IDOT contract 76U67 bid tabulation

Section 33PP-1,. Let by Illinois DOT on February 27, 2026, St. Clair, District 08. 1 bid received; low bid $1,246,663 by Christ Bros. Asphalt, Inc..

Owner
Illinois DOT
Letting
27 FEB 2026
Pay items
31
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Christ Bros. Asphalt, Inc.$1,246,663Low
IDOT contract 76U67: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Christ Bros. Asphalt, Inc.
1Part dep rem T2 5 (X4406250)SY49$29.24
2Part dep rem T3 5 (X4406450)SY18$29.24
3Part dep rem T4 5 (X4406650)SY4,300$29.24
4Partial depth patch (X4421000)TON1,223$285.67
5Fibr mod asp CRK seal (40400001)LF8,030$5.00
6Asph EM slurry seal (40400002)SY25,326$6.24
7Bump removal (40400020)EACH30$100.00
8Bit matls tack CT (40600290)LB9,402$0.50
9P bit matls tack CT (40600295)LB1,994$0.50
10CL C patch T2 11 (44201365)SY144$280.00
11CL C patch T3 11 (44201369)SY18$280.00
12CL C patch T4 11 (44201371)SY612$280.00
13Mobilization (67100100)LS1$118,001
14TR cont & prot 701501 (70102620)LS1$98,433
15TR cont & prot 701606 (70102625)LS1$0.01
16TR cont & prot 701601 (70102630)LS1$0.01
17TR cont & prot 701611 (70102634)LS1$0.01
18TR cont & prot 701701 (70102635)LS1$0.01
19Changeable message SN (70107025)CAL DAY225$85.00
20Short term pavt mking (70300100)LF5,443$2.25
21SHRT TRM pavt MK rem (70300150)SF910$0.01
22Temp PVT MK LTR & sym paint (70300211)SF65$0.01
23Temp PVT MK line 6 - paint (70300241)LF36,462$0.01
24Temp PVT MK line 24 - paint (70300281)LF65$0.01
25THPL PVT MK LTR & sym (78000100)SF78$30.00
26THPL PVT MK line 6 (78000400)LF36,462$1.00
27THPL PVT MK line 24 (78000650)LF65$30.00
28Paint PVT MK line 4 (78001110)LF2,838$1.25
29Raised refl pavt MKR (78100100)EACH193$53.50
30Raised ref PVT MK rem (78300200)EACH193$90.00
31PVT MKG rem grinding (78300201)SF9,156$2.82
IDOT contract 76U67: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy