IDOT contract 61L39 bid tabulation

North Aurora, section 21-00057-00-CH. Let by Illinois DOT on February 27, 2026, Kane, District 01. 3 bids received; low bid $2,691,498 by Geneva Construction Company.

Owner
Illinois DOT
Letting
27 FEB 2026
Pay items
144
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Geneva Construction Company$2,691,498Low
2Builders Paving, LLC$2,808,088+4.0%
3Plote Construction, Inc.$3,128,000+16%
IDOT contract 61L39: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Geneva Construction Company2. Builders Paving, LLC3. Plote Construction, Inc.
13 cell fab innerduct (XX008963)LF439$20.10$20.10$20.10
2EM veh P S LSC 20 3C (X0324085)LF1,252$2.64$2.64$2.64
3Network configuration (X1400101)LS1$20,000$20,000$20,000
4Serv instl GR MT MTR (X1400150)EACH1$4,260.00$4,260.00$4,260.00
5Lyr II datalink SWTCH (X1400216)EACH1$17,500$17,500$17,500
6Ped signal post 10 FT (X1400367)EACH1$2,158.80$2,158.80$2,158.80
7HMA driveway pavt 4 (X4060282)SY201$50.00$65.00$75.00
8PC conc sidewalk 5 SP (X4240430)SF3,702$10.10$11.50$15.00
9PC conc sidewalk 6 SP (X4240440)SF527$11.50$12.50$15.00
10Detectable warn SPL (X4240800)SF100$38.00$42.00$30.00
11CC&G RMVL repl < = 10 (X4400501)LF201$61.50$60.00$60.00
12CC&G RMVL repl > 10FT (X4400503)LF715$53.50$60.00$65.00
13HMA surf rem var DP (X4401198)SY47,600$2.90$3.65$3.79
14Foundation rem (X5011100)EACH1$1,500.00$1,000.00$2,500.00
15Sanitary manhole adj (X6026050)EACH1$1,400.00$750.00$750.00
16Traf cont & prot SPL (X7010216)LS1$89,000$55,000$85,110
17Temp info signing (X7200061)SF52$18.00$18.00$18.00
18Rem RE-E EX LGT unit (X8440120)EACH3$2,250.00$2,250.00$2,250.00
19Fac T super R cab (X8570234)EACH1$27,953$27,953$27,953
20Uninter power sup SPL (X8620200)EACH1$6,404.00$6,404.00$6,404.00
21Fib opt CBL 36F SM (X8710031)LF471$4.43$4.43$4.43
22Accessible ped signal (X8760200)EACH4$2,623.05$2,623.05$2,623.05
23Conc FDN TY A 12D (X8780012)LF4$379.05$379.50$379.50
24Vid veh det sys SN AP (X8891009)EACH4$9,500.00$9,500.00$9,500.00
25Mod EX contr & cab (X8950114)EACH1$4,020.00$4,020.00$4,020.00
26Construction layout (Z0013798)LS1$32,900$40,000$41,000
27Drainage STR removed (Z0018700)EACH6$225.00$1,000.00$1,000.00
28RE-optimize TR sig sys 2 (Z0033046)EACH1$1,365.00$1,365.00$1,365.00
29Trainees (Z0076600)HR500$0.80$0.80$0.80
30Trainees TPG (Z0076604)HR500$15.00$15.00$15.00
31Earth excavation (20200100)CY1,303$38.50$76.00$60.00
32Rem & disp uns matl (20201200)CY598$46.25$76.00$15.00
33Trench backfill (20800150)CY47$23.00$70.00$70.00
34Geotech fab F/GR stab (21001000)SY1,309$2.00$3.00$1.00
35Topsoil F & P 6 (21101625)SY1,986$9.00$6.15$9.00
36Topsoil F & P 24 (21101685)SY598$24.00$18.00$24.00
37Explor trench 72 (21301072)LF100$25.00$100.00$100.00
38Seeding CL 2A (25000210)ACRE1$2,500.00$4,500.00$2,500.00
39Nitrogen fert nutr (25000400)LB36$3.00$3.00$3.00
40Phosphorus fert nutr (25000500)LB36$3.00$3.00$3.00
41Potassium fert nutr (25000600)LB36$3.00$3.00$3.00
42Erosion contr blanket (25100630)SY1,992$1.75$4.25$1.75
43Temp eros contr seed (28000250)LB15$5.00$3.25$5.00
44Perimeter eros bar (28000400)LF984$3.50$4.25$3.50
45Inlet filters (28000510)EACH105$100.00$150.00$100.00
46Agg subgrade improve (30300001)CY334$42.75$70.00$15.00
47Agg subgrade impr 12 (30300112)SY1,309$22.00$35.00$45.00
48Agg base cse B 4 (35101600)SY451$4.00$4.00$15.00
49Agg base cse B 10 (35102200)SY201$19.75$40.00$35.00
50HMA base cse 9 3/4 (35501323)SY659$58.00$57.50$80.00
51HMA BC wid 9 3/4 (35600715)SY650$69.00$57.50$80.00
52Bit matls PR CT (40600275)LB2,945$0.01$0.01$0.01
53Bit matls tack CT (40600290)LB32,368$0.01$0.01$0.01
54Long joint sealant (40600370)LF20,756$3.10$3.50$3.60
55Mix CR JTS flangewys (40600400)TON25$100.00$550.00$900.00
56HMA surf rem butt JT (40600982)SY400$10.00$40.00$24.00
57P HMA BC IL-4.75 N50 (40603200)TON2,120$110.00$100.00$135.00
58HMA SC IL-9.5 D N70 (40604062)TON5,480$94.00$72.00$100.00
59Pavement rem (44000100)SY1,049$23.00$25.00$44.00
60Drive pavement rem (44000200)SY252$18.00$20.00$25.00
61Comb curb gutter rem (44000500)LF2,744$9.50$10.00$9.00
62Sidewalk rem (44000600)SF4,050$1.85$3.50$2.40
63Median removal (44003100)SF7,216$3.00$5.00$0.01
64CL D patch T1 10 (44201761)SY100$20.00$75.00$145.00
65CL D patch T2 10 (44201765)SY250$20.00$75.00$145.00
66CL D patch T3 10 (44201769)SY500$20.00$75.00$145.00
67CL D patch T4 10 (44201771)SY500$20.00$75.00$145.00
68Storm sew CL A 1 12 (550A0050)LF245$225.00$65.00$65.00
69Storm sewer rem 12 (55100500)LF31$10.00$40.00$40.00
70Fire hydnts to BE rem (56400500)EACH1$1,885.00$1,275.00$1,275.00
71Fire hydrants (56400600)EACH1$13,855$11,000$11,000
72Pipe underdr T 2 4 (60108204)LF1,465$35.00$33.00$33.00
73CB TA 4 dia T4F&G (60200405)EACH7$6,250.00$3,300.00$3,300.00
74CB TA 4 dia T9F&G (60200905)EACH2$6,250.00$3,800.00$3,800.00
75Inlets TA T4F&G (60235800)EACH2$3,150.00$450.00$450.00
76Man adjust (60255500)EACH8$670.00$450.00$450.00
77Inlets adjust (60260100)EACH53$400.00$450.00$450.00
78VV adjust (60265700)EACH4$700.00$450.00$450.00
79Comb CC&G TB6.12 (60603800)LF3,002$28.00$31.00$38.00
80Conc median surf 4 (60618300)SF1,155$8.00$10.00$7.50
81Conc med surf corr (60618390)SF80$17.00$11.00$15.00
82Conc med TSB6.12 (60619600)SF773$25.00$16.00$27.00
83Non SPL waste disposl (66900200)CY300$100.00$125.00$90.00
84Soil disposal analy (66900530)EACH2$865.00$1,450.00$1,450.00
85Reg sub P-const plan (66901001)LS1$5,200.00$3,100.00$3,100.00
86Reg sub F con report (66901003)LS1$500.00$1,200.00$1,200.00
87Reg sub mon (66901006)CAL DAY20$357.50$680.00$680.00
88Mobilization (67100100)LS1$163,000$128,919$192,000
89Changeable message SN (70107025)CAL DAY640$30.00$30.00$30.00
90Short term pavt mking (70300100)LF11,312$0.01$0.90$0.01
91SHRT TRM pavt MK rem (70300150)SF30,727$0.01$0.20$0.01
92Temp PVT MK LTR & sym T4 tape (70307100)SF3,801$1.50$3.75$2.00
93Temp PVT MK L4 T4 tape (70307120)LF29,436$0.50$1.20$0.40
94Temp PVT MK L6 T4 tape (70307130)LF7,568$0.75$1.80$0.60
95Temp PVT MK L8 T4 tape (70307140)LF400$1.00$2.40$1.20
96Temp PVT MK L12 T4 tape (70307160)LF14,726$1.50$3.60$1.50
97Temp PVT MK L24 T4 tape (70307210)LF1,150$1.80$7.20$7.20
98Sign panel T1 (72000100)SF61$30.00$30.00$30.00
99Sign panel T2 (72000200)SF30$45.00$45.00$45.00
100Remov sin pan assy TA (72400100)EACH13$105.00$105.00$105.00
101Remov sin pan assy TB (72400200)EACH3$105.00$105.00$105.00
102Reloc sin pan assy TA (72400500)EACH5$150.00$150.00$150.00
103Reloc sin pan assy TB (72400600)EACH2$150.00$150.00$150.00
104Teles STL sin support (72800100)LF120$18.00$18.00$18.00
105Base tel STL sin supp (73100100)EACH3$110.00$110.00$110.00
106THPL PVT MK LTR & sym (78000100)SF1,188$6.00$5.75$5.75
107THPL PVT MK line 4 (78000200)LF8,878$0.75$0.90$0.90
108THPL PVT MK line 6 (78000400)LF5,887$1.15$0.95$0.95
109THPL PVT MK line 8 (78000500)LF514$2.00$1.95$1.95
110THPL PVT MK line 12 (78000600)LF1,414$3.50$3.32$3.32
111THPL PVT MK line 24 (78000650)LF545$6.00$5.75$5.75
112PVT MKG rem grinding (78300201)SF3,500$1.50$1.50$1.50
113PVT MKG rem WTR blast (78300202)SF700$6.50$6.50$6.50
114Undrgrd C galvs 3 (81028220)LF63$43.16$43.16$43.16
115Undrgrd C galvs 4 (81028240)LF496$79.16$79.16$79.16
116Undrgrd C CNC 4 (81028790)LF429$45.32$45.32$45.32
117Handhole (81400100)EACH4$3,067.50$3,067.50$3,067.50
118DBL handhole (81400300)EACH1$6,360.00$6,360.00$6,360.00
119Light pole FDN 24D (83600200)LF18$388.25$388.25$388.25
120Bkwy dev cou alu SKRT ovr SSS (83800506)EACH5$720.75$720.75$720.75
121Rem pole FDN (84200804)EACH3$840.00$840.00$840.00
122Main EX TR sig instal (85000200)EACH3$4,447.50$4,447.50$4,447.50
123Elcbl C tracer 14 1C (87300925)LF471$2.09$2.09$2.09
124Elcbl C signal 14 2C (87301215)LF714$2.34$2.34$2.34
125Elcbl C signal 14 3C (87301225)LF1,586$2.52$2.52$2.52
126Elcbl C signal 14 5C (87301245)LF1,295$2.90$2.90$2.90
127Elcbl C signal 14 7C (87301255)LF1,786$3.29$3.29$3.29
128Elcbl C serv 6 2C (87301805)LF10$4.12$4.12$4.12
129Elcbl C egrdc 6 1C (87301900)LF874$2.99$2.99$2.99
130S maa & P 46 (87700270)EACH1$21,961$21,961$21,961
131S maa & P 48 (87700280)EACH1$22,052$22,052$22,052
132S maa & P 54 (87700310)EACH1$23,273$23,273$23,273
133S maa & P 58 (87700340)EACH1$27,726$27,726$27,726
134Conc FDN TY C (87800150)LF3$1,282.50$1,282.50$1,282.50
135Conc FDN TY E 36D (87800415)LF41$547.50$547.50$547.50
136Conc FDN TY E 42D (87800420)LF21$800.00$800.00$800.00
137Drill EX handhole (87900200)EACH1$840.00$840.00$840.00
138SH LED 1F 3S mam (88030020)EACH6$1,045.80$1,045.80$1,045.80
139SH LED 1F 5S BM (88030100)EACH4$1,051.00$1,051.00$1,051.00
140SH LED 1F 5S mam (88030110)EACH4$1,229.80$1,229.80$1,229.80
141Ped SH LED 1F BM CDT (88102717)EACH4$764.20$764.20$764.20
142TS backplate louvered (88200110)EACH10$251.83$251.83$251.83
143Light detector (88700200)EACH4$2,711.60$2,711.60$2,711.60
144Light detector amp (88700300)EACH1$6,621.00$6,621.00$6,621.00
IDOT contract 61L39: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy