IDOT contract 64U03 bid tabulation
Section (103-1,2)RA&RS. Let by Illinois DOT on February 27, 2026, Lasalle, District 02. 2 bids received; low bid $14,540,979 by Rock Road Companies, Inc..
- Owner
- Illinois DOT
- Letting
- 27 FEB 2026
- Pay items
- 53
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rock Road Companies, Inc. | $14,540,979 | Low |
| 2 | Curran Contracting Company | $14,968,831 | +3.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rock Road Companies, Inc. | 2. Curran Contracting Company |
|---|---|---|---|---|---|
| 1 | UT bon W CRS IL 9.5 utb mix D (X0300031) | SY | 537,003 | $7.15 | $7.05 |
| 2 | Geotechnical reinf (X2100104) | SY | 406 | $1.00 | $1.00 |
| 3 | Bit matls FS (X4060107) | LB | 268,622 | $0.79 | $0.01 |
| 4 | STR refl CR CTRL TRTMT (X4430200) | LF | 427,849 | $0.89 | $1.10 |
| 5 | Cold milling SPL (Z0010910) | SY | 536,813 | $1.79 | $1.90 |
| 6 | Trainees (Z0076600) | HR | 1,000 | $0.80 | $0.80 |
| 7 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 |
| 8 | Agg subgrade improve (30300001) | CY | 91 | $25.00 | $25.00 |
| 9 | Rap set poly mod emul (40600250) | LB | 241,652 | $1.95 | $1.25 |
| 10 | Bit matls tack CT (40600290) | LB | 80,901 | $1.04 | $0.01 |
| 11 | HMA surf rem butt JT (40600982) | SY | 780 | $41.29 | $15.00 |
| 12 | HMA BC IL-19.0 N90 (40603090) | TON | 27,953 | $94.73 | $89.95 |
| 13 | HMA SC IL-9.5 D N90 (40604064) | TON | 11,980 | $103.83 | $98.15 |
| 14 | Welded wire reinf (42000060) | SY | 502 | $0.01 | $0.01 |
| 15 | HMA surf rem 5 (44000169) | SY | 142,617 | $6.88 | $9.85 |
| 16 | CL A patch T2 15 (44200630) | SY | 752 | $350.00 | $350.00 |
| 17 | CL A patch T3 15 (44200631) | SY | 175 | $350.00 | $350.00 |
| 18 | CL A patch T4 15 (44200632) | SY | 130 | $350.00 | $350.00 |
| 19 | CL B patch T2 10.5 (44200972) | SY | 466 | $325.00 | $325.00 |
| 20 | CL B patch T3 10.5 (44200975) | SY | 79 | $325.00 | $325.00 |
| 21 | CL B patch T4 10 1/2 (44200977) | SY | 424 | $325.00 | $325.00 |
| 22 | Dowel bars 1 1/2 (44201299) | EACH | 1,484 | $35.00 | $35.00 |
| 23 | Patch reinforcement (44213000) | SY | 1,055 | $95.00 | $95.00 |
| 24 | Saw cuts (44213200) | LF | 10,157 | $2.75 | $2.75 |
| 25 | Tie bars 3/4 (44213204) | EACH | 55 | $30.00 | $30.00 |
| 26 | JT or crack filling (45200300) | LB | 320,886 | $1.31 | $1.31 |
| 27 | Agg wedge SHLD type B (48102100) | TON | 336 | $53.02 | $31.50 |
| 28 | Shoulder rum strip 16 (64200116) | LF | 390,127 | $0.37 | $0.35 |
| 29 | Engr field office A (67000400) | CAL MO | 9 | $2,750.00 | $3,000.00 |
| 30 | Mobilization (67100100) | LS | 1 | $823,000 | $1,071,000 |
| 31 | Traf cont-prot 701411 (70100420) | EACH | 16 | $100.00 | $300.00 |
| 32 | Traf cont-prot 701406 (70100700) | LS | 1 | $1.00 | $1.00 |
| 33 | Traf cont-prot 701401 (70100800) | LS | 1 | $138,000 | $600,000 |
| 34 | Traf cont-prot 701456 (70100825) | LS | 1 | $1.00 | $5,001.00 |
| 35 | TR cont surveillance (70103815) | CAL DAY | 30 | $350.00 | $350.00 |
| 36 | Changeable message SN (70107025) | CAL DAY | 28 | $30.00 | $30.00 |
| 37 | Short term pavt mking (70300100) | LF | 77,064 | $1.94 | $1.25 |
| 38 | SHRT TRM pavt MK rem (70300150) | SF | 13,121 | $6.30 | $2.75 |
| 39 | Pref PL PM TD STD L 6 (78004630) | LF | 50,588 | $7.00 | $7.00 |
| 40 | Pref PL PM TD STD L 9 (78004645) | LF | 1,083 | $10.50 | $10.50 |
| 41 | Mod ureth PM LTR-sym (78009000) | SF | 25 | $10.00 | $10.00 |
| 42 | Mod ureth PM line 4 (78009004) | LF | 435,805 | $0.50 | $0.50 |
| 43 | Mod ureth PM line 8 (78009008) | LF | 12,865 | $0.70 | $0.70 |
| 44 | Mod ureth PM line 12 (78009012) | LF | 2,472 | $3.00 | $3.00 |
| 45 | GRV RCSD PM LTR & sym (78011000) | SF | 32 | $5.00 | $5.00 |
| 46 | GRV RCSD PVT MRKG 5 (78011025) | LF | 435,805 | $0.33 | $0.33 |
| 47 | GRV RCSD PVT MRKG 7 (78011035) | LF | 50,589 | $0.50 | $0.50 |
| 48 | GRV RCSD PVT MRKG 9 (78011045) | LF | 12,865 | $0.65 | $0.65 |
| 49 | GRV RCSD PVT MRKG 10 (78011050) | LF | 1,083 | $1.00 | $1.00 |
| 50 | GRV RCSD PVT MRKG 13 (78011065) | LF | 2,472 | $2.00 | $2.00 |
| 51 | Raised refl pavt MKR (78100100) | EACH | 2,584 | $45.00 | $45.00 |
| 52 | Raised ref PVT MK rem (78300200) | EACH | 2,584 | $29.80 | $25.00 |
| 53 | PVT MKG rem WTR blast (78300202) | SF | 11,382 | $1.00 | $1.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.