $1,228.12 | $1,700.00 |
| 72 | SPBGR TY A 6FT posts (63000001) | LF | 250 | $33.68 | $45.00 |
| 73 | LSG OV cul 18'9" span (63000360) | LF | 88 | $46.08 | $41.00 |
| 74 | TR bar TRM T1 SPL tan (63100167) | EACH | 4 | $3,994.34 | $3,800.00 |
| 75 | Guardrail remov (63200310) | LF | 271 | $16.96 | $10.00 |
| 76 | Non SPL waste disposl (66900200) | CY | 565 | $80.24 | $90.00 |
| 77 | Soil disposal analy (66900530) | EACH | 1 | $1,508.00 | $1,500.00 |
| 78 | Reg sub P-const plan (66901001) | LS | 1 | $3,224.00 | $3,200.00 |
| 79 | Reg sub F con report (66901003) | LS | 1 | $1,248.00 | $1,200.00 |
| 80 | Reg sub mon (66901006) | CAL DAY | 30 | $707.20 | $850.00 |
| 81 | Mobilization (67100100) | LS | 1 | $91,443 | $95,000 |
| 82 | Changeable message SN (70107025) | CAL DAY | 158 | $39.52 | $38.00 |
| 83 | SHRT TRM pavt MK rem (70300150) | SF | 5,264 | $0.41 | $0.40 |
| 84 | Temp PVT MK LTR & sym T4 tape (70307100) | SF | 41 | $8.32 | $8.00 |
| 85 | Temp PVT MK L4 T4 tape (70307120) | LF | 7,077 | $1.40 | $1.40 |
| 86 | Temp PVT MK L6 T4 tape (70307130) | LF | 91 | $2.08 | $2.00 |
| 87 | Temp PVT MK L12 T4 tape (70307160) | LF | 369 | $4.16 | $4.00 |
| 88 | Temp PVT MK L24 T4 tape (70307210) | LF | 155 | $8.11 | $8.00 |
| 89 | Temp conc barrier (70400100) | LF | 662.50 | $37.98 | $34.00 |
| 90 | Rel temp conc barrier (70400200) | LF | 587.50 | $13.16 | $7.00 |
| 91 | Imp attn temp FRN TL3 (70600260) | EACH | 2 | $5,203.27 | $4,600.00 |
| 92 | Imp attn rel FRN TL2 (70600322) | EACH | 2 | $3,705.67 | $2,300.00 |
| 93 | THPL PVT MK LTR & sym (78000100) | SF | 124 | $6.76 | $7.00 |
| 94 | THPL PVT MK line 4 (78000200) | LF | 5,360 | $1.30 | $1.25 |
| 95 | THPL PVT MK line 6 (78000400) | LF | 965 | $1.72 | $1.75 |
| 96 | THPL PVT MK line 12 (78000600) | LF | 107 | $3.33 | $3.50 |
| 97 | THPL PVT MK line 24 (78000650) | LF | 73 | $6.76 | $7.00 |
| 98 | Raised refl pavt MKR (78100100) | EACH | 4 | $1,144.00 | $1,100.00 |
| 99 | Grdrail ref type A (78200005) | EACH | 8 | $14.62 | $12.00 |
| 100 | Raised ref PVT MK rem (78300200) | EACH | 4 | $16.99 | $10.00 |
| 101 | PVT MKG rem WTR blast (78300202) | SF | 2,295 | $1.64 | $1.60 |
| 102 | Temp TR sig install (89000100) | EACH | 1 | $28,101 | $100,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.